Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2024 logbook, Contact: F.Wolff-Fabris, A.Galler, H.Sinn, Page 11 of 11  Not logged in ELOG logo
ID Date Author Group Subject Text Attachments
  9   02 Feb 2024, 12:40 Konopkova ZuzanaHEDShift summarybeam parametes: 8.5-9 kev, 1.2
mJ, 1-2 pulses


HED trajectory
  
  8   02 Feb 2024, 00:04 Romain LetrunSPBShift summaryX-ray delivery


1-352 pulses at 10 keV,
1200 - 400 uJ.
Significant pulse
  
  7   01 Feb 2024, 21:56 Romain LetrunSPBIssueAt 21:29:20 today, the number of bunches
in SASE1 was increased from 1 to 352 without
intervention of the SPB/SFX shift crew. 30
 Screenshot_from_2024-02-01_21-52-15.pngScreenshot_from_2024-02-01_21-31-53.png 
  6   01 Feb 2024, 07:14 Natalia GerasimovaSCSShift summaryMoning shift summary (31.01 and 01.02)

Acievements:
- SRA recalibrated, cross position
  
  5   31 Jan 2024, 23:26 Chan KimSPBShift summary31.01.2024 (Day shift)

X-ray delivery


10 keV
1200
  
  4   31 Jan 2024, 11:24 Frederik Wolff-FabrisPRCSA1 statusA ZZ is taking place today, 31.01 at
11:30, in XTD9 to verify and fix the M3 Pop-in
screen which is currently blocking the
  
  2   28 Jan 2024, 19:55 Naresh KujalaXPDExperiment summaryX-ray delivery


0.25nC, 14 GeV, rep rate
2.25 MHz, 9300 eV, 1 to 100 pulses, ~2000
 Screenshot_from_2024-01-28_20-42-59.png 
  1   28 Jan 2024, 13:50 Jan GruenertPRCIssueRC / BKR informs : Beam is down
(since 12h10), all beamlines affected

The reason is failure of a quadrupole
  
  3   27 Jan 2024, 15:17 IdoiaXROShift summarySASE3
Open Issues:
- currently it is not possible to
  
ELOG V3.1.4-7c3fd00