Entry   Shift summary, posted by Juncheng E on 20 Apr 2024, 23:37 
Staff: JK, SB, JE, AS, RW, FK

**X-ray delivery:**
- 21 keV, ~500 uJ
Entry   Status, posted by Jan Gruenert on 18 Apr 2024, 19:31 
The intra-bunchtrain feedback (IBFB) was not active until today afternoon.
Although not strictly required or requested for the current week experiments,
it was decided to turn on this feedback, which should generally be active to
Entry   Shift summary, posted by Peter Zalden on 13 Apr 2024, 23:03 
Measurements to check the impact of bunch compression on FXE mono transmission were successful. We could change the peak current between 4 and 12 kA
and saw changes in bandwidth between 17 and 100 eV (at 14 keV). Results are under evaluation.

SA1 brought to safe state:
Entry   SASE1 MIRROR MOTORS CALIBRATED, posted by Antje Trapp on 11 Apr 2024, 21:54 XRO_optics-setpoints_2024-04-11_22-05-08.png
Dear all,

we calibrated the mirror vertical motors to their geometrically neutral.

Please be aware that saved values for beamline settings may no longer be valid. This mainly applies to the vertical motor positions, but will
Entry   M3 calibration, posted by Kelin Tasca on 10 Apr 2024, 17:03 SA1_M1_calibration.odsM3_at_nominal_2024-04-10_21-16-39.pngM3_calibrated_2024-04-10_21-20-34.png
- M3 TX moved to 0 in steps of 1 mm and beam on FXE Pop-In corrected with M3 RY (+) and M2 RY

- Started calibration with M3 Rz in steps of 0.5 (+) and corrected with M2 RY and RZ to find a position with a minimum of parasitic motion

- Iterations with M3 TY
Entry   start of shift - status, posted by Antje Trapp on 10 Apr 2024, 16:35 Init_2024-04-10_16-34-30.pngstatus_2024-04-10_16-46-01.pngFEL_imag_2024-04-10_16-40-29.pngpblm_2024-04-10_16-52-34.png
Starting shift with mirror motor calibration:

- beam is centered on FEL imager

- pblm in XTD9 is inserted
Entry   start of shift - status, posted by Antje Trapp on 10 Apr 2024, 16:35 Init_2024-04-10_16-34-30.pngstatus_2024-04-10_16-46-01.pngFEL_imag_2024-04-10_16-40-29.pngpblm_2024-04-10_16-52-34.png
Starting shift with mirror motor calibration:

- found solid attenuator 0.5mm silicon inserted

- beam is centered on FEL imager
Entry   Status, posted by Harald Sinn on 10 Apr 2024, 11:55 
Yesterday two motors of the SASE2 seeding mono were damaged. The mono was exchanged in the afternoon and pumped down. Currently, an issue with the vertical
cystal motion is being investigated.  The vacuum improved much faster than expected after this intervention, so the hope is that the tunnel can
be searched soon and electrons could go through SASE2 already this afternoon. Watch for updates in the program for SASE2 in the DESY logbook under
Entry   Shift end, posted by Marcin Sikorski on 08 Apr 2024, 06:37 
In-house/commissioning beam time summary night 5

X-ray delivery:
12.7 keV, up to 128 pulses at 0.5MHz, ~1.3 mJ, one very short beam down.
Entry   Shift summary, posted by Raphael de Wijn on 07 Apr 2024, 07:04 
In-house/commissioning beam time summary night 4

X-ray delivery:
12.7 keV, up to 128 pulses at 0.5MHz, ~1.3 mJ, one very short beam down.
Entry   Shift summary, posted by Raphael de Wijn on 06 Apr 2024, 07:06 
Staff: MS, RB, PS, RdW

In-house/commissioning beam time summary night 3

X-ray delivery:
Entry   Shift summary, posted by Raphael de Wijn on 05 Apr 2024, 07:14 
In-house/commissioning beam time summary night 2

X-ray delivery:
12.7 keV, up to 288 pulses at 1.1MHz, ~1.2 mJ
Entry   Shift summary, posted by Raphael de Wijn on 04 Apr 2024, 06:48 
In-house/commissioning beam time summary night 1

X-ray delivery:
12.7 keV, up to 208 pulses at 1.1MHz, 1.1-1.5 mJ
Entry   Shift end, posted by Adam Round on 31 Mar 2024, 23:20 
X-ray delivery


12.72 keV, 10Hz, ~1.4 mJ/pulse, some beam drift in the horizontal direction observed (probably mirror related)


Optical
laser delivery
Entry   Shift summary, posted by Chan Kim on 30 Mar 2024, 22:50 
X-ray delivery

- 12.72 keV, 10Hz, ~1.4 mJ/pulse, continuous beam drift in the horizontal direction observed

Optical laser delivery
Entry   Issue, posted by Chan Kim on 30 Mar 2024, 22:02 Screenshot_from_2024-03-30_21-59-03.pngScreenshot_from_2024-03-30_21-09-11.png
Continuous pointing drift in horizontal direction.

It may trigger a vacuum spike at SPB OH (MKB_PSLIT section) at 21:07 pm.

 
Entry   Issue, posted by Romain Letrun on 30 Mar 2024, 06:59 Screenshot_from_2024-03-30_06-58-42.png
DOOCS panels are again incorrectly reporting the FXE shutter as opened when it is in fact closed. This had been fixed after it was last reported in February
(elog:24), but reappeared now.
Entry   (Resolved) Issues with DAQ, posted by Björn Senfftleben on 30 Mar 2024, 00:17 
We had some trouble with the DAQ. It was not able to start runs properly.

We got the following error messages:

initially:
Entry   Shift summary, posted by Chan Kim on 29 Mar 2024, 22:38 
X-ray delivery
- 12.72 keV, 10Hz, ~1.4 mJ/pulse, stable delivery 

Optical laser delivery
Entry   Issue, posted by Chan Kim on 28 Mar 2024, 14:56 Screenshot-from-2024-03-28-14-26-18_1.png
Pulse energy fluctuation observed after full train operation in SA2 starts.