|  Issue, posted by Romain Letrun on 13 Feb 2024, 08:52   | 
| Like after the previous winter maintenance period, the shutter of FXE appears as opened in DOOCS panels even though it is closed (https://in.xfel.eu/elog/OPERATION-2023/58). | 
|  Shift summary, posted by Giuseppe Mercurio on 13 Feb 2024, 06:38 | 
| shift summary Andreas, Giuseppe
 
 
 continued pumpprobe measurements
 around 5:30 we could not see any image at the MTE3 camera (after sample transfer), we tried
 | 
|  Shift summary, posted by Tokushi Sato on 13 Feb 2024, 01:02 | 
| X-ray delivery 
 
 1-350 at 12.45 keV, 1600 uJ. Stable delivery
 
 
 Optical laser delivery
 
 
 None
 
 
 Achievements/Observations
 | 
|  Shift summary, posted by Tokushi Sato on 11 Feb 2024, 23:04 | 
| X-ray delivery 1-350 at 12.45 keV, 1700 uJ. Stable delivery
 
 Optical laser delivery
 | 
|  Shift summary, posted by Giuseppe Mercurio on 11 Feb 2024, 06:28 | 
| Night shift summary Andreas, Giuseppe
 
 
 we finished to measure sample 17 and 41 in CARD 06_Y2018F04
 we transferred sample Card_07_Y2018F19
 we started measuring
 | 
|  Shift summary, posted by Tokushi Sato on 10 Feb 2024, 23:32 | 
| X-ray delivery 
 
 1-350 at 12.45 keV, 1750 uJ. Stable delivery
 
 
 Optical laser delivery
 
 
 
 
 
 None
 
 
 
 
 
 Achievements/Observations
 | 
|  Shift summary, posted by Tokushi Sato on 10 Feb 2024, 00:12 | 
| X-ray delivery 
 
 1-350 at 12.45 keV, 1700 uJ. Stable delivery
 
 
 Optical laser delivery
 
 
 None
 
 
 Achievements/Observations
 | 
|  Shift summary, posted by Giuseppe Mercurio on 09 Feb 2024, 07:15 | 
| night shift summary
 
 achievements:
 
 
 characterized FEL beam size to have 20 um x 20 um (Hor x Ver)
 exchanged sample
 closed KB baffle, HSLITS, guardstage
 started
 | 
|  Shift summary, posted by Tokushi Sato on 08 Feb 2024, 23:14 | 
| X-ray delivery 
 
 1-350 at 12.45 keV, 1700 uJ. Stable delivery
 
 
 Optical laser delivery
 
 
 None
 
 
 Achievements/Observations
 | 
|  Shift summary, posted by Giuseppe Mercurio on 08 Feb 2024, 07:00 | 
| Late shift 07.02.24 Laurent, Martin
 
 Continued with laser preparation
 | 
|  Shift summary, posted by Giuseppe Mercurio on 06 Feb 2024, 07:17 | 
| 
 
 
 | 
|  Shift summary, posted by Jörg Hallmann on 05 Feb 2024, 23:10 | 
| check of the optimized focussing options at 10 keV using only one arm in CRL2 - results still to be evaluated successful check of the mirror chamber in the experiment hutch of MID - it was possible to reflect the direct beam down and use it under a shallow
 angle on the sample position
 | 
|  Shift summary, posted by Wonhyuk Jo on 04 Feb 2024, 23:36 | 
| Goal Achieved. - Finished flat field measurement for AGIPD at different scenarios for upcoming user experiments.
 - Aligned the spectrometer at DES and obtained the energy spectrum of 9 keV SASE.
 | 
|  Shift summary, posted by Jörg Hallmann on 03 Feb 2024, 23:51 | 
| goals achieved: alignment of the beam in tunnel and hutches including refinement of the beam in the center of rotation
 check of cameras and optical components
 | 
|  Shift summary, posted by Romain Letrun on 02 Feb 2024, 23:31 | 
| X-ray delivery 
 
 1-64 pulses at 10 keV, ~1.1 mJ.
 Overall stable delivery.
 
 
 Optical laser delivery
 
 
 NA
 
 
 Achievements/Observations
 | 
|  Shift summary, posted by Konopkova Zuzana on 02 Feb 2024, 12:40 | 
| beam parametes: 8.5-9 kev, 1.2 mJ, 1-2 pulses 
 
 HED trajectory established from XRO setpoint, shape and transmission optimized
 monochromator aligned
 5
 sets of CRLs including nano-focus aligned
 ZZ yesterday morning to fix cameras, connect motors..
 DAQ rolled back to legacy version,
 | 
|  Shift summary, posted by Romain Letrun on 02 Feb 2024, 00:04 | 
| X-ray delivery 
 
 1-352 pulses at 10 keV, 1200 - 400 uJ.
 Significant pulse energy slope within the train. Action on the kickers was eventually
 performed leading to some reduction of the slope, though remaining still far from ideal. Decision to take the action took a very long time (2.5 hours).
 Several
 | 
|  Issue, posted by Romain Letrun on 01 Feb 2024, 21:56    | 
| At 21:29:20 today, the number of bunches in SASE1 was increased from 1 to 352 without intervention of the SPB/SFX shift crew. 30 seconds later, the number of bunches was reduced to 1, again without intervention from the SPB/SFX shift crew (see attachments 1 and 2).
 
 We were in the middle of a measurement at that time and the sudden increase from 10 mW to 3.5 W average power resulted in the destruction of
 | 
|  Shift summary, posted by Natalia Gerasimova on 01 Feb 2024, 07:14 | 
| Moning shift summary (31.01 and 01.02) 
 Acievements:
 - SRA recalibrated, cross position on FEL imager found
 | 
|  Shift summary, posted by Chan Kim on 31 Jan 2024, 23:26 | 
| 31.01.2024 (Day shift) 
 X-ray delivery
 
 
 10 keV
 1200 - 400 uJ (significant pulse energy slope within train)
 
 
 Optical laser delivery
 |