  OPERATION-2024 logbook, Contact: F.Wolff-Fabris, A.Galler, H.Sinn, Page 2 of 11  Not logged in ELOG logo
Entry   Shift summary, posted by Tokushi Sato on 22 Feb 2024, 22:52 
X-ray delivery: stable and flat over 190 pulses per train. 1.1 MHz with 200 uJ short intervention needed to improve intensity after it dropped

Optical laser delivery: NA

Achievements/Observations:
Entry   Shift summary, posted by Tokushi Sato on 23 Feb 2024, 23:03 
X-ray delivery:

stable and flat over 190 pulses per train. 1.1 MHz with ~200 uJ

Optical laser delivery:
Entry   Shift summary, posted by Tokushi Sato on 25 Feb 2024, 22:54 
X-ray delivery


9.10 keV; 190 pulses per train @1.1 MHz with roughly 170-200 uJ; stable delivery


Optical laser delivery


ns laser for particles visualization


Achievements/Observations
Entry   Shift summary, posted by Tokushi Sato on 25 Aug 2024, 22:37 
X-ray delivery

-12.40 - 12.82 keV, XDT9 XGM ~0.85 mJ, 3 hours interruption by vacuum issue on XTD9

Optical laser delivery
Entry   Shift summary, posted by Tokushi Sato on 26 Aug 2024, 23:05 
X-ray delivery

-12.40 - 12.82 keV, ~1.3 mJ

Optical laser delivery
Entry   Shift summary, posted by Tokushi Sato on 08 Sep 2024, 06:44 
X-ray delivery

12.8 keV, ~0.8 mJ

Achievements/Observations
Entry   Shift summary, posted by Tokushi Sato on 01 Oct 2024, 02:39 
X-ray delivery

    6 keV, ~2.8 mJ, continuous beam drift in both direction

Optical laser delivery
Entry   Shift summary, posted by Tokushi Sato on 30 Nov 2024, 23:01 
X-ray delivery

19 keV, ~550 uJ, 1 - 128 pulses, stable delivery

Optical laser
Entry   Shift summary, posted by Tokushi Sato on 01 Dec 2024, 23:07 
X-ray delivery

19 keV, ~450 uJ, 1 - 128 pulses, stable delivery

Optical laser
Entry   Stability Issue, posted by Thomas Baumann on 26 May 2024, 21:56 
We asked the machine for two color mode in the morning. Tuning gave good results at first (1.6mJ second color, 100uJ first color), but as soon as any
of the colors was switched off and on again the pulse energy dropped (~600uJ) and BKR had to retune to even get a fraction of the pulse energy back back.
The same happened when changing the delay
Entry   Issue, posted by Romain Letrun on 01 Feb 2024, 21:56 Screenshot_from_2024-02-01_21-52-15.pngScreenshot_from_2024-02-01_21-31-53.png
At 21:29:20 today, the number of bunches in SASE1 was increased from 1 to 352 without intervention of the SPB/SFX shift crew. 30 seconds later, the number
of bunches was reduced to 1, again without intervention from the SPB/SFX shift crew (see attachments 1 and 2).

We were in the middle of a measurement at that time and the sudden increase from 10 mW to 3.5 W average power resulted in the destruction of
Entry   Shift summary, posted by Romain Letrun on 02 Feb 2024, 00:04 
X-ray delivery


1-352 pulses at 10 keV, 1200 - 400 uJ.
Significant pulse energy slope within the train. Action on the kickers was eventually
performed leading to some reduction of the slope, though remaining still far from ideal. Decision to take the action took a very long time (2.5 hours).
Several
Entry   Shift summary, posted by Romain Letrun on 02 Feb 2024, 23:31 
X-ray delivery


1-64 pulses at 10 keV, ~1.1 mJ.
Overall stable delivery.


Optical laser delivery


NA


Achievements/Observations
Entry   Issue, posted by Romain Letrun on 13 Feb 2024, 08:52 Screenshot_from_2024-02-13_08-51-02.png
Like after the previous winter maintenance period, the shutter of FXE appears as opened in DOOCS panels even though it is closed (https://in.xfel.eu/elog/OPERATION-2023/58).
Entry   Shift summary, posted by Romain Letrun on 15 Feb 2024, 09:32 
X-ray delivery


1 to ~332 pulses at 6 keV, 4.5 mJ
Stable delivery
Number of pulses limited by the Photon Beam Power local limit
that is set to 16 W. Is this intentional? All other limits are set to 40 W


Achievements/Observations
Entry   Issue, posted by Romain Letrun on 27 Feb 2024, 09:56 8x
The status of the XTD2 attenuators has been checked during the experiment last week and many were found to cause disturbances in the wavefront ranging
from mild to severe.

Attachment 1: No attenuator
Entry   Shift summary, posted by Romain Letrun on 29 Feb 2024, 10:04 
X-ray delivery


10 keV, up to 160 pulses at 1.1MHz, 1.8 mJ


Optical laser
delivery
Entry   Shift summary, posted by Romain Letrun on 01 Mar 2024, 10:54 
X-ray delivery


10 keV, up to 128 pulses with custom bunch pattern, 1.6-2.0 mJ


Optical laser delivery


NA


Achievements/Observations
Entry   Issue, posted by Romain Letrun on 04 Mar 2024, 09:42 xtd2_att_watchdog.png
The number of bunches during the last night shift kept being changed down to 24 by the device SA1_XTD2_WATCHDOG/MDL/ATT1_MONITOR020 acting on SA1_XTD2_BUNCHPATTERN/MDL/CONFIGURATOR.
This was not the case during the previous shifts, even though the pulse energy was comparable. Looking at the history of SA1_XTD2_WATCHDOG/MDL/ATT1_MONITOR020,
it looks like this device was started at 16:26:25 on Friday, 1st March.
Entry   Status, posted by Romain Letrun on 13 Mar 2024, 10:09 7x
We checked the XTD2 attenuators following the intervention from XRO (compar ewith elog:37, before the intervention).

The wavefront shows similar distortions with the 75 and 150 um as earlier, which is not too surprising since the cracks are vertical.

Attachments 1-5: Beam on SPB_XTD9_SCR with XTD2 attenuator CVDs