  157   30 Aug 2024, 13:02 Antje TrappXROM1 Rz damaged - DO NOT MOVE!!!What has happened:
During euler motion calibration of
M1, we were driving the vertical motors by
 6x 
  108   19 May 2024, 14:49 Antje TrappXROM1 - M2 - M3 euler fine tuning geometriy parametersWe fine tuned geometry parameters for linear
effects on X motion (parallel offset) for
all three mirrors.
 Screenshot_from_2024-05-19_15-18-51.png 
  1   28 Jan 2024, 13:50 Jan GruenertPRCIssueRC / BKR informs : Beam is down
(since 12h10), all beamlines affected

The reason is failure of a quadrupole
  
  7   01 Feb 2024, 21:56 Romain LetrunSPBIssueAt 21:29:20 today, the number of bunches
in SASE1 was increased from 1 to 352 without
intervention of the SPB/SFX shift crew. 30
 Screenshot_from_2024-02-01_21-52-15.pngScreenshot_from_2024-02-01_21-31-53.png 
  24   13 Feb 2024, 08:52 Romain LetrunSPBIssueLike after the previous winter maintenance
period, the shutter of FXE appears as opened
in DOOCS panels even though it is closed
 Screenshot_from_2024-02-13_08-51-02.png 
  27   17 Feb 2024, 08:15 Tommaso MazzaSQSIssueThe cross on the FEL imager, which we use
as a reference for BKR crew, is not centred
on the GATT aperture. when was this changed,
 Screenshot_from_2024-02-17_08-12-43.pngScreenshot_from_2024-02-17_08-17-03.pngScreenshot_from_2024-02-03_16-06-39.png 
  37   27 Feb 2024, 09:56 Romain LetrunSPBIssueThe status of the XTD2 attenuators has
been checked during the experiment last week
and many were found to cause disturbances
 8x 
  38   28 Feb 2024, 06:57 Peter ZaldenFXEIssueNot sure if this is the cause of the fringes
reported before, but at 5.6 keV there are
clear cracks visible on the XTD2 Attenuators
 2024-02-28-064435_203161010_exflqr51474.png2024-02-28-064443_551842636_exflqr51474.png2024-02-28-064454_671377179_exflqr51474.png2024-02-28-085524_727294913_exflqr51474.png 
  46   04 Mar 2024, 09:42 Romain LetrunSPBIssueThe number of bunches during the last night
shift kept being changed down to 24 by the
device SA1_XTD2_WATCHDOG/MDL/ATT1_MONITOR020
 xtd2_att_watchdog.png 
  50   15 Mar 2024, 00:07 Harald SinnPRCIssueSASE1 bunch number was reduced to 10 pulses
for no obvious reason. 

Traced it back to a malfunctioning
 watchdog_error.jpgcracks_in_SA.jpg 
  52   15 Mar 2024, 07:08 Romain LetrunSPBIssueThere are now two watchdogs for the XTD2
attenuator running at the same time


SA1_XTD2_WATCHDOG/MDL/ATT1_MONITOR020
SA1_XTD2_OPTICS_PROTECTION/MDL/ATT1


that
 Screenshot_from_2024-03-15_07-07-40.png 
  55   16 Mar 2024, 12:12 Harald SinnPRCIssue11:15 SASE1/SPB called that they observed
and issue with the SASE1 XGM/XTD2: about
every 35 seconds the power reading jumps
  
  56   20 Mar 2024, 12:41 Frederik Wolff-FabrisPRCIssueBKR called PRC around 06:10AM to inform
on vacuum issues at SA1 beamline leading
to a lost beam permission for the North Branch.
  
  65   28 Mar 2024, 14:56 Chan KimSPBIssuePulse energy fluctuation observed after
full train operation in SA2 starts.
 Screenshot-from-2024-03-28-14-26-18_1.png 
  67   30 Mar 2024, 06:59 Romain LetrunSPBIssueDOOCS panels are again incorrectly reporting
the FXE shutter as opened when it is in fact
closed. This had been fixed after it was
 Screenshot_from_2024-03-30_06-58-42.png 
  69   30 Mar 2024, 22:02 Chan KimSPBIssueContinuous pointing drift in horizontal
direction.

It may trigger a vacuum spike at
 Screenshot_from_2024-03-30_21-59-03.pngScreenshot_from_2024-03-30_21-09-11.png 
  91   01 May 2024, 16:39 Andreas GallerPRCIssue840 pulses not possible at SXP due to big
brother settings for the EPS Power Limit
rule. The minimum pulse energy was assumed
 Screenshot_2024-05-01_at_16.33.13.png 
  96   08 May 2024, 13:51 Raśl Villanueva-GuerreroPRCIssueDear all,

Due to a probable issue at the
SA1 Transmissive imager, the "OUT"
 image_2024-05-08_135756593.pngimage_2024-05-08_140027070.pngimage_2024-05-08_140101131.pngimage_2024-05-08_140228955.png 
  99   10 May 2024, 00:04 Rebecca BollSQSIssueour pp laser experienced timing jumps by
18 ns today. this happened for the first
time at ~7:30 in the morning without us noticing
  
  105   14 May 2024, 09:56 Andreas KochXPDIssueEPS issue for Transmissive imager
SA1 (OTRC.2615.T9) w.r.t Operation eLog #96

The motor screen positions w.r.t.
  