Group Selection Page HELP Controls Group Data Analysis Group ITDM WP76 DET Vacuum EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Operation PSPO XO TS Migrated2Zulip
OPERATION-2025 OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2023 logbook, Contact: F.Wolff-Fabris, A.Galler, L.Samoylova, H.Sinn, Page 15 of 24  Not logged in ELOG logo
Entry   Shift end, posted by Jayanath Koliyadu on 10 Feb 2023, 08:17 


X-ray delivery


9.3 keV, 1-85 pulses, 1 mJ, stable delivery


Optical laser delivery
Entry   Shift end, posted by Jayanath Koliyadu on 11 Feb 2023, 07:06 
X-ray delivery


9.3 keV, 1-85 pulses, 1 mJ, stable delivery


Optical laser delivery


800 nm, 1-226 pulses, stable delivery
ns laser for illumination


Achievements/Observations
Entry   Shift end, posted by Jayanath Koliyadu on 21 Mar 2023, 23:36 
Staff: JB, PV, TS, RL, RdW, JK, AR

X-ray delivery


1-165 pulses, 1.1 MHz, upto 400  uJ @ 50 pC


Optical laser delivery
Entry   Shift end, posted by Jayanath Koliyadu on 23 Mar 2023, 23:24 
X-ray delivery


1-165 pulses, 1.1 MHz - 28.2 kHz, upto 400  uJ @ 50 pC


Optical laser delivery


ns laser for imaging


Achievements/Observations
Entry   Shift end, posted by Jayanath Koliyadu on 24 Mar 2023, 23:14 
X-ray delivery


1-165 pulses, 1.1 MHz - 28.2 kHz, upto 350  uJ @ 50 pC


Optical laser delivery


ns laser for imaging


Achievements/Observations
Entry   Shift end, posted by Jayanath Koliyadu on 25 Mar 2023, 23:18 
X-ray delivery


1-165 pulses, 1.1 MHz - 56.4 kHz, upto 350  uJ @ 50 pC


Optical laser delivery


ns laser for imaging


Achievements/Observations
Entry   Shift end, posted by Jayanath Koliyadu on 26 Mar 2023, 23:27 
X-ray delivery


1-165 pulses, 1.1 MHz - 56.4 kHz, upto 350  uJ @ 50 pC


Optical laser delivery


ns laser for imaging


Achievements/Observations
Entry   Shift end, posted by Jayanath Koliyadu on 08 Aug 2023, 22:57 
X-ray delivery


9.3 keV, ~ 2 mJ, stable delivery except for the intensity slope along the train (fixed later on)


Optical laser
delivery
Entry   Shift end, posted by Jayanath Koliyadu on 12 Aug 2023, 22:50 
X-ray delivery


9.3 keV, up to 181 pulses at 564 kHz, 1.8 - 1.9 mJ


Optical laser delivery


PP Laser, 800nm, 50 fs, up to 181 pulses @ 564 kHz and 91 pulses at 282 kHz, stable delivery


Achievements/Observations
Entry   Shift end, posted by Jayanath Koliyadu on 13 Aug 2023, 21:33 
X-ray delivery


9.3 keV, up to 181 pulses at 564 kHz, 8 - 1.3 mJ
Issue with pulse energy stability along the pulse train in the morning but
optimzed later on in the day


Optical laser delivery
Entry   Shift end, posted by Jayanath Koliyadu on 20 Sep 2023, 02:09 
X-ray delivery


7 keV, 2.1 mJ, stable delivery


Optical laser delivery


None


Achievements/Observations
Entry   Shift end, posted by Jayanath Koliyadu on 19 Oct 2023, 23:30 
X-ray delivery


13.6 keV, ~1.7 mJ and up to 352 pulses at 1.1 MHz


Optical laser delivery


PP laser, 1 to 202 pulses, stable delivery except for the down time of ~1h


Achievements/Observations
Entry   Shift end, posted by Jayanath Koliyadu on 15 Nov 2023, 07:10 
X-ray delivery


1.3-1.7 mJ, 1-30 pulses, stable delivery


Optical laser delivery


None


Achievements/Observations
Entry   Shift end, posted by Jayanath Koliyadu on 20 Nov 2023, 07:12 
X-ray delivery


1.3-1.7 mJ, 10.7 keV, 1-100 pulses, stable delivery


Optical laser delivery


None


Achievements/Observations
Entry   KW44 - Leak in Solid Attenuator, posted by Janni Eidam on 07 Nov 2023, 15:57 20231106_180901.jpg20231106_175457.jpg20231106_175612.jpg20231106_185102_(1).jpg
There was a leak in the Solid Attenuator that increased on Saturday morning when SPB moved the arm number 4 (see last entry ID 236).

We were lucky that a balance developed between the leak and the pumping of the ion pumps, so by setting the setpoints of the three most affected
ionpumps to 5x10-5 mbar we could survive the weekend and save the beamtime. 
Entry   shift summary, posted by Jan-Etienne Pudell on 21 Feb 2023, 23:07 
- Tunnel + experimental hutch alignment (Mirrors, CRL1 and CRL2)

- Aligned main devices: Optics Peter, x-ray eye, EPIX and Zyla and pin holes.

- Tried some alignment of the NFL (1D) lenses with pin hole and not pre focussed beam. We found a lot of scattering from pinholes which dominates
Entry   shift summary, posted by Jan-Etienne Pudell on 23 Feb 2023, 01:51 
After realignement of M1 and M2 we could solve the problem of the elogated beamprofile. Different lens setting were prealignd for the use in combination
with the NFL.

We took data for several 1D diamond lenses together with a Vycor sample to extract the beamsize from the specles.
Entry   shift summary, posted by Jan-Etienne Pudell on 24 Feb 2023, 00:55 
We tested pulse on demand scans with scantool and confirmed that there is only one shot per scan point. This was used to print the footprint in
a LIf crystal.

We took caustic scans for 1D diamond lenses using a wire and using specles to extract the beamsize.
Entry   Shift summary, posted by Jan-Etienne Pudell on 04 May 2023, 01:22 
Shift summary:

- get the beam with 23keV and 120µJ 

- falignment of mirrors m1 and m2 on the pt stripe at 23keV
Entry   Shift summary, posted by Jan-Etienne Pudell on 05 May 2023, 02:16 
X-ray delivery:

- stable at 120µJ, mostly 63 pulses

- 1:30h downtime
ELOG V3.1.4-7c3fd00