Shift summary, posted by Peter Zalden on 22 Feb 2024, 06:13
|
Beam conditions:
Used photon energies between 6 and 7 keV, including short undulator scans
Continuously got 1 mJ despite the short pulse mode
that's running
Bandwidth was found to be 18 eV FWHM at 6.07 keV (0.3%) by monochromator scan against fixed undulator setpoint
Achievements: |
Shift summary, posted by Tokushi Sato on 21 Feb 2024, 23:00
|
X-ray delivery: stable and flat over 250 pulses per train. 1.1 MHz with 400 uJ
Optical laser delivery: NA
Achievements/Observations: |
Issue, posted by Tommaso Mazza on 17 Feb 2024, 08:15
|
The cross on the FEL imager, which we use as a reference for BKR crew, is not centred on the GATT aperture. when was this changed, and why?
att. 1 and 2 show the current position (the saturated image aids the positioning of the GATT aperture).
att. 3 is from two weeks ago. then, the cross was centred on the GATT aperture. |
Shift summary, posted by Romain Letrun on 15 Feb 2024, 09:32
|
X-ray delivery
1 to ~332 pulses at 6 keV, 4.5 mJ
Stable delivery
Number of pulses limited by the Photon Beam Power local limit
that is set to 16 W. Is this intentional? All other limits are set to 40 W
Achievements/Observations |
Experiment summary, posted by Konopkova Zuzana on 13 Feb 2024, 08:55
|
*Achievements :
- Generally rather successful with very high quality beam parameters
- We had a nearly steady 800 uJ+ HXRSS flux during the user run and ~ 4mJ SASE during the setup at HED. |
Issue, posted by Romain Letrun on 13 Feb 2024, 08:52
|
Like after the previous winter maintenance period, the shutter of FXE appears as opened in DOOCS panels even though it is closed (https://in.xfel.eu/elog/OPERATION-2023/58). |
Shift summary, posted by Giuseppe Mercurio on 13 Feb 2024, 06:38
|
shift summary
Andreas, Giuseppe
continued pumpprobe measurements
around 5:30 we could not see any image at the MTE3 camera (after sample transfer), we tried |
Shift summary, posted by Tokushi Sato on 13 Feb 2024, 01:02
|
X-ray delivery
1-350 at 12.45 keV, 1600 uJ. Stable delivery
Optical laser delivery
None
Achievements/Observations |
Shift summary, posted by Tokushi Sato on 11 Feb 2024, 23:04
|
X-ray delivery
1-350 at 12.45 keV, 1700 uJ. Stable delivery
Optical laser delivery |
Shift summary, posted by Giuseppe Mercurio on 11 Feb 2024, 06:28
|
Night shift summary
Andreas, Giuseppe
we finished to measure sample 17 and 41 in CARD 06_Y2018F04
we transferred sample Card_07_Y2018F19
we started measuring |
Shift summary, posted by Tokushi Sato on 10 Feb 2024, 23:32
|
X-ray delivery
1-350 at 12.45 keV, 1750 uJ. Stable delivery
Optical laser delivery
None
Achievements/Observations |
Shift summary, posted by Tokushi Sato on 10 Feb 2024, 00:12
|
X-ray delivery
1-350 at 12.45 keV, 1700 uJ. Stable delivery
Optical laser delivery
None
Achievements/Observations |
Shift summary, posted by Giuseppe Mercurio on 09 Feb 2024, 07:15
|
night shift summary
achievements:
characterized FEL beam size to have 20 um x 20 um (Hor x Ver)
exchanged sample
closed KB baffle, HSLITS, guardstage
started |
Shift summary, posted by Tokushi Sato on 08 Feb 2024, 23:14
|
X-ray delivery
1-350 at 12.45 keV, 1700 uJ. Stable delivery
Optical laser delivery
None
Achievements/Observations |
Shift summary, posted by Giuseppe Mercurio on 08 Feb 2024, 07:00
|
Late shift 07.02.24
Laurent, Martin
Continued with laser preparation |
Shift summary, posted by Giuseppe Mercurio on 06 Feb 2024, 07:17
|
|
Shift summary, posted by Jörg Hallmann on 05 Feb 2024, 23:10
|
check of the optimized focussing options at 10 keV using only one arm in CRL2 - results still to be evaluated
successful check of the mirror chamber in the experiment hutch of MID - it was possible to reflect the direct beam down and use it under a shallow
angle on the sample position |
Shift summary, posted by Wonhyuk Jo on 04 Feb 2024, 23:36
|
Goal Achieved.
- Finished flat field measurement for AGIPD at different scenarios for upcoming user experiments.
- Aligned the spectrometer at DES and obtained the energy spectrum of 9 keV SASE. |
Shift summary, posted by Jörg Hallmann on 03 Feb 2024, 23:51
|
goals achieved:
alignment of the beam in tunnel and hutches including refinement of the beam in the center of rotation
check of cameras and optical components |
Shift summary, posted by Romain Letrun on 02 Feb 2024, 23:31
|
X-ray delivery
1-64 pulses at 10 keV, ~1.1 mJ.
Overall stable delivery.
Optical laser delivery
NA
Achievements/Observations |