Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2024 logbook, Contact: F.Wolff-Fabris, A.Galler, H.Sinn, Page 9 of 11  Not logged in ELOG logo
ID Date Author Group Subject Text Attachments
  45   04 Mar 2024, 06:52 Raphael de WijnSPBShift summary
X-ray
delivery


10 keV, up to 128 pulses
  
  44   01 Mar 2024, 17:11 Naresh KujalaPRCStatus-Machine status

the cold compressor failure occurred
at ~16.30hr today. And it will take around
  
  43   01 Mar 2024, 10:54 Romain LetrunSPBShift summaryX-ray delivery


10 keV, up to 128 pulses
with custom bunch pattern, 1.6-2.0 mJ


Optical
  
  42   01 Mar 2024, 06:30 Jörg HallmannMIDShift summary
Shift
summary (Feb 29th):
Stable seeding with 1mJ + 400mJ SASE
  
  41   29 Feb 2024, 10:04 Romain LetrunSPBShift summaryX-ray
delivery


10
  
  40   29 Feb 2024, 02:41 Jörg HallmannMIDShift summaryStable seeding with 1mJ + 400mJ SASE
HIREX triggered interlock when all
attenuators are removed 
  
  39   28 Feb 2024, 08:57 Peter ZaldenFXESA1 status5.61 keV setpoint in SA1 was confirmed
to correspond to 5.660 keV (+/- 0.003 keV),
see attached.
 2024-02-28-081608_626485769_exflqr51474.png 
  38   28 Feb 2024, 06:57 Peter ZaldenFXEIssueNot sure if this is the cause of the fringes
reported before, but at 5.6 keV there are
clear cracks visible on the XTD2 Attenuators
 2024-02-28-064435_203161010_exflqr51474.png2024-02-28-064443_551842636_exflqr51474.png2024-02-28-064454_671377179_exflqr51474.png2024-02-28-085524_727294913_exflqr51474.png 
  37   27 Feb 2024, 09:56 Romain LetrunSPBIssueThe status of the XTD2 attenuators has
been checked during the experiment last week
and many were found to cause disturbances
 8x 
  36   26 Feb 2024, 14:32 Motoaki NakatsutsumiHEDShift summaryShift summary for 2024-02-25 from
11:00 to 2024-02-25 at 14:00:

Self-seeding at 8.5 keV, with approximately
  
  35   25 Feb 2024, 22:54 Tokushi SatoSPBShift summaryX-ray delivery


9.10 keV; 190 pulses per
train @1.1 MHz with roughly 170-200 uJ; stable
  
  34   25 Feb 2024, 14:47 Motoaki NakatsutsumiHEDShift summaryShift summary for 2024-02-24 from 07:00
to 2024-02-25 at 14:00:

Self-seeding at 8.5 keV, with approximately
  
  33   25 Feb 2024, 00:11 Johan BieleckiSPBShift summaryX-ray delivery
9.10 keV; 190 pulses per train @1.1
MHz with roughly 140-200 uJ; observed some
  
  32   24 Feb 2024, 11:58 Motoaki NakatsutsumiHEDShift summaryShift summary 2024-02-23 07:00 - 2024-02-24 10:00

We got self-seeding at 8.5 keV
very quickly after changeover from 10.5 keV
  
  31   23 Feb 2024, 23:03 Tokushi SatoSPBShift summaryX-ray delivery:

stable and flat over 190 pulses
per train. 1.1 MHz with ~200 uJ
  
  30   22 Feb 2024, 22:52 Tokushi SatoSPBShift summaryX-ray delivery: stable and flat over 190
pulses per train. 1.1 MHz with 200 uJ short
intervention needed to improve intensity
  
  29   22 Feb 2024, 06:13 Peter ZaldenFXEShift summaryBeam conditions:


Used photon energies between
6 and 7 keV, including short undulator scans
Continuously
  
  28   21 Feb 2024, 23:00 Tokushi SatoSPBShift summaryX-ray delivery: stable and flat over 250
pulses per train. 1.1 MHz with 400 uJ

Optical laser delivery: NA
  
  27   17 Feb 2024, 08:15 Tommaso MazzaSQSIssueThe cross on the FEL imager, which we use
as a reference for BKR crew, is not centred
on the GATT aperture. when was this changed,
 Screenshot_from_2024-02-17_08-12-43.pngScreenshot_from_2024-02-17_08-17-03.pngScreenshot_from_2024-02-03_16-06-39.png 
  26   15 Feb 2024, 09:32 Romain LetrunSPBShift summaryX-ray delivery


1 to ~332 pulses at 6 keV,
4.5 mJ
Stable delivery
Number
  
ELOG V3.1.4-7c3fd00