Entry   Waste: Cardboard boxes, posted by Orkidia Bilani on 01 Apr 2023, 09:37 1April_2023.jpg

Removed from the experiment hall all the empty cardboard boxes scattered around.

Entry   Consumables Storage, posted by Orkidia Bilani on 02 Apr 2023, 13:38 

Sorted out various screws in boxes and cabinets.

Wrote down the list of content for the blue cabinet.

Sorting out to be continued :-)

Entry   SQS Support, posted by Orkidia Bilani on 05 Apr 2023, 18:14 

Went with Yevheniy and Sergei to XHE1. They dismount and took some controllers and cables from the COMO setup.

Entry   Consumables Storage, posted by Orkidia Bilani on 05 Apr 2023, 21:22 

Sorted out various screws in boxes and cabinets.

To be continued...

Entry   Consumable Storage, posted by Orkidia Bilani on 20 Apr 2023, 18:16 

Again sorted out various screws in boxes and cabinets.

William helped as well.

Sorting out to be continued :-)

Entry   Consumables' Storage, posted by Orkidia Bilani on 20 Apr 2023, 20:03 

Only a few screws are left over to sort out.

Next steps would than be: nuts, waschers, Gewindestifte and vacuum parts.

:-)

 

 

Entry   SCS Support, posted by Orkidia Bilani on 27 Apr 2023, 07:16 

Supported SCS in dismounting and craning a chamber and its support plates in the SCS experiment hutch.

Coworkers: O.Bilani, W. Aplin, J-T. Delitz

Entry   Schichtübergabe: 13.05 - 14.05.2023, posted by Orkidia Bilani on 14 May 2023, 07:17 7x

The warning acoustic signal was activated (the Klimaanlage, X.TL_XHEXP1_D02 at the end of SA1, roof). Muted it, not a problem, still TS informed since O. Engelmann was onsite (see pic).

FXE: For Monday, 15.05, the dewars # 25581 and # 25085 to be refilled. Contact M.Knoll or P. Frankenberger for the time to pick it up (since they do not have Zugang to the LKW Schleuse). They will need only one, ask which exactly they need.

Brought the Wasserbehälter and a a pallet with Kabeln into the LKW Schleuse, which were at XTD8 and belonged to TS (see pic).

Removed from the hall and disposed a useless pallet which was located in front of the Pulserraum (see pic).

Thomas Baumann gave me a box with consumables/screws (see pic).

Sorted out almost all the "Gewindestifte" and labeled them.

Sorted out a lot of nuts and washers (Sascha please name them, I don't know their names :-)) see pic.

 

 

 

Entry   Day and Evening Report, posted by Orkidia Bilani on 23 May 2023, 21:41 IMG_20230523_213646_MP.jpgIMG_20230523_213659_MP.jpgIMG_20230523_213359_MP.jpgIMG_20230523_213440_MP.jpgIMG_20230523_213449_MP.jpg

SQS: The chiller at SQS is running very hot, currently at 21:35 is by 36.3°C. A ventilator is nonstop trying to "cool down". No one from SQS now present (see pics 1 and 2)

SCS: L.Adriano wants to bring a  Werkzeugschrank and a Rollwagen (inkl. the box with liquid gases and accessories/supplies) into the shaft building. Transport on Tuesday at around 13:00. He also mentioned that he has 1-2 cabinets, to give us, but needs to check first where they are

            (see pic 3)

MID: They will dismount the clean tent located near their hutch (close to the yellow beam pipes). Sascha will support with craning on 24.05.2023 at ca. 13:00. Also they will remove/dispose non usable things from the hall. (see pics 4 and 5)

ITDM: The waste of the IBM computers u.ä. was disposed.

Consumables: The grey box is completely finished, :-) . Sascha please name them (I placed already the yellow sticky note to the drawer nr.4). Sorting out is almost at the end.

 

Entry   Shift report, posted by Orkidia Bilani on 06 Jun 2023, 20:52 IMG_20230606_155020_MP.jpgIMG_20230606_201948_MP.jpgIMG_20230606_201955_MP.jpg

SPB/SFX:  gave to XHCrew (more or less sorted out) various screws and Gewindestifte (pic. 1). Sorted them out in boxes and placed in the cabinet (pic.2, pic.3).

SQS:        I gave back the Rollwagen (placed it by the door near the control hutch).

SCS:        Needs our support by next week. The plan "when will happen what and who is needed when" will be sent soon by Jan Torben.

TS:          The elevator near the LKW Schleuse seemed to have some real troubles. A Redmine Ticket already sent to TS bzw. Süleyman.

 

 

 

Entry   Vorgeschichte des Aufuzgs: Hatte doch Störung, posted by Orkidia Bilani on 09 Jun 2023, 14:43 Elevator_Redmine_7-8Juni2023.png

The S. Arslan answer of the Redmine Ticket  concerning the elevator (see pic below). And today the elevator was again out of order, see the previous entry frpm S. Menzel.

 

Entry   Elevator in TH2, posted by Orkidia Bilani on 09 Jun 2023, 18:52 

The elevator in TH2 is again <Out of Order>.  The door doesn't close and it got stuck in U3.

S.Arslan (in cc.L.Kersting) were informed via email.

Still called S.Arslan to notify the staff via email, as well as to talk to the "Lutzaufzüge" technicians. Süleyman called back, a technician from "Lutz" will possibly come (until now not yet here).

 

 

Entry   XHCrew Storage, posted by Orkidia Bilani on 09 Jun 2023, 19:02 IMG_20230609_154557_MP.jpg

In the consumables' storage found this box with various M3 screws.

No idea from whom, anyway a "thank you" for the anonymous donator :-)

Entry   Weiss Klimatechnik: SASE 1, posted by Orkidia Bilani on 09 Jun 2023, 19:04 IMG_20230609_180232_MP.jpgIMG_20230609_180343_MP.jpgIMG_20230609_180614_MP.jpg

@SASE1  an mehreren Weiss Klimatechnik : die Verkleidung der Rohre löst sich (siehe Bilder)

Redmine Ticket sent to D. Tscherwitschka and A. Kondraschew

Entry   Elevator TH2, posted by Orkidia Bilani on 09 Jun 2023, 19:27 

The elevator is functional again.

Talked to the technician from "Lutzaufzüge" and he said that he fixed the bug caused by "short waiting times" during transportations. He set a longer time now.

Entry   Transport from XHE1 to external storage in Ütersen, posted by Orkidia Bilani on 20 Jul 2023, 09:47 

All the parts/components of the instruments, which had to be stored in the external storage in Ütersen, have been transported and labeled there.

Coworkers: O.Bilani, L.Kersting, M. Pooch, H. Heuer.

Entry   Info, posted by Orkidia Bilani on 09 Sep 2023, 13:08 

- Supported HED with N2 and He dewars.

- Very quiet in the hall, and after 12:00 almost nobody around, machine is down.

 

Entry   400 Eintrag: Pfand und Kuchen, posted by Orkidia Bilani on 19 Sep 2023, 13:00 
 
Entry   SQS: Transport to XHE1, posted by Orkidia Bilani on 21 Sep 2023, 08:40 QR51494_51495.jpg

Transport of two granite blocks (QR 51494 and QR 514945) of SQS from XHEXP1 to XHE1.

 

Coworkers: S. Menzel, M. Peter, O. Bilani

Entry   SQS: Transport to XHEXP1, posted by Orkidia Bilani on 22 Sep 2023, 10:45 

Brought back from XHE1 to the experiment hall following parts for SQS:

QR48494 Rack
QR48493 Rack
QR47932 Kabel
QR47938 Kabel

Coworkers: S. Menzel, O. Bilani