217
|
10 May 2017, 13:03 |
Jan Grünert | XTD2 | Problem | karabo Beckhoff link not reestablished for SASE1 tunnel VAC loop | Could somebody please re-establish the karabo controls of the SASE1 tunnel VAC loop (connection with Beckhoff server) ?
The karabo devices for XGM vacuum XTD2 and XTD9 are still all in UNKNOWN STATE.
We urgently would like to check the XGM vacuum status and restart the pumps before they are vented.
Thanks,
Jan |
216
|
10 May 2017, 12:34 |
NEREA JARDON | General | Information | Vacuum Loop | Vacuum is up and running again.
Thank you |
215
|
10 May 2017, 11:06 |
NEREA JARDON | General | Information | Vacuum Loop | Sorry for disturbing you, but I will have to wait till WP74 group finish a training in order to be able to put the XGM up again . |
214
|
10 May 2017, 10:59 |
NEREA JARDON | General | Information | Vacuum loop | Dear all,
The update of the Vacuum loop will take place in the next few minutes, later on, you would have access again to it.
Thank you. |
213
|
09 May 2017, 17:04 |
NEREA JARDON | General | Information | EPS loop | EPS loop in SASE1 is running again |
212
|
09 May 2017, 16:43 |
NEREA JARDON | General | Information | EPS loop | Dear all,
I will make an update on the EPS loop, it will take only a moment.
Thank you |
211
|
08 May 2017, 15:18 |
Adriano Violante | General | Information | Status after the 9.30 Meeting | Vacuum (M. Dommach):
- Systematic tests of ion pumps in XTD9 almost finished - ongoing
- Interface with MPS has to be tested
- Problem with the fast valve in XTD2 and 9 - it is possible to close it remotely but not possible to open it again. Checking of the cabling is ongoing by Vacuum group
- After restart of the vacuum loop many pumps in XTD 9 and 2 show an unknown error and some of them are not readble - CAS working on that.
PLC (P. Gessler, T. Freyermuth):
- Implementation of shutters in Karabo ongoing -XS3 shutter in the VAC loop now. XTD9 to do.
Karabo (A. Silenzi):
- GUI stability improved with a temporary solution. This should be enough to guarantee the proper functioning of images acquisition.
- Update of devices list ongoing
- Library for motors (base device), elmo and technosoft, being worked out.
Plans for today:
- XGM work on gas injection
- Bring back Karabo and clear XGM error codes
- Perform systematic test of DPS in XTD9
Other topics:
- No 09:30 meeting tomorrow - next meeting will be on Wednesday
|
210
|
06 May 2017, 14:50 |
Jan Grünert | General | Information | WP74 OCD contacts for this weekend | WP74 OCD for the weekend 6.5.-7.5.2017:
Saturday: Jan, jan.gruenert@xfel.eu, 9-5777
Sunday: Theo, theophilos.maltezopoulos@xfel.eu, 9-6792
|
209
|
05 May 2017, 14:35 |
Nicola Coppola | General | Information | AE OCD Mai 5 -- Mai 8 | AE on call service:
Contact person:
Nicola Coppola
Phone:
9 - 5627
|
208
|
05 May 2017, 09:44 |
Tobias Freyermuth | General | Information | VAC loop up and running again | The vacuum loop is up and running again, with the version 1.11.4.
Denis Finze will connect the shutter signals of the XS3 shutter to the vacuum loop in rack 1.7.
|
207
|
04 May 2017, 19:40 |
Jan Grünert | General | Problem | Slow loading in karabo GUI | The current slow response times in the karabo GUI are the following (some measured times for reference):
- opening a project from the project manager : 45sec (just loading, not yet touching any device or scene)
- opening a scene and receiving the status for all devices e.g. XGM@XTD2 : between 90 and 120 sec
- beyond that, it's never clear if the displayed gauge values are true/actual and must be separately read.
- reading explicitly a gauge value (with command READ in configurator) gives currently an updated value after about 10 sec (should be almost immediate when requested)
-----> working with this (getting actual work done) is practically almost impossible
- this is using the "new" gui server "sa1-br-sys-con-gui2"
- this is after 19h30 (shouldn't less traffic help the performance ?)
|
206
|
04 May 2017, 12:14 |
Sandor Brockhauser | General | Information | CAS support during the afternoon: 9-6776 | Dear All,
During the afternoon CAS has a group activity. Any support can be requested via my phone number: 9-6776.
See you,
Sandor |
205
|
04 May 2017, 11:36 |
Tobias Haas | General | Information | Info from H. Sinn | Hallo allerseits
der Beschleuniger wird heute um 13:00 Uhr abgeschaltet und erst wieder Montag
angeschaltet. Ich hab Winni überredet, dass wir den XTD10 brechen können, damit ihr
heute und morgen im XTD10 Zugang habt.
Allerdings solltet ihr nicht die Magnettür zum XSDU2 öffnen, weil dann auch der komplette XTD4
aus dem Interlock fällt.
Ich hab mit Michael Bieler verabredet, dass wir in der zweiten Maihälfte Absuchtraining für XFEL Leute
machen können (bis ca. 10 Leute auf einmal wäre sinnvoll), damit wir in Zukunft dann XTD10 und XTD9 selber
absuchen könnnen (Termin kommt noch).
Grüße
Harald
|
204
|
03 May 2017, 14:38 |
Raúl Villanueva-Guerrero | XTD9 | Feedback | Gas Section Interlock on XTD9 - Shut off valve also operative | Dear all,
during the test run today by our colleagues of WP74, the interlock condition inside the XGM module was met (small volume pressure burst up to 10-2 mbar range). Now we can see also the expected cut-off event of the gas injection (see attached pictured). It seems that the reason why there was any feedback from the respective shut-off valve was the solenoid actuator on the respective shut-off valve was set in manual mode.
This means that XTD9 Interlock for the whole gas section has been up and running as expected the whole time.
Best Regards. |
Attachment 1: 45.png
|
|
203
|
03 May 2017, 13:38 |
Tobias Haas | General | Information | Accelerator Schedule for the next days | Author: Decking
Run Coordinators: W. Decking (93430), D. Sanzone
Tunnels XTIN, XTL, XTD2-4, XTD10 closed
Temporary access to XTL,XTD2-4, XTD10 possible on Wed, 4.5.
Next open access XTIN, XTL, XTD2-4, XTD10 on Wed, 10.05. 08-16
|01/05 Mo M | Beam operation to T4D 11 GeV, 1 bunches, 0.5 nC, 1 Hz
|01/05 Mo A | Beam operation to T4D 11 GeV, 1 bunches, 0.5 nC, 1 Hz
|01/05 Mo N | Beam operation to T4D 11 GeV, 1 bunches, 0.5 nC, 1 Hz
|02/05 Tu M | Beam operation to T4D 11 GeV, 1 bunches, 0.5 nC, 1 Hz; establish 6, 8 GeV File
|02/05 Tu A | Beam operation to T4D 6 GeV, 1 bunches, 0.5 nC, 1 Hz
|02/05 Tu N | Beam operation to T4D 6.4 GeV, 1 bunches, 0.5 nC, 1 Hz
|03/05 We M | Beam operation to T4D 6.4 GeV, 1 bunches, 0.5 nC, 1 Hz; study beam optics
|03/05 We A | Beam operation to T4D 6.4 GeV, 1 bunches, 0.5 nC, 1 Hz
|03/05 We N | Beam operation to T4D 6.4 GeV, 1 bunches, 0.5 nC, 1 Hz
|04/05 Th M | Beam operation to T4D 6.4 GeV, 1 bunches, 0.5 nC, 1 Hz
|04/05 Th A | No beam operation, tunnels closed
|04/05 Th N | No beam operation, tunnels closed
|05/05 Fr M | No beam operation, Acces to TLD for leak search, Temporary access to T2-T4 possible
|05/05 Fr A | No beam operation, Acces to TLD for leak search, Temporary access to T2-T4 possible
|05/05 Fr N | No beam operation, tunnels closed
|06/05 Sa M | No beam operation, tunnels closed
|06/05 Sa A | No beam operation, tunnels closed
|06/05 Sa N | No beam operation, tunnels closed
|07/05 Su M | No beam operation, tunnels closed
|07/05 Su A | No beam operation, tunnels closed
|07/05 Su N | No beam operation, tunnels closed
|08/05 Mo M | Beam operation to T4D 11 GeV, 1 bunches, 0.5 nC, 10 Hz
|08/05 Mo A | Beam operation to T4D 11 GeV, 1 bunches, 0.5 nC, 10 Hz
|08/05 Mo N | Beam operation to T4D 11 GeV, 1 bunches, 0.5 nC, 10 Hz |
202
|
03 May 2017, 13:29 |
Tobias Haas | General | Information | *IMPORTANT* Change of plans re Access tomorrow |
Due the recent results from XFEL, the urgent maintenance is shiftet from Thursday 4th to Friday 5th. On Thursday, there will be operation till 14:00, after 14:00 the machine will be switched to standby. All the work planned will shift accordingly by one day. No ZZ before Thursday 14:00. The machine will be shut down Friday moring 7:00. Interlock situation: The machine will stay in interlock, only the access to XTL from OSDORF will be brocken. XTL: Access from Osdorf - activation measurement XS1 XTL/rear part by D3 - Leak search and repair in the TLD beamline by MVS - A20 work by MHF-p (Exchange of filament heating, work on phase shifter) - CS8 RF measurement on load (MHF-p) - Repair of wire scanner relais XTL: Access from Bahrenfeld - Exchange of filter in the BCM monitors by MKS - Repair of DCCT of a B2D quad - Change of AMC board in A8 by MSK XTD2: - ZZ for repair of a BPM system XTD10: ZZ for Photon Beamline Work All further work has to be agreed by the run or machine coordination. |
201
|
03 May 2017, 12:32 |
Alessandro Silenzi | General | Information | GUI Server redeployment | The GUI server has been redeployed and a second one has been added.
In order to access those:
please log out of the gateway and log in again using the usual command
ssh desyusername@exflgateway -L 44444:sa1-br-sys-con-gui1:44444
or
ssh desyusername@exflgateway -L 44444:sa1-br-sys-con-gui2:44444
|
200
|
03 May 2017, 11:15 |
Raúl Villanueva-Guerrero | XTD9 | Information | Correction to plans for Vacuum (e-log message n3. 199) in XTD9 | Dear all,
it seems that this morning was somehow a misunderstanding. The XTD9 Gas Section Interlock test was succesfully finished the last 26th of April (see e-log message nr. 179).
There´s no further activity planned for this system.
Regards.
r. |
199
|
03 May 2017, 11:04 |
Tobias Haas | General | Information | Status after 0930 meeting | Tunnel Status: XTD2/4/10 closed. XTD9 open. Controlled Access to 2/4/10 possible upon request
Vacuum (M. Dommach):
- Systematic tests of ion pumps in XTD9 concluded
- Tests of DPS in XTD9 should happen today with R. Villanueva
- Systematic tests of all interlock conditions in XTD9 should happen tomorrow
PBLMs (H. Sinn, P. Gessler):
- Debugging session for the ELMO controller was successful. The problem was traced to details in the parameter settings
- Proper setting of parameters is tricky and requires care and expert knowledge.
- Proper parameters now need to be programmed into the firmware. Manual setting is also possible but not favored.
- AE will set this up and deploy next week in order to maximise optimal use of resources (This week only one expert, TF, is here)
Imagers (A. Koch):
- Imagers in XTD2 and XTD9 are ready for beam
- It is important that images can be stored. This is not yet the case and will be required latest when PBS commissioning starts
- AK will be away from tomorrow until next Thursday
XGM (J. Grünert):
- Late yesterday, Karabo went into error triggering the interlock on the Vatterfly valves on both XGMs. Pressure is still low but slowly rising
- If the condition cannot be resolved remotely a local intervention is necessary. This can possibly wait until the scheduled interrupt tomorrow
- Today tests should occur with the DESY experts for gas injection
- Tests are currently hindered by the Karabo problem. AS suspects that this may have to do with the redeployment of Karabo yesterday. He is now working with high pressure on solving the problem
FXE (A. Galler):
- Currently commissioning loop 1. There is still a problem reading out encoders. It appears that this is a firmware issue. TF is working on this.
SPB (B Weinhausen):
- Fixes were deployed in the firmware for the Reinshaw encoder problem (16/32 bit issue). Still one encoder is in error. TF points out that this is a different problem. He will investigate
PLC (P. Gessler, T. Freyermuth):
- CRL in XTD2 was integrated into the PLC motion loop yesterday during the access.
- Meeting today with DESY experts to finalise the EPS logic
- Focus this week on SPB and AGIPD
Karabo (A. Silenzi):
- Karabo (Components Beckhoff-Device and Beckhoff-Com) were re-deployed yesterday.
- This maybe the origin of the problems observed in the evening
Plans for today:
- XGM work on gas injection
- Bring back Karabo and clear XGM error codes
- Perform systematic test of DPS in XTD9
Other topics:
- No 09:30 meeting tomorrow due to access.
- Request should be made to break the interlock in XTD10 on maintenance days in order to allow continuation of installation work
|
198
|
02 May 2017, 22:27 |
Jan Grünert | XTD2 | Problem | XTD9 vacuum now ok, but not in XTD2: turbos on XGM@XTD2 still in ERROR | Wajid and Leonce from CAS have managed to get us the karabo controls back.
We have now put the XGM@XTD9 back into normal vacuum operation, and opened finally the vatterfly valves, this one is ok, and we checked also the entire XTD9 gas section to be ok.
However, in XGM@XTD2, both XGM turbo pumps are still in ERROR and we cannot get them out - it is an error on the PLC level ? It's something we have not seen before.
The vacuum is at a controlled level of 5E-7mbar thanks to interlock-closed vatterflys.
Request to AE: tomorrow morning, we must remotely get the two turbos out of error (PLC client ?), otherwise we have to request a ZZ access to the tunnel XTD2 for local intervention on the turbo pump controllers.
Request to the AE+CAS group leaders: apparently we need to organize OCD also during nights on weekdays.
|
|