Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2024 logbook, Contact: F.Wolff-Fabris, A.Galler, H.Sinn, Page 10 of 10  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry   Shift summary, posted by Giuseppe Mercurio on 11 Feb 2024, 06:28 
Night shift summary
Andreas, Giuseppe


we finished to measure sample 17 and 41 in CARD 06_Y2018F04
we transferred sample Card_07_Y2018F19
we started measuring
Entry   Shift summary, posted by Tokushi Sato on 10 Feb 2024, 23:32 
X-ray delivery


1-350 at 12.45 keV, 1750 uJ. Stable delivery


Optical laser delivery





None





Achievements/Observations
Entry   Shift summary, posted by Tokushi Sato on 10 Feb 2024, 00:12 
X-ray delivery


1-350 at 12.45 keV, 1700 uJ. Stable delivery


Optical laser delivery


None


Achievements/Observations
Entry   Shift summary, posted by Giuseppe Mercurio on 09 Feb 2024, 07:15 

night shift summary

achievements:


characterized FEL beam size to have 20 um x 20 um (Hor x Ver)
exchanged sample
closed KB baffle, HSLITS, guardstage
started
Entry   Shift summary, posted by Tokushi Sato on 08 Feb 2024, 23:14 
X-ray delivery


1-350 at 12.45 keV, 1700 uJ. Stable delivery


Optical laser delivery


None


Achievements/Observations
Entry   Shift summary, posted by Giuseppe Mercurio on 08 Feb 2024, 07:00 
Late shift 07.02.24
Laurent, Martin

Continued with laser preparation
Entry   Shift summary, posted by Giuseppe Mercurio on 06 Feb 2024, 07:17 



Entry   Shift summary, posted by Jörg Hallmann on 05 Feb 2024, 23:10 
check of the optimized focussing options at 10 keV using only one arm in CRL2 - results still to be evaluated
successful check of the mirror chamber in the experiment hutch of MID - it was possible to reflect the direct beam down and use it under a shallow
angle on the sample position
Entry   Shift summary, posted by Wonhyuk Jo on 04 Feb 2024, 23:36 
Goal Achieved.
- Finished flat field measurement for AGIPD at different scenarios for upcoming user experiments. 
- Aligned the spectrometer at DES and obtained the energy spectrum of 9 keV SASE.
Entry   Shift summary, posted by Jörg Hallmann on 03 Feb 2024, 23:51 
goals achieved:
alignment of the beam in tunnel and hutches including refinement of the beam in the center of rotation 
check of cameras and optical components
Entry   Shift summary, posted by Romain Letrun on 02 Feb 2024, 23:31 
X-ray delivery


1-64 pulses at 10 keV, ~1.1 mJ.
Overall stable delivery.


Optical laser delivery


NA


Achievements/Observations
Entry   Shift summary, posted by Konopkova Zuzana on 02 Feb 2024, 12:40 
beam parametes: 8.5-9 kev, 1.2 mJ, 1-2 pulses


HED trajectory established from XRO setpoint, shape and transmission optimized
monochromator aligned
5
sets of CRLs including nano-focus aligned
ZZ yesterday morning to fix cameras, connect motors..
DAQ rolled back to legacy version,
Entry   Shift summary, posted by Romain Letrun on 02 Feb 2024, 00:04 
X-ray delivery


1-352 pulses at 10 keV, 1200 - 400 uJ.
Significant pulse energy slope within the train. Action on the kickers was eventually
performed leading to some reduction of the slope, though remaining still far from ideal. Decision to take the action took a very long time (2.5 hours).
Several
Entry   Issue, posted by Romain Letrun on 01 Feb 2024, 21:56 Screenshot_from_2024-02-01_21-52-15.pngScreenshot_from_2024-02-01_21-31-53.png
At 21:29:20 today, the number of bunches in SASE1 was increased from 1 to 352 without intervention of the SPB/SFX shift crew. 30 seconds later, the number
of bunches was reduced to 1, again without intervention from the SPB/SFX shift crew (see attachments 1 and 2).

We were in the middle of a measurement at that time and the sudden increase from 10 mW to 3.5 W average power resulted in the destruction of
Entry   Shift summary, posted by Natalia Gerasimova on 01 Feb 2024, 07:14 
Moning shift summary (31.01 and 01.02)

Acievements:
- SRA recalibrated, cross position on FEL imager found
Entry   Shift summary, posted by Chan Kim on 31 Jan 2024, 23:26 
31.01.2024 (Day shift)

X-ray delivery


10 keV
1200 - 400 uJ (significant pulse energy slope within train)


Optical laser delivery
Entry   SA1 status, posted by Frederik Wolff-Fabris on 31 Jan 2024, 11:24 
A ZZ is taking place today, 31.01 at 11:30, in XTD9 to verify and fix the M3 Pop-in screen which is currently blocking the beam. It is not
yet clear if this is an electrical or mechnical problem.  

** Update 13:05: ZZ intervention is finished and successful. A mechanical issue due to a loose coupling between motor and spindle was fixed.
Entry   Experiment summary, posted by Naresh Kujala on 28 Jan 2024, 19:55 Screenshot_from_2024-01-28_20-42-59.png
X-ray delivery


0.25nC, 14 GeV, rep rate 2.25 MHz, 9300 eV, 1 to 100 pulses, ~2000 uJ
M1 and M2 mirrors are aligned and beam trajectory to
SPB.


Goal
Entry   Issue, posted by Jan Gruenert on 28 Jan 2024, 13:50 
RC / BKR informs : Beam is down (since 12h10), all beamlines affected

The reason is failure of a quadrupole (power supply) downstream of the dogleg.
The MPS crew is working on recovery, access to XTL ongoing.
Entry   Shift summary, posted by Idoia on 27 Jan 2024, 15:17 
SASE3
Open Issues:
- currently it is not possible to change the number of pulses because of Instruments beam permission interlock
ELOG V3.1.4-7c3fd00