91
|
21 Mar 2023, 23:36 |
Jayanath Koliyadu | SPB | Shift end | Staff: JB, PV, TS, RL, RdW, JK, AR
X-ray delivery
- 1-165 pulses, 1.1 MHz, upto 400 uJ @ 50 pC
Optical laser delivery
Achievements/Observations
- NKB focus optimization
- Beam alignment until IBS
- Photodiode alignment
- Alignment of fixed target in the beam
- Tests with fixed target motion in vacuum
- Collected few runs with low transmission at 8 keV and 9 keV
|
94
|
22 Mar 2023, 21:49 |
Adam Round | SPB | Shift end | X-ray delivery
- 9 keV 1 to 165 pulses ~ 300 mj per pulse - stable delivery during the day
Optical laser delivery
- ns lasers for illumination only
Achievements/Observations
- Focus alignment
- found illumination / shield (100 micron) conditions to optimise background on detector
- observed that the flourecence signal on the diode was very low and this appears corelated with drift in the focus - after focus optimisation signal was again visible
- several runs collected with varying attenuation with the aim to try to corelate flourecence signal on diode with beam intensity
Issues
- Too high background from sample at full transmission required exchange of copper shield form 50 to 100 microns
- disc detaching from motor spindle (twice) - first time disc blocked gate valve, second bolt and washer are in the gate valve mechanisme space
- in both cases detector had to be warmed to allow venting.
|
102
|
23 Mar 2023, 23:24 |
Jayanath Koliyadu | SPB | Shift end | X-ray delivery
- 1-165 pulses, 1.1 MHz - 28.2 kHz, upto 400 uJ @ 50 pC
Optical laser delivery
Achievements/Observations
- Optimized sample setup for data collection
- Calibrated photodiode @ 8keV.
- ADC signal was saturated with amplified photodiode signal.
- Removed the amplifier and calibrated photodiode again.
- ASE signal is visible without the amplifier
- Optimized ASE signal by optimizing the focus and target position in focus
- Checking and optiming the focus everytime chaning the sample disk seems to improve the signal
- Collected data at 8 keV and 9 keV for about 1-2 hours
|
105
|
24 Mar 2023, 23:14 |
Jayanath Koliyadu | SPB | Shift end | X-ray delivery
- 1-165 pulses, 1.1 MHz - 28.2 kHz, upto 350 uJ @ 50 pC
Optical laser delivery
Achievements/Observations
- Collected data for 3 to 4 hours with different samples
- Data collection at lower repetiton rate (113 kHz) with less number of pulses
|
107
|
25 Mar 2023, 23:18 |
Jayanath Koliyadu | SPB | Shift end | X-ray delivery
- 1-165 pulses, 1.1 MHz - 56.4 kHz, upto 350 uJ @ 50 pC
Optical laser delivery
Achievements/Observations
- Collected data for 3 to 4 hours with different samples
- Data collection at lower repetiton rate (113 kHz) with less number of pulses
- Data to characterize the divergence of ASE collected
|
110
|
26 Mar 2023, 23:27 |
Jayanath Koliyadu | SPB | Shift end | X-ray delivery
- 1-165 pulses, 1.1 MHz - 56.4 kHz, upto 350 uJ @ 50 pC
Optical laser delivery
Achievements/Observations
- Collected data for about 6 hours with different samples
- Data collection at lower repetiton rates with less number of pulses
- Data to characterize the divergence of ASE collected
- Photodiode calibrated at 8 keV again
|
136
|
13 Apr 2023, 15:57 |
Jan Gruenert | XPD | Shift end | End of Diamond Sensor Study
We leave the SASE2 beamline in the following safe state:
- Pre-Abs inserted
- Solid ATT with T=0.001
- All CRLs OUT
- All imagers OUT
|
260
|
18 Jun 2023, 07:31 |
Adam Round | SPB | Shift end | posting for 17th June
Staff: AR, AS, FK, HH, JB, KK, DZ, MK
X-ray delivery
Optical laser delivery
- 532 nm, ns-laser for sample pumping
Achievements/Observations
- Continued to collect data many hours of data collection
Issues
- coupling with SASE2 limited feedbacks to control slope across train, this led to dificulties in alignment and lost time to correct for poor visualisation of the beam.
- After discussion SASE2 kindly gave permission to BKR to corect the slope to facilitate our alignment
- we also with the help of PRC arranged for the same arrangment for alignment for sunday
|
280
|
29 Jul 2023, 23:46 |
Adam Round | SPB | Shift end | X-ray delivery
- 12.4 keV, up tp 352 pulses but the intensity drop across the train was too dramatic to use. reasonably stable delivery with 202 pulses.
Optical laser delivery
Achievements/Observations
- reestablished direct beam trajectory and verified instrument alignment
- collected flat field calibration for AGIPD-1M for all high priority scenarios and some additional settings (see table copied in SPB commissioning or original AGIPD log)
|
293
|
08 Aug 2023, 22:57 |
Jayanath Koliyadu | SPB | Shift end | X-ray delivery
- 9.3 keV, ~ 2 mJ, stable delivery except for the intensity slope along the train (fixed later on)
Optical laser delivery
Achievements/Observations
- Aligned the instrument for MKB focus configuration
- Optimzed MKB focus and detector background
- PCS - Collected data for about 3-4 hours with different sample concentration and crystal sizes.
Issues
- Issue with intensity slope along the pulse train (fixed later in the day)
- Issue with MKB combined motion (DOC informed)
|
303
|
12 Aug 2023, 22:50 |
Jayanath Koliyadu | SPB | Shift end | X-ray delivery
- 9.3 keV, up to 181 pulses at 564 kHz, 1.8 - 1.9 mJ
Optical laser delivery
- PP Laser, 800nm, 50 fs, up to 181 pulses @ 564 kHz and 91 pulses at 282 kHz, stable delivery
Achievements/Observations
- Installed and aligned fixed target for pump-probe measurement
- Measured t0 with fixed target at IRU, scan tool to measure t0 was also tested
- Optimized Bimuth fixed target sample for diffraction condition
- Recorded pump-probe data (30 min 1 hour)
- Spatial and temporal overlap of X-ray and PP laser at PAM
Issues
- Issue with homing smaract stages used in fixed target. Solved by exchanging the stages for now but need to be checked later.
- Difficulties in observing pump-probe signal in online data analysis although diffraction signal could be seen and optmized on the fluorescent paper on DN500 and AGIPD detector
- Data collected for further offline analysis
|
304
|
13 Aug 2023, 21:33 |
Jayanath Koliyadu | SPB | Shift end | X-ray delivery
- 9.3 keV, up to 181 pulses at 564 kHz, 8 - 1.3 mJ
- Issue with pulse energy stability along the pulse train in the morning but optimzed later on in the day
Optical laser delivery
- PP Laser, 800nm, 50 fs, up to 181 pulses @ from 10 Hz to564 kHz
Achievements/Observations
- Optimized Bismuth diffraciton condition on AGIPD
- Collected pump-probe data with Bismuth fixed target
- Aligned PAM and measured arrival time with electron bunch arrival time slope enabled
- Positive slope and V shape slope measured
Issues
- Issues with beam stability and intenisty.
- Optimized later on in the day
- But did not recover what we had yesterday in terms of pulse energy
|
348
|
20 Sep 2023, 02:09 |
Jayanath Koliyadu | SPB | Shift end | X-ray delivery
- 7 keV, 2.1 mJ, stable delivery
Optical laser delivery
Achievements/Observations
- M1, M2 pre alignment for this weeks beamtime
- Checked the beam trajectory through MKB mirrors after stripe change
Issues
- It seems that with wider funnel for the catcher, the YAG is not reaching the X-ray beam
Note: At 7 keV with 100 pulses, and full beam we were at 2.2 W average power. |
355
|
23 Sep 2023, 07:04 |
Adam Round | SPB | Shift end | Staff:JK, RDW, AR
X-ray delivery
- 7 keV 202 pulses 1.7mJ stabel across train and throughout the shift
Optical laser delivery
Achievements/Observations
- faster changover and alignment
- almost 6 hours of data aquisition - many good hits observed
- strong diffraction in Hits required transmission to be reduced to 34%
Issues
- maintaining synchronnisation for droplet overlap proved difficult effective hit rate of 0.3% observed
- hits observed in beats as timing passed though overlap quite often - some periods where we could see hits in nearly every train but this could not be maintained.
|
383
|
03 Oct 2023, 22:58 |
Harald Sinn | XRO | Shift end | End of Euler shift: all 3 SASE2 mirrors are now working with the Euler MDL.
We left the beamline aligned to HED, with M1,M2 on Pt for upcoming HED experiment at 18 keV.
Pre-absorber closed, CRL1 out, Solid attenuater with some diamonds. |
395
|
19 Oct 2023, 23:30 |
Jayanath Koliyadu | SPB | Shift end | X-ray delivery
- 13.6 keV, ~1.7 mJ and up to 352 pulses at 1.1 MHz
Optical laser delivery
- PP laser, 1 to 202 pulses, stable delivery except for the down time of ~1h
Achievements/Observations
- user sample data collected for ~1.5h
- PP laser timing scans done
- new adapter for the screens holder designed, machined and installed
Issues
- sample was growing on the adapter, preventing data collection
- new adapter is too far downstream, partially shadowing sample diffraction on the lower corners of the detector
- PP laser down for ~1h
|
446
|
15 Nov 2023, 07:10 |
Jayanath Koliyadu | SPB | Shift end | X-ray delivery
- 1.3-1.7 mJ, 1-30 pulses, stable delivery
Optical laser delivery
Achievements/Observations
- Aligned beam trajectory for 10.7 keV direct beam
- Optimized the microscopy table position and references
- Initial alignment and test of test of spectrometer crystal
|
451
|
20 Nov 2023, 07:12 |
Jayanath Koliyadu | SPB | Shift end | X-ray delivery
- 1.3-1.7 mJ, 10.7 keV, 1-100 pulses, stable delivery
Optical laser delivery
Achievements/Observations
- Installation of imaging optics and alignment
Issues
|
452
|
21 Nov 2023, 23:29 |
Adam Round | SPB | Shift end | Staff: AR, MS, DM, RL, RdW
X-ray delivery
- 16.9 keV, up to 30 pulses and 1.1 MHz for alignment, 1 pulse for data collection
- stable delivery
Optical laser delivery
Achievements/Observations
- Beam aligned down to zyla cam 3
- CRLs were inserted but created too much speckles on Jungfrau and we couldn't reach the expected 80 um beam size for the users lenses (arms 6 and 7 unusable, arm 4 hole feature in beam)
- user lenses aligned
- User beamstop installed to block 1st order line in horizontal direction
- Collected several speckle tracking data scans without our CRLs - to give initial estimates for focus
- Jungfrau timing confirmed - signal observed
Issues
- Could not see signal with the thin sample and the CRLs inserted
- clear aberations from our CRLs
- CRL arm 4 motors were not moving. To recover it, we connected the motor and encoder cables from the pinhole arm.
|
457
|
23 Nov 2023, 23:12 |
Adam Round | SPB | Shift end | Staff: AR, MS, DM, KK, RL, RdW
X-ray delivery
- 16.9 keV, up to 30 pulses and 1.1 MHz for alignment, 1 pulse for data collection
- 900 uJ
- Beam down around 1h
Optical laser delivery
Achievements/Observations
- XTD2 lenses were realigned
- Crystal diffraction data from lysozyme and MOF collected with detector close up
Issues
- Beam down around 1h
- Once again we lost connection to JF4M module 01 requiering reset of receivers.
|
|