Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2023 logbook, Contact: F.Wolff-Fabris, A.Galler, L.Samoylova, H.Sinn, Page 3 of 24  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry   Shift summary, posted by Chan Kim on 01 Nov 2023, 22:57 

X-ray delivery

  • 19 keV, ~0.9 mJ/pulse, stable delivery

Optical laser delivery

  •  no

Achievements/Observations

  • Finalized allignment
  • Got successful runs with impact from sound eventhough often timing misaligned due to jitter

Issues

  • High jitter from output of transducer (Ch 2in oscilloscope) is problematic
Entry   Shift summary, posted by Johannes Moeller on 01 Nov 2023, 02:22 
  • stable delivery of 1mJ at 18keV SASE
  • succesful beamline alignment for MID (CRLs + M1 and M2) with mono.
  • alignment of NAFO stack to DES and zyla camera with SASE and monochromatic beam
  • setup of DES spectrometer for 18keV on 440 reflection with SASE
  • timing of PP laser with perpendicular excitation condition with diode and YAG

Problems:
Mirror M2 needs 30min to move from SASE to Mono position

Entry   Shift summary, posted by Chan Kim on 31 Oct 2023, 23:08 

X-ray delivery

  • 19keV, 700-800uj

Optical laser delivery

  •  ns laser

Achievements/Observations

  • Vacuum pipe and He pipe for diamond outcoupling installed
  • Aligned beam to downstream
  • Saw the beam at tower position (Zyla camera)
Entry   Status, posted by Jan Gruenert on 30 Oct 2023, 23:18 JG_2023-10-30_um_23.15.36.png

At the end of the MON late shift, the tuning status and obtained lasing pulse energies (ATT#1) are as follows:

  • SA1 at 19 keV : 660 uJ +/- 23 uJ
  • SA2 at 18 keV : 1073 uJ +/- 55 uJ
  • SA3 at 1.2 keV : 4330 uJ +/- 122 uJ

SD for a stable 2 min interval, fast XGM train average (INTENSITY.RAW.TRAIN)

More tuning will happen overnight, and for SA3 the photon energies 2.5keV and 3.0 keV will also be prepared.

Entry   Issue, posted by Jan Gruenert on 30 Oct 2023, 14:36 

The EPD reading system at the turnstiles of XTD10 entrance were not working this morning.
A necessary ZZ access to XTD10 could not be performed in the morning and had to be postponed.
Resetting the system by Michael Prollius was not sufficient.
At 14h20 XO informed that the EPD system was fixed by D3 (an issue with Windows passwords) and again operational.
The ZZ access by XRO concerning VSLIT is therefore proceeding now.

Entry   Shift summary, posted by Raphael de Wijn on 30 Oct 2023, 07:10 

X-ray delivery

  • 7.8keV, ~2.5mj, no beam before 1:15am
  • One undulator was not moving, expert was called

Optical laser delivery

  • ns laser for particle imaging

Achievements/Observations

  • RGA used for quantitative gas BG analysis
  • Collected more data from 55 nm Ag cube
  • Collected some sucrose data
  • Collected gold bipyramids data

Issues

  • Could not get sucrose droplets delivered to the interation point while injecting He at the bottom of the skimmer. As soon as it was enough He to decrease N, droplets desappeared.
  • Still some questionmarks regarding the gas flows through the skimmer section into the chamber. More tests in the lab necessary.
Entry   Shift summary, posted by Konopkova Zuzana on 28 Oct 2023, 14:52 

Beam parameters: 18 keV, 1 pulse, 600 uJ

- user beamtime started Friday, the 27th and going smoothly until now and we are in data collection mode

- shock compression setup with XRD and DiPOLE

- machine performance very stable in pulse energies with little downtimes

Entry   Shift summary, posted by Chan Kim on 27 Oct 2023, 06:35 

X-ray delivery

  • 7.8keV, 2.5mj, stable delivery, homogeneos intra train energy most of the time.

Optical laser delivery

  • ns laser for particle imaging

Achievements/Observations

  • RGA installed and used for quantitative gas BG analysis
  • Data (55 nm Ag cube) and gas BG (no sample) measured with two different gases (N2 and He)
  • BG roughly 3.5x better with 3 l/min He flow, but only about 2x better with 3 L/min He + N2/CO2 for stable Tayler cone

Issues

  • Pulses often changed from 352 to 28 for no apparent reason, discovered later that it was happening when closing silicon 500 XTD2 arm (elog:421)
Entry   Issue, posted by Chan Kim on 27 Oct 2023, 03:19 Screenshot_from_2023-10-27_03-09-25.png

We observed auto changes of the number of X-ray pulses last night and tonight.

It is related to 500 um thick Si attenuator in XTD2_ATT.

Even with 2.4 mm thick CVD (XTD2_ATT) IN, the number of pulses @SA1 changes to 28 whenever we insert 500 um thick Si attenuator.

Watchdog triggered this process. It has to be updated.

 

First row in the atttachment: The number of X-ray pulses @ SA1

Second row in the attachment: Status of 2.4 mm thick CVD in XTD2_ATT

Third row in the attachment: Status of 0.5 mm thick Si in XTD2_ATT

Entry   Late shift summary, 26.10.2023, posted by Robert Carley on 26 Oct 2023, 23:25 

Achievements:

  1. Continued with tr-RIXS

No problems

Entry   Morning shift summary, 26.10.2023, posted by Sergii, Teguh on 26 Oct 2023, 15:03 

Morning shift summary, 26.10.2023

Achievements:

  1. Continued measuring tr-RIXS at different laser fluences

Problems:

  1. The max-jhub notebook server was very slow this morning around 9-10 h. DOC was informed, but the slowness has improved without any action from either them or our side. The reason for this slowness is still unknown, but the max-jhub server has come back to normal for now.
Entry   night shift summary, posted by Andreas Scherz / Eugenio Paris on 26 Oct 2023, 07:13 

Night shift summary

Achievements:
- Recovered time0 on SiN (time0 moved >20ps after FEL beam loss in the evening)
- Collected static RIXS (actually with laser but negative delay) at the CDW at 113 kHz for different temperatures to investigate the effect of heating from the x-rays and from the laser

Problems:
- during late shift and after a beam dump in the evening, trRIXS signal could not be recovered. By checking the rough timing, they found a change in the x-ray arrival time of the order of >20 ps. 
- We checked the beamline alignment and found that the pointing from the machine was off, requiring BKR to tune We also found that the photon energy offset between mono and undulators changed. Beam looked horizontally diffracted and the beam pointing moved in horizontal and was hitting the horizontal slits. We translated the open horizontal slits and pitch the beam properly into SCS branch with M5.

Entry   Shift summary, posted by Chan Kim on 26 Oct 2023, 07:10 

X-ray delivery

  • 7.8keV, 2.4mj, stable delivery, homogeneos intra train energy most of the time.

Optical laser delivery

  • ns laser for particle imaging

Achievements/Observations

  • AGIPD BG optimized by opening Q2 & Q4 quadrants a few pixels and adding Pb shield on IRU_SLIT4
  • NKB focused optimized
  • Data (75 nm Ag cube) and gas BG (no sample) measured with two different gases (N2 and He)

Issues

  • AGIPD BG near the center (1-2 pixels) were quite strong even with tight sliting, but issue solved by opening two quadrants (Q2 & Q4) and moving CSS about 1-2 pixels (elog:12731)
  • Found additional AGIPD BG in Q2M1 module (mid-Q range), but issue solved by adding Pd shield on IRU_SLIT4 (elog:12734)
Entry   Shift summary 25.10.2023, posted by Diogo Filipe Monrroy Vilan e Melo on 26 Oct 2023, 06:48 

Staff: DM, CK, KK, JB, SR (SEC), LW (Uppsala university), MM (GU)

X-ray delivery

  • 7.8keV, 2.4mj, stable delivery, homogeneos intra train energy most of the time.

Optical laser delivery

  • ns laser for particle imaging

Achievements/Observations

  • AGIPD BG optimized by opening Q2 & Q4 quadrants a few pixels and adding Pb shield on IRU_SLIT4
  • NKB focused optimized
  • Data (75 nm Ag cube) and gas BG (no sample) measured with two different gases (N2 and He)

Issues

  • AGIPD BG near the center (1-2 pixels) were quite strong even with tight sliting, but issue solved by opening two quadrants (Q2 & Q4) and moving CSS about 1-2 pixels (elog:12731)
  • Found additional AGIPD BG in Q2M1 module (mid-Q range), but issue solved by adding Pd shield on IRU_SLIT4 (elog:12734)

Instrument status

  • AGIPD HV off.
  • AGIPD gate valve closed and pinned.
  • Attenuators set to thickest diamond.
  • Vacuum valves closed.

To do for next shift

  • Check focus and slit position and continue the program (data measurement).
Entry   Morning Shift Summary, 25.10.2023, posted by Sergii, Teguh on 25 Oct 2023, 15:18 

Morning Shift Summary, 25.10.2023

Achievements:

  1. Re-aligned FEL beam pointing and beamline mirrors after XGM intensity drop due to slow beam pointing drift over night.
  2. Continued taking momentum-dependent tr-REXS data.

Problems:

  1. There was slow drift of FEL beam pointing over night, causing XGM intensity to slowly drop over time.
  2. The slow drop of XGM intensity continues even after beamline alignment. Compared to morning, the XGM intensity has dropped by ~10%.
  3. It is advisable to re-check the beam pointing again some time before the night shift due to correct for this beam drift problem.
Entry   Morning Shift Summary, 24.10.2023, posted by Sergii, Teguh on 25 Oct 2023, 15:10 

Morning Shift Summary, 24.10.2023

Achievements:

  1. Re-aligned the beamline after maintenance
  2. Found time zero using SiN at 300 K
  3. Change the He dewar and cooled down back to 20 K
  4. Adjusted the AFS laser parameters to recover the proper experiment settings
  5. Started taking tr-RIXS with several time delay points

Problems:

  1. The AFS laser power is smaller than last week

Next shift plan:

  1. Continue taking tr-RIXS data
Entry   other, posted by Chan Kim on 25 Oct 2023, 06:02 Screenshot_from_2023-10-25_05-27-43.pngScreenshot_from_2023-10-25_05-27-13.png

Issue solved (elog:410) after changing NKB mirror coating to B4C.

 

Entry   Shift Summary, posted by Diogo Filipe Monrroy Vilan e Melo on 25 Oct 2023, 06:02 

Staff: DM, CK, KK

X-ray delivery

  • 7.8keV, 2.4mj, stable delivery, homogeneos intra train energy most of the time.
  • SASE 3 background

Optical laser delivery

  • no laser used

Achievements/Observations

  • Aligned until IRU, until before full beam test

Issues

  • Valve after AGIPD was disconnected elog:12718
  • SASE 3 background affecting beam focus at IRU elog 12722
  • AGIPD scattering, could not solve fully with slits, to be improved tomorrow

Instrument status

  • AGIPD HV off.
  • AGIPD gate valve closed and pinned.
  • Attenuators set to thickest diamond.
  • Vacuum valves closed.

To do for next shift

  • Continue with alignment, then experiment.
  • Check slits or other solution for AGIPD scattering
  • Confirm the beam focus impact from SASE 3 background, after we moved NKB coating (verify if it remains)
Entry   Issue, posted by Chan Kim on 25 Oct 2023, 04:48 Screenshot_from_2023-10-25_02-37-38.pngScreenshot_from_2023-10-25_02-42-21.pngScreenshot_from_2023-10-25_02-35-35.pngScreenshot_from_2023-10-25_02-36-16.png

SA3 background is very strong and it affects our NKB (nano KB, Ru coating) focus.

 

Attachment 1: optimized NKB focus with 1 pulse @SA3

Attachment 2: optimized NKB focus + SA3 BG with 375 pulses @SA3

Attachment 3: optimized NKB focus with 375 pulses @SA3

Attachment 4: optimized NKB focus with 375 pulses @SA3, but after changing number of pulses to 1 @SA3

Entry   SASE 3 background heavily impacts our focus, posted by Diogo Filipe Monrroy Vilan e Melo on 25 Oct 2023, 02:43 Screenshot_from_2023-10-25_02-21-29.pngScreenshot_from_2023-10-25_02-36-16.pngScreenshot_from_2023-10-25_02-37-38.pngScreenshot_from_2023-10-25_02-42-21.png

Attch 1: We were having trouble focusing at IRU chamber. After multiple attempts the best we could achieve was 2.9-3.1 um beam.

Attch 2: We then wanted to test if this was caused by the SASE 3 background, after them changing from >350 pulses to 1, we saw an instant improvement of ~0.5um down to 2.3 um beamsize.

Attch 3: After optimizing without SASE 3 background, we got down to 1.9 um (1 um less then with SASE 3).

Attch 4: Finally, after SASE 3 changing back to their <350 pulses the beam now changed from 1.9 to 3.9 um! (instead of the previous 3.1um)

 

This because the SASE1+SASE3 focus =/= SASE1 focus....

 

We did not have much time to tune the beam without SASE 3 background, we should think about managing this tomorrow during alignment, and also for data collection...

ELOG V3.1.4-7c3fd00