Group Selection Page HELP Controls Group Data Analysis Group ITDM WP76 DET Vacuum EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Operation PSPO XO TS Migrated2Zulip
XHCrew
  XHCrew logbook, Page 48 of 59  Not logged in ELOG logo
Entry   HiBEF: LN2 Dewar, posted by Orkidia Bilani on 21 Feb 2024, 13:14 
Filled a LN2 dewar for HiBEF (C. Baehtz).

 
Entry   Transport to XHEXP1: SCS, posted by Orkidia Bilani on 27 Feb 2024, 10:03 IMG_20240227_093706_MP.jpg
Transport from XHE1 to XHEXP items (QR: 44451,  44452,  44453 and 46867) for SCS.

Co-workers: M. Pooch, O. Bilani
Entry   SQS Support in XHE1, posted by Orkidia Bilani on 27 Feb 2024, 15:43 SQS.png
Suppoerted SQS in XHE1 with disassembling parts from the cluster source and transported these components back to XHEXP1.

Co-workers: Y. Ovcharenko, A. Igharas, O. Bilani
Entry   General, posted by Orkidia Bilani on 01 Mar 2024, 14:05 IMG_20240301_102411_MP.jpgIMG_20240301_103222_MP.jpgIMG_20240301_135236_MP.jpg
-> Stromkabel @SQS:

The yellow and the orange ones was/is on the way in the experiment hall, posing thus a Stolpergefahr. Discussed with N. Rennhack and T. Baumann,
the yellow one has been removed.
Entry   Damaged concrete floor in SASE3 and SASE2, posted by Orkidia Bilani on 05 Mar 2024, 14:42 
The damages of the concrete floor in SCS area and SASE3 in general, as well as the damages in SASE2 under the truck bay were discussed with K. Löptien.

The repair from the care takers will start very soon.

 
Entry   SXP Support , posted by Orkidia Bilani on 08 Mar 2024, 15:37 IMG_20240308_133712_MP.jpgIMG_20240308_132948_MP.jpgIMG_20240308_132930_MP.jpgIMG_20240308_133016_MP.jpgIMG_20240308_133000_MP.jpg
SXP wanted to buy and place a cabinet under the stairs in front of their experiment hutch and asked for advice. Unfortunately it wouldn't have worked,
because of the narrow and low space/hight under the stairs (Stossgefahr).

In the exp. hutch they do have a (office) cabinet to store their experiment specific parts, which is not so quite allowed. 
Entry   Not needed consumables , posted by Orkidia Bilani on 11 Mar 2024, 10:26 IMG_20240311_095758_MP.jpg
A palett with unneeded consumables was sent to the warehouse and O. Smith will take care of that.
Entry   SXP: Consumables Storage, posted by Orkidia Bilani on 13 Mar 2024, 15:42 IMG_20240313_170301_MP.jpg
V. Vardanyan (SXP) gave a box full of consumables for the consumables storage.
Entry   Consumables Storage, posted by Orkidia Bilani on 13 Mar 2024, 21:09 
Sorted out a box with screws, nuts, u.Ä., which was donated from SXP.
Entry   SCS: Consumables Storage, posted by Orkidia Bilani on 15 Mar 2024, 10:57 IMG_20240315_095619_MP.jpg
SCS gave a box full of consumables for the consumables storage.
Entry   Waste in the Experiment Hall , posted by Orkidia Bilani on 18 Mar 2024, 08:03 IMG_20240318_075824_MP.jpg
Disposed waste from the Experiment Hall.
Entry   SCS Transport, posted by Orkidia Bilani on 19 Mar 2024, 14:32 
Discussed with J.T. Delitz about the transport of their components. He will label the parts and where to be transported. We'll find them tomorrow
ready in the hall.

 
Entry   SCS Support: Transport to Warehouse , posted by Orkidia Bilani on 20 Mar 2024, 10:55 IMG_20240320_102226_MP.jpgIMG_20240320_102653_MP.jpg
SCS: Brought a chiller and a pallet with boxes with equipment at the warehouse.
Entry   SQS: Emergency craning , posted by Orkidia Bilani on 22 Mar 2024, 13:47 IMG_20240322_111619_MP.jpg
Craned for SQS the chain of the manual crane. 

This because the REMI needed to be repaired. 

The core of REMI was craned manually by Rebekka, Ares and Sergey.
Entry   Terminal at XHEXP1: TH1 near SQS, posted by Orkidia Bilani on 25 Mar 2024, 14:22 
The transponder system on the turnstile near SQS (TH1)  doesn't work. Informed SRP and they are working on it.

 
Entry   Work on the Consumables' Storage, posted by Orkidia Bilani on 27 Mar 2024, 14:06 
26.03.2024: Planned and worked on the consumables's storage.

 

O. Bilani, S. Menzel
Entry   HiBEF Waste, posted by Orkidia Bilani on 03 Apr 2024, 08:27 IMG_20240403_081513_MP.jpgIMG_20240403_081937_MP.jpg
Disposed the left over waste from the pulser (Baureste) out of the Experiment Hall.

Co-workers: B.Näser, O.Bilani
Entry   Waste , posted by Orkidia Bilani on 10 Apr 2024, 08:16 IMG_20240410_080713_MP.jpg
Disposed waste (Brandlast) out of the Experiment Hall.
Entry   Consumables' storage , posted by Orkidia Bilani on 26 Apr 2024, 16:19 IMG_20240426_140309_MP.jpgIMG_20240426_140319_MP.jpg
The four pallets with consumables, which O.Smith gave, have been all placed ordered in the cabinets of XHCrew consumables' storage.

Brought the empty pallets and boxes back to the warehouse.

 
Entry   SASE3: Dräger, SCS Empore , posted by Orkidia Bilani on 09 May 2024, 14:25 IMG_20240509_105827_MP.jpgIMG_20240509_105859_MP.jpg
T. Mazza (SQS) called to inform about an alarm at the Dräger gas cabinet.

Went to quit/mute the alarm (yellow alarm level) took pictures, informed and sent the pics to TS OCD (C. Holz), who will take care tomorrow early
in the morning (in case this will not affect the experiment today).
ELOG V3.1.4-7c3fd00