Entry   SCS Rack Room, posted by Orkidia Bilani on 08 Dec 2022, 13:12 

The door of the SCS rack room is functional again.

The cause of the SCS rack room door jamming was a piece of cardboard that was inserted into the door latch opening by a person. That has been removed and the door is working again.

Entry   HiBEF: Waste, posted by Orkidia Bilani on 09 Dec 2022, 09:44 HiBEF_Waste.jpg

A pallet with waste from HiBEF was removed from the hall and disposed.

 

 

Entry   HiBEF Rack , posted by Orkidia Bilani on 09 Dec 2022, 09:46 Rack_.jpg

A rack to give away from HiBEF has found a new owner , the SQS (N.Rennhack).

 

 

Entry   SQS, posted by Orkidia Bilani on 09 Dec 2022, 11:54 SQS_ThermalG_c.jpgSQS_ThermalG_a.jpg

Contacted SQS (N.Rennhack) and suggested solution  for three chemical kanisters "Thermal G for Julabo" located at the entrance of their hutch.

They have been removed from there, and are now located in the chemicals' storage.

Coworkers: V. Bazhenov, O. Bilani

 

Entry   HiBEF: Bellows and pipes to give away, posted by Orkidia Bilani on 09 Dec 2022, 13:32 Bellows_and_Pipes.jpg

HiBEF had a Gitterbox with various bellows and pipes to give away.

SQS is now the new owner. :-) Are now stored in SQS labs in the E floor.

Entry   Craning for SXP, posted by Orkidia Bilani on 14 Dec 2022, 07:27 

V. Vardanyan asked for the XHCrew support in craning in the SXP experiment hutch. Will meet him on 15.12 for further details.

Entry   Update: Stored parts in XHE1, posted by Orkidia Bilani on 19 Dec 2022, 12:42 

The documentation for the storeed parts in the shaft building XHE1 has been updated and uploaded to Alfresco (see link below):

https://docs.xfel.eu/share/page/site/x-ray-operations/document-details?nodeRef=workspace://SpacesStore/b34eece4-1700-4d93-b546-aff1645a00f8

 

Entry   MID pump on the exp. hutch roof, posted by Orkidia Bilani on 02 Jan 2023, 09:14 MiD_pump_roof.jpg

On the roof of the MID exp. hutch one of the pumps is making  strange loud noises (laut zischen). The display is off, same as the other pump close to that (which is switched off).

Contacted/called Andreas Schmidt, he assumed that, that is not good with the pump, but cannot solve the problem because he is in home office today and directed me to A.Bartmann.

Tried to reach A. Bartmann, without success (for the moment).

-----10:15----: Reached A. Bartmann, problem solved. Er hat die Stickstoffleitung ausgestellt.

 

Entry   VAC - Hera clean tent lamellen, posted by Orkidia Bilani on 04 Jan 2023, 14:42 

Bianca (VAC) wanted some of the Hera clean tent curtains (currently in XHE1) here in campus (in order to make a Gehäuse for the dewars, sie hatte schon mit Lorenz darüber gesprochen).

Went together there and brought 15 pieces here, stored now in the VAC lab.

 

 

Entry   HED, posted by Orkidia Bilani on 06 Jan 2023, 10:54 HED_1.jpgHED_2.jpg

Contacted S. Göde from HED to remove from the hall the wooden pallet with big empty boxes, currently located in front of the MID hutch. He/his colleagues will do so, and also a big wooden empty box (located next to this pallet)  belongig to HED will get removed from the hall.

Also, talked to him about the coffee corner in front of the HED hutch, which is untidy and still with rest boiled coffee from the last user run and unwashed cups. He will take care of that quite soon.

 

 

Entry   HED: Update entry of 06.01.2023, posted by Orkidia Bilani on 09 Jan 2023, 11:41 HED_1_9Jan23.jpgHED_2_9Jan23.jpg

-> The pallet with empty Kartonkisten as well as the other one with the big empty wooden box are removed from the hall (carried out by the HED colleagues).

-> The coffee rests and dirty mugs were cleaned up (carreied out by the HED colleagues).

 

Entry   Lights in the Experiment Hall, posted by Orkidia Bilani on 11 Jan 2023, 17:53 

Lights in the experiment hall needed to be exchanged, and in the SA1 and SA2, three of them were not working.

Torsten Schön was informed already last year, and in the RedMine he replied today following:

"The first row, between northern outer wall and SASE3 has been exchanged with the new lights for testing. The new lights are accepted and ordered. Delivery time 6 weeks at least."

Entry   SQS Support: 19-20.01.2023, posted by Orkidia Bilani on 11 Jan 2023, 17:58 

SQS requested the following support  from XHCrew:


Thursday and Friday of next week SQS expect to carry on some installation works in their hutch with expected activities:

- To make modifications to an existing frame
- To assemble a new frame
- Support with craning into the hutch of COMO source

 

Entry   Weiss Klimatechnik: acoustic warning signal, posted by Orkidia Bilani on 12 Jan 2023, 08:28 

In the balcony between SA4 and SA5 an acousitic signal was triggered. It is nothing serious (automatische Wartung, every 300 hours?)  TS gets the notification anyway.

The acoustic signal was muted.

Video file can be found under:   N:\bilani\public

 

Entry   Updated Inventory List of the Stored Parts in XHE1, posted by Orkidia Bilani on 18 Jan 2023, 14:37 

Inventory of the parts and components stored in XHE1 has been updated and uploaded into the Alfresco page of XO:

https://docs.xfel.eu/share/page/site/x-ray-operations/document-details?nodeRef=workspace://SpacesStore/895aab2e-f0fe-4167-adff-f938f7a12235

Entry   XHE1 Organization, posted by Orkidia Bilani on 09 Feb 2023, 15:02 

Went with Lorenz to XHE1 and discussed the structuring of XHE1 and the future Lagerhalle in Ütersen. The few empty boxes of the instruments as well as parts/materials which will not be used within 1 year by the instruments, will be placed in the new Lagerhalle in Ütersen.

Waste and unknown stuff in XHE1, which is there before XHCrew time will be sorted out by TS.

In the still Außerlager near Campus recently there is one Werkzeugschrank dazu gekommen. This we will take on Tusday, 14.02 for the Storage Center of Consumables under XHCrew hutch.

Entry   MID Support, posted by Orkidia Bilani on 09 Feb 2023, 15:15 

MID (K.Sukharnikov)  asked for our support for the Change of Configuration in their hutch. This will take place next week Thursday, 16.02.2023 after the Hall Organization Meeting (around 10:15)

Entry   Cabinet from EEE, posted by Orkidia Bilani on 13 Feb 2023, 10:11 Schrank_1.jpg

We got a cabinet from EEE which would be brought in the consumables' storage under the XHCrew hutch.

They will give us two more in the near future.

Thanks to: Kai-Erik Ballak and Patrick Geßler

Entry   Cainet brought into the XHEXP1, posted by Orkidia Bilani on 13 Feb 2023, 13:03 

The cabinet is now in the consumables' storage under the XHCrew hutch.

Co-workers: M.Lüdeke, O. Bilani

Entry   Transport to XHE1, posted by Orkidia Bilani on 17 Feb 2023, 11:56 VAC_3.jpgVAC_4.jpg

The "Gestelle" of the Vacuum group transported to XHE1: QR: 44460 and QR 44462 (3x).

Co-workers: H.Heuer, M. Pooch, O.Bilani