  83   18 Apr 2024, 19:31 Jan GruenertPRCStatusThe intra-bunchtrain feedback (IBFB) was
not active until today afternoon.
Although not strictly required or
  
  85   20 Apr 2024, 23:58 Jan GruenertPRCSA2 status20.4.2024 / 22h51:
DOC informed PRC that the SASE2 topic
broker had to be restarted.
  
  89   25 Apr 2024, 21:11 Frederik Wolff-FabrisPRCStatusV0 valve for SA2 closed as the pump P22090I
at HED branch enters in wrong state. This
closed nearby vacuum valves for HED branch and
 Screenshot_2024-04-25_211325.png 
  91   01 May 2024, 16:39 Andreas GallerPRCIssue840 pulses not possible at SXP due to big
brother settings for the EPS Power Limit
rule. The minimum pulse energy was assumed
 Screenshot_2024-05-01_at_16.33.13.png 
  96   08 May 2024, 13:51 Raśl Villanueva-GuerreroPRCIssueDear all,

Due to a probable issue at the
SA1 Transmissive imager, the "OUT"
 image_2024-05-08_135756593.pngimage_2024-05-08_140027070.pngimage_2024-05-08_140101131.pngimage_2024-05-08_140228955.png 
  131   24 Jul 2024, 10:26 Harald SinnPRCIssueIn SASE2 undualtor cell 10 has issues.
Suren K. will do a ZZ at 11:30 to fix it
(if possible). Estimated duration: 1-3 hours. 
  
  132   24 Jul 2024, 11:35 Harald SinnPRCIssueThe control rack of the soft mono at SASE3
has some failure. Leandro from EEE will enter
the XTD10 at 12:00. 
  
  134   27 Jul 2024, 09:10 Harald SinnPRCIssueSASE1: Solid attenuator att5 is in error.
When it is tried to move it out, the arm
lifts, but does not reach the final position
  
  143   11 Aug 2024, 00:13 Andreas GallerPRCAttentionEPS Interlock change for Mode30:
the 3 HIREX Interlock conditions had
been disabled
 Screenshot_2024-08-11_at_00.12.04.png 
  173   25 Sep 2024, 09:47 Jan GruenertPRCIssueIssue with SA3 Gas attenuator (SA3_XTD10_GATT)

9h06:
SQS informs PRC that the Argon line in GATT
is not reacting on pressure change commands,
 JG_2024-09-29_um_12.06.37.png 
  180   27 Sep 2024, 15:17 Jan GruenertPRCStatusBunch pattern SA1 / SA3

SQS
requests to change the bunch pattern.
Currently SA1/SA3 run interleaved
  
  185   29 Sep 2024, 11:42 Jan GruenertPRCIssueA2 failure - downtime

The machine
/ RC informs (11h22) that there is an issue
with the accelerator module A2 (first module
  
  186   29 Sep 2024, 12:13 Jan GruenertPRCStatusBeam is back. Current status:

SASE1 (SPB/SFX)


2.72
mJ, 352 bunches/train, 6 keV


SASE2 (MID)


880 uJ,
 JG_2024-09-29_um_12.12.28.png 
  191   07 Oct 2024, 15:15 Naresh KujalaPRCIssue14:40hr

FXE and HED reported the laser
synchronization issue. Informed to Machine
  
  192   07 Oct 2024, 16:34 Naresh KujalaPRCStatusDesy Laser group has fixed the issue about
the laser Synchronization.

https://ttfinfo.desy.de/XFELelog/show.jsp?dir=/2024/41/07.10_M&pos=2024-10-07T14:51:12
  
  199   12 Nov 2024, 10:07 Frederik Wolff-FabrisPRCIssue
- While FEL IMG with YAG screen was
inserted in SA1, EPS/MPS was not limited
to the expected 2 bunches, but to 30
 Screenshot_2024-11-12_100032.png 
  200   15 Nov 2024, 10:50 Frederik Wolff-FabrisPRCIssueSA2 cell#5 undulator segment moved at ~09:45AM
Fri to 25mm without aparent reason and
undulator experts need a ZZ to exchange power
  
  201   23 Nov 2024, 00:36 Jan GruenertPRCIssue20h16: beam down in all beamlines due
to a gun problem
20h50: x-ray beams are back
 JG_2024-11-23_um_00.47.04.png 
  202   23 Nov 2024, 00:48 Jan GruenertPRCIssueBroken Bridges

Around 21h20 the
XPD group notices that several karabo-to-DOOCS
bridges are broken.
  
  204   23 Nov 2024, 10:23 Jan GruenertPRCIssueBroken Radiation Interlock

Beam
was down for all beamlines due to a broken
radiation interlock in the SPB/SFX experimental
 JG_2024-11-23_um_10.22.43.png 