Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2023 logbook, Contact: F.Wolff-Fabris, A.Galler, L.Samoylova, H.Sinn, Page 10 of 24  Not logged in ELOG logo
ID Date Author Group Subject Text Attachments
  289   05 Aug 2023, 15:33 Ben, JustineSCSShift summaryAchievements


Measured XAS and RIXS from
NdNiO3 test sample at 230 K


Plan
  
  288   05 Aug 2023, 08:20 Romain LetrunSPBShift summaryX-ray delivery


9.3 keV, 1-202 pulses at
1.13 MHz, 1.9-2.1 mJ.
Overall
  
  287   04 Aug 2023, 23:20 Andreas, SergiiSCSlate shift summaryachievements:


hooked up sample cooling
and reached 20K at sample at typical low
  
  286   04 Aug 2023, 07:10 Giuseppe Mercurio, Teguh AsmaraSCSnight shift summaryachievements:


changed the LEPM to optimize
resolution
found 140 meV


problems:
  
  285   02 Aug 2023, 06:44 Giuseppe Mercurio, Teguh AsmaraSCSshift summaryachievements:


beam transport with the
second half of undulators closed
measured
  
  284   31 Jul 2023, 01:42 Sergii, MartinSCSNight shift summary 30.07.2023Achivements:

-We measured vertical spot size
for several VFM settings
  
  283   30 Jul 2023, 23:06 Ulrike BoesenbergMIDShift summary9 and 10keV beam, up to 30 bunches, significant
drop in intensity in the morning and in the
evening.
  
  282   30 Jul 2023, 18:35 Giuseppe, AndreasSCSMorning Shift summaryachievements:


calibration of exit slits
measurement
of Cu L3 edge
moved hRIXS to nominal
  
  281   30 Jul 2023, 02:02 Ulrike BoesenbergMIDShift summary9.3 keV, 1-35pulses, stable delivery ~600uJ
*General alignment of MID branch to
the DES
  
  280   29 Jul 2023, 23:46 Adam RoundSPBShift endX-ray delivery


12.4 keV, up tp 352 pulses
but the intensity drop across the train was
  
  279   29 Jul 2023, 17:57 Harald SinnPRCIssueThe hutch search of SASE3, SXP became defective
around 5am. 

DESY MPS group replaced a defective
  
  278   28 Jul 2023, 15:37 Harald SinnPRCStatusGood news: The 'jitter'-tests was
sucessful and BKR could identify the jitter
source related to a wrong software setting
  
  277   28 Jul 2023, 14:56 Giuseppe Mercurio, Laurent MercadierSCSend of shift summaryachievements:


found new M2 bender position
for focusing using blank
tried
  
  276   28 Jul 2023, 14:46 Harald SinnPRCStatusAs discussed, there will be a beam interuption
form 14:45 until probably 15:45 related to
jitter studies at A1 that the BKR would like
  
  275   28 Jul 2023, 06:38 Sergii, ManuelSCSShift Summary 27_07_23 nightAchievements:

1. Beam in sample chamber, almost
overlapping with ALAS
  
  274   25 Jul 2023, 19:18 Harald SinnPRCStatusAfter the 12 hour cryo failure last night,
it was decided to exchange a faulty window
with some reduced transmission at the
  
  273   23 Jul 2023, 17:28 Frederik Wolff-FabrisPRCStatusPhoton Activities by XPD colleagues
in SA3 are concluded on Sunday 23.07 at 17:00.
The photon commissioning activities are concluded
  
  272   21 Jul 2023, 20:31 Silja SchmidtchenXROShift Summary SA2Alignment to HED: https://in.xfel.eu/elog/XRO+Beam+Commissioning/205

SA2 - divergence with various M2
bender positions  HED - https://in.xfel.eu/elog/XRO+Beam+Commissioning/200
  
  271   21 Jul 2023, 17:22 Kelin TascaXROSummary of SA1 shift for XO and instrumentsPBLM checked:  https://in.xfel.eu/elog/XRO+Beam+Commissioning/203

Solid attenuators checked: https://in.xfel.eu/elog/XRO+Beam+Commissioning/194
  
  270   21 Jul 2023, 16:54 Antje TrappXROBeam aligned to HEDPosition stored in XRO setpoints - F and
HED setpoints - A
 2023-07-21_16-52-28_HED-final-position.png 
ELOG V3.1.4-7c3fd00