ID |
Date |
Author |
Group |
Subject |
Text |
|
17
|
09 Feb 2024, 07:15 |
Giuseppe Mercurio | SCS | Shift summary |
night
shift summary
achievements: |
|
20
|
11 Feb 2024, 06:28 |
Giuseppe Mercurio | SCS | Shift summary | Night
shift summary
Andreas, Giuseppe |
|
23
|
13 Feb 2024, 06:38 |
Giuseppe Mercurio | SCS | Shift summary | shift
summary
Andreas, Giuseppe |
|
57
|
20 Mar 2024, 23:03 |
Giuseppe Mercurio | SCS | Shift summary |
Late
shift summary
coarse timing
installed
laser shutter on the laser breadboard and |
|
118
|
07 Jun 2024, 15:19 |
Giuseppe Mercurio | SCS | Shift summary |
Morning
Shift Summary for 07.06.2024 (Teguh, Natalia)
Achievements:
Aligned the beamline to |
|
122
|
09 Jun 2024, 22:21 |
Giuseppe Mercurio | SCS | Shift summary | Late Shift summary
Achievements:
- recovered the beam overlap |
|
133
|
24 Jul 2024, 15:22 |
Giuseppe Mercurio | SCS | Shift summary |
Shift
summary (Natalia, Giuseppe)
Achievements:
M1, M2 pitches adjusted
Grating |
|
137
|
29 Jul 2024, 06:45 |
Giuseppe Mercurio | SCS | Shift summary | ## Shift summary night July 28th-29th
Achievements:
- we saw signal on both MCPs (with |
|
4
|
31 Jan 2024, 11:24 |
Frederik Wolff-Fabris | PRC | SA1 status | A ZZ is taking place today, 31.01 at
11:30, in XTD9 to verify and fix the M3 Pop-in
screen which is currently blocking the |
|
56
|
20 Mar 2024, 12:41 |
Frederik Wolff-Fabris | PRC | Issue | BKR called PRC around 06:10AM to inform
on vacuum issues at SA1 beamline leading
to a lost beam permission for the North Branch. |
|
89
|
25 Apr 2024, 21:11 |
Frederik Wolff-Fabris | PRC | Status | V0 valve for SA2 closed as the pump P22090I
at HED branch enters in wrong state. This
closed nearby vacuum valves for HED branch and |
|
198
|
04 Nov 2024, 15:07 |
Frederik Wolff-Fabris | XO | SA2 status | Dear MID colleagues, Svitozar (PRC), Bolko
and Shan (RCs),
This morning we faced the situation |
|
199
|
12 Nov 2024, 10:07 |
Frederik Wolff-Fabris | PRC | Issue |
- While FEL IMG with YAG screen was
inserted in SA1, EPS/MPS was not limited
to the expected 2 bunches, but to 30 |
|
200
|
15 Nov 2024, 10:50 |
Frederik Wolff-Fabris | PRC | Issue | SA2 cell#5 undulator segment moved at ~09:45AM
Fri to 25mm without aparent reason and
undulator experts need a ZZ to exchange power |
|
107
|
17 May 2024, 10:42 |
Dirk Raiser | SQS | Status | Laser status:
After the laser issues listed in https://in.xfel.eu/elog/OPERATION-2024/99 the |
|
5
|
31 Jan 2024, 23:26 |
Chan Kim | SPB | Shift summary | 31.01.2024 (Day shift)
X-ray delivery
10 keV
1200 |
|
49
|
13 Mar 2024, 23:41 |
Chan Kim | SPB | Shift summary | X-ray delivery
6 keV, 2.6 mJ/pulse, stable
delivery
Optical |
|
51
|
15 Mar 2024, 00:16 |
Chan Kim | SPB | Shift summary | X-ray delivery
6 keV, 2.4 mJ/pulse, stable delivery
Optical laser delivery |
|
54
|
15 Mar 2024, 23:43 |
Chan Kim | SPB | Shift summary | **X-ray delivery**
- 6 keV, 3.2 mJ/pulse, stable delivery
**Optical laser delivery** |
|
64
|
28 Mar 2024, 14:54 |
Chan Kim | SPB | Shift summary | X-ray delivery
12.72 keV, 10 Hz, NOT stable
delivery, pointing drastically changed in |
|
|