Entry   Shift summary, posted by Peter Zalden on 22 Feb 2024, 06:13 
Beam conditions:


Used photon energies between 6 and 7 keV, including short undulator scans
Continuously got 1 mJ despite the short pulse mode
that's running
Bandwidth was found to be 18 eV FWHM at 6.07 keV (0.3%) by monochromator scan against fixed undulator setpoint


Achievements:
Entry   Shift summary, posted by Tokushi Sato on 21 Feb 2024, 23:00 
X-ray delivery: stable and flat over 250 pulses per train. 1.1 MHz with 400 uJ

Optical laser delivery: NA

Achievements/Observations:
Entry   Issue, posted by Tommaso Mazza on 17 Feb 2024, 08:15 Screenshot_from_2024-02-17_08-12-43.pngScreenshot_from_2024-02-17_08-17-03.pngScreenshot_from_2024-02-03_16-06-39.png
The cross on the FEL imager, which we use as a reference for BKR crew, is not centred on the GATT aperture. when was this changed, and why?

att. 1 and 2 show the current position (the saturated image aids the positioning of the GATT aperture).

att. 3 is from two weeks ago. then, the cross was centred on the GATT aperture.
Entry   Shift summary, posted by Romain Letrun on 15 Feb 2024, 09:32 
X-ray delivery


1 to ~332 pulses at 6 keV, 4.5 mJ
Stable delivery
Number of pulses limited by the Photon Beam Power local limit
that is set to 16 W. Is this intentional? All other limits are set to 40 W


Achievements/Observations
Entry   Experiment summary, posted by Konopkova Zuzana on 13 Feb 2024, 08:55 
*Achievements :
- Generally rather successful with very high quality beam parameters
- We had a nearly steady 800 uJ+ HXRSS flux during the user run and ~ 4mJ SASE during the setup at HED.
Entry   Issue, posted by Romain Letrun on 13 Feb 2024, 08:52 Screenshot_from_2024-02-13_08-51-02.png
Like after the previous winter maintenance period, the shutter of FXE appears as opened in DOOCS panels even though it is closed (https://in.xfel.eu/elog/OPERATION-2023/58).
Entry   Shift summary, posted by Giuseppe Mercurio on 13 Feb 2024, 06:38 
shift summary
Andreas, Giuseppe


continued pumpprobe measurements
around 5:30 we could not see any image at the MTE3 camera (after sample transfer), we tried
Entry   Shift summary, posted by Tokushi Sato on 13 Feb 2024, 01:02 
X-ray delivery


1-350 at 12.45 keV, 1600 uJ. Stable delivery


Optical laser delivery


None


Achievements/Observations
Entry   Shift summary, posted by Tokushi Sato on 11 Feb 2024, 23:04 
X-ray delivery
1-350 at 12.45 keV, 1700 uJ. Stable delivery

Optical laser delivery
Entry   Shift summary, posted by Giuseppe Mercurio on 11 Feb 2024, 06:28 
Night shift summary
Andreas, Giuseppe


we finished to measure sample 17 and 41 in CARD 06_Y2018F04
we transferred sample Card_07_Y2018F19
we started measuring
Entry   Shift summary, posted by Tokushi Sato on 10 Feb 2024, 23:32 
X-ray delivery


1-350 at 12.45 keV, 1750 uJ. Stable delivery


Optical laser delivery





None





Achievements/Observations
Entry   Shift summary, posted by Tokushi Sato on 10 Feb 2024, 00:12 
X-ray delivery


1-350 at 12.45 keV, 1700 uJ. Stable delivery


Optical laser delivery


None


Achievements/Observations
Entry   Shift summary, posted by Giuseppe Mercurio on 09 Feb 2024, 07:15 

night shift summary

achievements:


characterized FEL beam size to have 20 um x 20 um (Hor x Ver)
exchanged sample
closed KB baffle, HSLITS, guardstage
started
Entry   Shift summary, posted by Tokushi Sato on 08 Feb 2024, 23:14 
X-ray delivery


1-350 at 12.45 keV, 1700 uJ. Stable delivery


Optical laser delivery


None


Achievements/Observations
Entry   Shift summary, posted by Giuseppe Mercurio on 08 Feb 2024, 07:00 
Late shift 07.02.24
Laurent, Martin

Continued with laser preparation
Entry   Shift summary, posted by Giuseppe Mercurio on 06 Feb 2024, 07:17 



Entry   Shift summary, posted by Jörg Hallmann on 05 Feb 2024, 23:10 
check of the optimized focussing options at 10 keV using only one arm in CRL2 - results still to be evaluated
successful check of the mirror chamber in the experiment hutch of MID - it was possible to reflect the direct beam down and use it under a shallow
angle on the sample position
Entry   Shift summary, posted by Wonhyuk Jo on 04 Feb 2024, 23:36 
Goal Achieved.
- Finished flat field measurement for AGIPD at different scenarios for upcoming user experiments. 
- Aligned the spectrometer at DES and obtained the energy spectrum of 9 keV SASE.
Entry   Shift summary, posted by Jörg Hallmann on 03 Feb 2024, 23:51 
goals achieved:
alignment of the beam in tunnel and hutches including refinement of the beam in the center of rotation 
check of cameras and optical components
Entry   Shift summary, posted by Romain Letrun on 02 Feb 2024, 23:31 
X-ray delivery


1-64 pulses at 10 keV, ~1.1 mJ.
Overall stable delivery.


Optical laser delivery


NA


Achievements/Observations