263
|
26 May 2017, 18:01 |
Gabriele Giovanetti | General | Information | CAS OCD phone numbers for the weekend |
- Friday 7 PM - Saturday 8.00 AM : 98060
- Saturday 8.00 AM - Sunday 8.00 AM : 98054
- Sunday 8.00 AM - Monday 8.00 AM : 98055
|
286
|
09 Jun 2017, 21:40 |
Gabriele Giovanetti | XTD2 | Problem | Motor in error |
Called at 21.18 for SASE1_XTD2_IMGSR/MOTOR/Y being in error.
Solved by pressing 'Reset' button in Karabo GUI |
5
|
04 Nov 2016, 08:03 |
Frederike Wittmaack | General | Information | Minutes of last weeks meeting (Oct 28, 2016) |
http://tinyurl.com/jy5rsbx |
6
|
04 Nov 2016, 14:22 |
Frederike Wittmaack | General | Information | Minutes - Meeting November 4, 2016 |
http://tinyurl.com/jbog6tz |
11
|
14 Nov 2016, 14:10 |
Frederike Wittmaack | General | Information | Meeting Minutes 11 Nov 2016 |
http://tinyurl.com/juhjcbf |
12
|
24 Nov 2016, 11:38 |
Frederike Wittmaack | General | Information | Meeting Minutes 17 Nov 2016 |
http://tinyurl.com/hxaxdm9 |
14
|
02 Dec 2016, 11:46 |
Frederike Wittmaack | General | Information | Meeting Minutes 25 Nov 2016 |
http://tinyurl.com/jydty26
|
15
|
02 Dec 2016, 11:47 |
Frederike Wittmaack | General | Information | Remote access to control network form |
http://tinyurl.com/jskzj2h
|
16
|
07 Dec 2016, 17:09 |
Frederike Wittmaack | General | Information | Meeting Minutes 02 Dec 2016 |
http://tinyurl.com/hzq7ats |
17
|
09 Dec 2016, 15:31 |
Frederike Wittmaack | General | Information | Meeting Minutes 09 Dec 2016 |
http://tinyurl.com/gqykf7z |
18
|
19 Dec 2016, 09:32 |
Frederike Wittmaack | General | Information | Meeting Minutes 16 Dec 2016 |
http://tinyurl.com/zzzy7sd |
19
|
19 Dec 2016, 09:44 |
Frederike Wittmaack | General | Information | XGM Safe State Definition |
as defined by Jan Grünert:
available on Alfresco: XGM-safe-state.docx
and available at N:\4all\intern\User data\wp74\Devices\11-1_XGMD\03 - Components\XGM-safe-state.docx |
20
|
03 Jan 2017, 08:46 |
Frederike Wittmaack | General | Information | Meeting Minutes 23 Dec 2016 |
Please follow the link to view the minutes:
http://tinyurl.com/h3qspzz |
38
|
03 Feb 2017, 14:22 |
Frederike Wittmaack | General | Information | Meeting Minutes 03 Feb 2017 |
http://tinyurl.com/hwu4esq |
43
|
10 Feb 2017, 15:15 |
Frederike Wittmaack | General | Information | Meeting Minutes 10 Feb 2017 |
Follow the link below to view the minutes and relating material on Alfresco.
http://tinyurl.com/zc3nvn9 |
53
|
24 Feb 2017, 15:22 |
Frederike Wittmaack | General | Information | Meeting Minutes 24 Feb 2017 |
http://tinyurl.com/hhu998t |
91
|
31 Mar 2017, 15:03 |
Frederike Wittmaack | General | Information | Meeting Minutes 31 March 2017 |
http://tinyurl.com/lttzrtm |
341
|
24 Jul 2017, 10:07 |
Frederike Wittmaack | General | Information | Status and plans after SASE 1/3 Readiness Meeting |
General (T. Tschentscher/G. Wellenreuther)
- Further tuning of the machine might require some time which was initially dedicated to photon/experiment commissioning.
- Since Harald Sinn will be on vacation: If you need any kind of access please address T. Tschentscher or M. Dommach. TT will organize coordination of groups requiring access to the tunnels vs. requirements of the machine vs. the demand of the instruments for commissioning.
- Lasing with 30 bunches was achieved this week. Consequently the radiation protection measurements have to be undertaken as soon as possible.
FXE (C. Bressler)
- yesterday no beam at all
- attenuators are being tested
- all hardware installed
SPB (R. Bean/A. Mancuso)
- Implementation of loops required for focal characterization — mainly loops 12 and 13. Also loops required for vacuum interlock.
- Still more loops required to be brought up—working with AE down a clear priority list.
- Clear plan for AGIPD to come to SPB/SFX instrument. Requires DAQ and more.
- CAS reacted quickly to undesirable behavior (freezing) in Karabo, which is now largely solved.
Tunnel Installations SASE3 (J. Eidam, L. Samoylova, N. Kujala)
- SASE3: No access – no progress
- SASE2: work as planned is ongoing
- SASE1: There are still issues with the fast valve.
- During this and last week maintenance days, the Newton PICO motors of FXE monochromator were successfully tested in the tunnel together with Nicola. All four motors for crystal roll and pitch can be moved in vacuum. However a slow motion, necessary for fine tuning, seems still not available. Further motor parameters adjustment is needed, which will be done in the lab with test environment.
- To fulfill the technical commissioning and make the FXE mono available for photon commissioning and operation, the firmware for Alio linear stage should be created. The work is on-going. May be available for tests before mid-August, but the schedule and priorities should be clarified.
- Status of HIREX spectrometer in XTD9 tunnel: The HIREX saw FEL beam for the first time yesterday. All motors were commissioned with Karabo software and ready for commissioning with FEL beam. It is in discussion with SPB and FXE to have parasitic beam for commissioning in the coming week.
Laser (Daniel Kane)
- The pump-probe laser group reported that, with the stabilization of the AC system, we are now continuing with production of the laser system. We are still missing the functionality some components of our control system, but we have enough at the moment that it is not an impediment to us building the laser for now, however it is something that needs keeping an eye on.
Detectors (J. Sztuk-Dambietz)
- LPD: K. Wrona reported that they could observe on all channels but they are still working on storing the data. Loss of device settings induced by glitches in Karabo cost a lot of time to overcome.
- AGIPD: ten out of 16 modules have been successfully tested but there is still a lot of work to do; still testing procedures and electronics, etc. before AGIPD is moving in to SPB in August
AE (P. Gessler)
- Focus is on loop 12 this week, continued to get remaining parts for loop 12 running
- The firmware based interlock for FXE was implemented, certain conditions are disabled but otherwise it is running.
- Plans for shut down week of SASE3 in tunnel in August are currently being made
CAS (S. Brockhauser)
- As reported previously, a release candidate for 2.1.13 has been prepared last Friday
- During the last week-end CAS could systematically reproduce the GUI delay problem SPB was reporting
- In the beginning of the week CAS could identify the source of the GUI delay issue (which was in an old code of the GUI client and got triggered only under special circumstances) and fix it.
- Solution was patched into the new 2.1.13 release resulting in a new release candidate which CAS finished testing now.
- Note that the new release will also fix most of the annoying issues (especially the configuration persistence problems) experienced recently during LDP integration to FXE
- As soon as the new release becomes finalized its deployment in the different production systems will be done under CAS coordination after consulting with all relevant WPs involved.
- The newly introduced quick release cycles with the attached deployment process (as shown on the meeting last week) will help provide access to improved releases while guaranteeing that no surprises and irreversible regressions apply.
- On the ScanTool thread opened by Christian: CAS has started to design a ScanTool around the SRD from SPB which is now being crosschecked against requirements coming from others, too, like FXE, before starting its implementation.
- Thomas, Gerd, and Harald suggested to disseminate its design, so others can also give feedback. Hence, we agreed, that Sandor Brockhauser provide this information and organize a meeting next week.
|
349
|
28 Jul 2017, 11:50 |
Frederike Wittmaack | General | Information | Status and plans after SASE 1/3 Readiness Meeting |
General
-
The radiation test in SASE1 could not take place yesterday since the machine was not able to deliver proper light intensity with 30 bunches. Another tentative is happening now.
-
Instrument commissioning during the weekend
-
Monday - Wednesday next week will be machine development time. XTD 9 will be accessible on request. Please contact M. Dommach. XTD 10 is foreseen to be close.
SPB
-
After tests Smaragd motors are not working. Under investigation with AE/CAS
-
Cameras trigger for the sample environment is not working. AE has been made aware of that during the meeting. Ongoing checks.
-
Vacuum interlock for Loop 5 (AGIPD) is being implemented. This has to be done before the detector installation (foreseen beginning of August).
-
Freezing and delays of the GUI are being experienced. CAS ticket has been sent. This has to be addressed as soon as possible in view of the instrument commissioning time during the week end.
Tunnels
-
Fast valve fake triggering has not been solved. After tests the suspect was on the controller side. Controller has been replaced but the issue has not been completely fixed. Investigation ongoing. Valves are ACTIVE regardless.
-
In case of fake triggering of the fast valves, there is now a procedure to open them again remotely. Please check the related entry posted by M. Dommach.
-
XTD10 – progress in the last 2 days have been achieved concerning closing of vacuum gaps and leaks testing
-
XTD6 – Vacuum connections ongoing.
AE
-
FXE Interlock deployed and under tests.
-
Working on Alio Stages integration for Mono in the tunnel. The goal is to have it ready by the end of August.
-
SPB Loop 12 – Smaragd motors and ELMO controllers implementation ongoing
-
SPB Loop 5 is up including the AGIPD related systems. AGIPD interlock will be added once low level tests done
-
SPB Loop 13 - Phase 2 cables for some modules are at different positions compared to eplans. SPB wants to leave it and rather swap module positions and hand in a change request.
-
Cables for interface to Person Interlock laid. Connections to the MPS system to be done next week.
-
SASE3 Tunnel - Work started on PLC projects. There is the need for accurate schematics and a list of priorities in order to plan and prepare the shutdown week.
-
SASE3 Instruments – AE will start the installation of components ion the racks soon (Mid Aug. after network cables are finished in the PLC related racks).
-
General remark - Do not leave cables in tunnels disconnected after having worked!
DET
-
LPD – Trigger problems solved. DAQ tests to continue
-
AGIPD – Detector being tested in Hera south. As soon as the important issues concerning DAQ have been solved in Hera south (time allocated next week for that). The decision to move it to the SPB hutch can be taken. Schedule may be slightly affected, depending of the test results in HERA.
CAS
-
2.1.13 Karabo version has been presented yesterday
-
Scan tool measurement presentation today at the Mock-up control room
Next week NO SASE1/3 Readiness meeting! |
347
|
27 Jul 2017, 15:42 |
Eric Boyd | XHEXP | Information | Restricted areas Durring Radiation Measurements of SASE 1, Friday 28.07 |
No radiation measurements have taken place today (27.07) due to insufficent energy of the machine. We think we can achive the desired energy by tomorrow morning at which time the SRP group will attemtp to commission both the SPB OPT and SPB EXP hutch. The attached presentation shows the new expected time schedule.
A log book entry will be made when area restriction goes into affect and when it is lifted. |
Attachment 1: Restricted_areas_for_measurments.pptx
|