Entry   Shift summary, posted by Natalia Gerasimova on 01 Feb 2024, 07:14 
Moning shift summary (31.01 and 01.02)

Acievements:
- SRA recalibrated, cross position on FEL imager found
Entry   Shift summary, posted by Chan Kim on 31 Jan 2024, 23:26 
31.01.2024 (Day shift)

X-ray delivery


10 keV
1200 - 400 uJ (significant pulse energy slope within train)


Optical laser delivery
Entry   SA1 status, posted by Frederik Wolff-Fabris on 31 Jan 2024, 11:24 
A ZZ is taking place today, 31.01 at 11:30, in XTD9 to verify and fix the M3 Pop-in screen which is currently blocking the beam. It is not
yet clear if this is an electrical or mechnical problem.  

** Update 13:05: ZZ intervention is finished and successful. A mechanical issue due to a loose coupling between motor and spindle was fixed.
Entry   Shift summary, posted by Idoia on 27 Jan 2024, 15:17 
SASE3
Open Issues:
- currently it is not possible to change the number of pulses because of Instruments beam permission interlock
Entry   Experiment summary, posted by Naresh Kujala on 28 Jan 2024, 19:55 Screenshot_from_2024-01-28_20-42-59.png
X-ray delivery


0.25nC, 14 GeV, rep rate 2.25 MHz, 9300 eV, 1 to 100 pulses, ~2000 uJ
M1 and M2 mirrors are aligned and beam trajectory to
SPB.


Goal
Entry   Issue, posted by Jan Gruenert on 28 Jan 2024, 13:50 
RC / BKR informs : Beam is down (since 12h10), all beamlines affected

The reason is failure of a quadrupole (power supply) downstream of the dogleg.
The MPS crew is working on recovery, access to XTL ongoing.