ID Date Author Group Subjectdown
  91   21 Mar 2023, 23:36 Jayanath KoliyaduSPBShift end

Staff: JB, PV, TS, RL, RdW, JK, AR

X-ray delivery

  • 1-165 pulses, 1.1 MHz, upto 400  uJ @ 50 pC

Optical laser delivery

  • ns laser for imaging

Achievements/Observations

  • NKB focus optimization
  • Beam alignment until IBS
  • Photodiode alignment
  • Alignment of fixed target in the beam
  • Tests with fixed target motion in vacuum
  • Collected few runs with low transmission at 8 keV and 9 keV
  94   22 Mar 2023, 21:49 Adam RoundSPBShift end

X-ray delivery

  • 9 keV 1 to 165 pulses ~ 300 mj per pulse - stable delivery during the day

Optical laser delivery

  • ns lasers for illumination only

Achievements/Observations

  • Focus alignment
  • found illumination / shield (100 micron) conditions to optimise background on detector
  • observed that the flourecence signal on the diode was very low and this appears corelated with drift in the focus - after focus optimisation signal was again visible
  • several runs collected with varying attenuation with the aim to try to corelate flourecence signal on diode with beam intensity

Issues

  • Too high background from sample at full transmission required exchange of copper shield form 50 to 100 microns
  • disc detaching from motor spindle (twice) - first time disc blocked gate valve, second bolt and washer are in the gate valve mechanisme space
  • in both cases detector had to be warmed to allow venting.
  102   23 Mar 2023, 23:24 Jayanath KoliyaduSPBShift end

X-ray delivery

  • 1-165 pulses, 1.1 MHz - 28.2 kHz, upto 400  uJ @ 50 pC

Optical laser delivery

  • ns laser for imaging

Achievements/Observations

  • Optimized sample setup for data collection
  • Calibrated photodiode @ 8keV.
    • ADC signal was saturated with amplified photodiode signal.
    • Removed the amplifier and calibrated photodiode again.
    • ASE signal is visible without the amplifier
  • Optimized ASE signal by optimizing the focus and target position in focus
  • Checking and optiming the focus everytime chaning the sample disk seems to improve the signal
  • Collected data at 8 keV and 9 keV for about 1-2 hours
  105   24 Mar 2023, 23:14 Jayanath KoliyaduSPBShift end

X-ray delivery

  • 1-165 pulses, 1.1 MHz - 28.2 kHz, upto 350  uJ @ 50 pC

Optical laser delivery

  • ns laser for imaging

Achievements/Observations

  • Collected data for 3 to 4 hours with different samples
  • Data collection at lower repetiton rate (113 kHz) with less number of pulses
  107   25 Mar 2023, 23:18 Jayanath KoliyaduSPBShift end

X-ray delivery

  • 1-165 pulses, 1.1 MHz - 56.4 kHz, upto 350  uJ @ 50 pC

Optical laser delivery

  • ns laser for imaging

Achievements/Observations

  • Collected data for 3 to 4 hours with different samples
  • Data collection at lower repetiton rate (113 kHz) with less number of pulses
  • Data to characterize the divergence of ASE collected
  110   26 Mar 2023, 23:27 Jayanath KoliyaduSPBShift end

X-ray delivery

  • 1-165 pulses, 1.1 MHz - 56.4 kHz, upto 350  uJ @ 50 pC

Optical laser delivery

  • ns laser for imaging

Achievements/Observations

  • Collected data for about 6 hours with different samples
  • Data collection at lower repetiton rates with less number of pulses
  • Data to characterize the divergence of ASE collected
  • Photodiode calibrated at 8 keV again
  136   13 Apr 2023, 15:57 Jan GruenertXPDShift end

End of Diamond Sensor Study

We leave the SASE2 beamline in the following safe state:

  • Pre-Abs inserted
  • Solid ATT with T=0.001
  • All CRLs OUT
  • All imagers OUT
  260   18 Jun 2023, 07:31 Adam RoundSPBShift end

posting for 17th June

Staff: AR, AS, FK, HH, JB, KK, DZ, MK

X-ray delivery

  • 12.4 keV, 1.4 mJ

Optical laser delivery

  • 532 nm, ns-laser for sample pumping

Achievements/Observations

  • Continued to collect data many hours of data collection

Issues

  • coupling with SASE2 limited feedbacks to control slope across train, this led to dificulties in alignment and lost time to correct for poor visualisation of the beam.
  • After discussion SASE2 kindly gave permission to BKR to corect the slope to facilitate our alignment
    • we also with the help of PRC arranged for the same arrangment for alignment for sunday
  280   29 Jul 2023, 23:46 Adam RoundSPBShift end

X-ray delivery

  • 12.4 keV, up tp 352 pulses but the intensity drop across the train was too dramatic to use. reasonably stable delivery with 202 pulses.

Optical laser delivery

  • none

Achievements/Observations

  • reestablished direct beam trajectory and verified instrument alignment
  • collected flat field calibration for AGIPD-1M for all high priority scenarios and some additional settings (see table copied in SPB commissioning or original AGIPD log)
  293   08 Aug 2023, 22:57 Jayanath KoliyaduSPBShift end

X-ray delivery

  • 9.3 keV, ~ 2 mJ, stable delivery except for the intensity slope along the train (fixed later on)

Optical laser delivery

  • ns laser for imaging

Achievements/Observations

  • Aligned the instrument for MKB focus configuration
  • Optimzed MKB focus and detector background
  • PCS - Collected data for about 3-4 hours with different sample concentration and crystal sizes.

Issues

  • Issue with intensity slope along the pulse train (fixed later in the day)
  • Issue with MKB combined motion (DOC informed)
  303   12 Aug 2023, 22:50 Jayanath KoliyaduSPBShift end

X-ray delivery

  • 9.3 keV, up to 181 pulses at 564 kHz, 1.8 - 1.9 mJ

Optical laser delivery

  • PP Laser, 800nm, 50 fs, up to 181 pulses @ 564 kHz and 91 pulses at 282 kHz, stable delivery

Achievements/Observations

  • Installed and aligned fixed target for pump-probe measurement
  • Measured t0 with fixed target at IRU, scan tool to measure t0 was also tested
  • Optimized Bimuth fixed target sample for diffraction condition
  • Recorded pump-probe data (30 min 1 hour)
  • Spatial and temporal overlap of X-ray and PP laser at PAM

Issues

  • Issue with homing smaract stages used in fixed target. Solved by exchanging the stages for now but need to be checked later.
  • Difficulties in observing pump-probe signal in online data analysis although diffraction signal could be seen and optmized on the fluorescent paper on DN500 and AGIPD detector
    • Data collected for further offline analysis
  304   13 Aug 2023, 21:33 Jayanath KoliyaduSPBShift end

X-ray delivery

  • 9.3 keV, up to 181 pulses at 564 kHz, 8 - 1.3 mJ
  • Issue with pulse energy stability along the pulse train in the morning but optimzed later on in the day

Optical laser delivery

  • PP Laser, 800nm, 50 fs, up to 181 pulses @ from 10 Hz to564 kHz

Achievements/Observations

  • Optimized Bismuth diffraciton condition on AGIPD
  • Collected pump-probe data with Bismuth fixed target
  • Aligned PAM and measured arrival time with electron bunch arrival time slope enabled
    • Positive slope and V shape slope measured

Issues

  • Issues with beam stability and intenisty.
    • Optimized later on in the day
    • But did not recover what we had yesterday in terms of pulse energy
  348   20 Sep 2023, 02:09 Jayanath KoliyaduSPBShift end

X-ray delivery

  • 7 keV, 2.1 mJ, stable delivery

Optical laser delivery

  • None

Achievements/Observations

  • M1, M2 pre alignment for this weeks beamtime
  • Checked the beam trajectory through MKB mirrors after stripe change

Issues

  • It seems that with wider funnel for the catcher, the YAG is not reaching the X-ray beam

 

Note: At 7 keV with 100 pulses, and full beam we were at 2.2 W average power.

  355   23 Sep 2023, 07:04 Adam RoundSPBShift end

Staff:JK, RDW, AR

X-ray delivery

  • 7 keV 202 pulses 1.7mJ stabel across train and throughout the shift

Optical laser delivery

  • N/A

Achievements/Observations

  • faster changover and alignment
  • almost 6 hours of data aquisition - many good hits observed
  • strong diffraction in Hits required transmission to be reduced to 34%

Issues

  • maintaining synchronnisation for droplet overlap proved difficult effective hit rate of 0.3% observed
  • hits observed in beats as timing passed though overlap quite often - some periods where we could see hits in nearly every train but this could not be maintained.
  383   03 Oct 2023, 22:58 Harald SinnXROShift end

End of Euler shift: all 3 SASE2 mirrors are now working with the Euler MDL.

We left the beamline aligned to HED, with M1,M2 on Pt for upcoming HED experiment at 18 keV.

Pre-absorber closed, CRL1 out, Solid attenuater with some diamonds.

  395   19 Oct 2023, 23:30 Jayanath KoliyaduSPBShift end

X-ray delivery

  • 13.6 keV, ~1.7 mJ and up to 352 pulses at 1.1 MHz

Optical laser delivery

  • PP laser, 1 to 202 pulses, stable delivery except for the down time of ~1h

Achievements/Observations

  • user sample data collected for ~1.5h
  • PP laser timing scans done
  • new adapter for the screens holder designed, machined and installed

Issues

  • sample was growing on the adapter, preventing data collection
  • new adapter is too far downstream, partially shadowing sample diffraction on the lower corners of the detector
  • PP laser down for ~1h
  446   15 Nov 2023, 07:10 Jayanath KoliyaduSPBShift end

X-ray delivery

  • 1.3-1.7 mJ, 1-30 pulses, stable delivery

Optical laser delivery

  • None

Achievements/Observations

  • Aligned beam trajectory for 10.7 keV direct beam
  • Optimized the microscopy table position and references
  • Initial alignment and test of test of spectrometer crystal
  451   20 Nov 2023, 07:12 Jayanath KoliyaduSPBShift end

X-ray delivery

  • 1.3-1.7 mJ, 10.7 keV, 1-100 pulses, stable delivery

Optical laser delivery

  • None

Achievements/Observations

  • Installation of imaging optics and alignment

Issues

  • No major issue today
  452   21 Nov 2023, 23:29 Adam RoundSPBShift end

Staff: AR, MS, DM, RL, RdW

X-ray delivery

  • 16.9 keV, up to 30 pulses and 1.1 MHz for alignment, 1 pulse for data collection
  • stable delivery

Optical laser delivery

  • None

Achievements/Observations

  • Beam aligned down to zyla cam 3
  • CRLs were inserted but created too much speckles on Jungfrau and we couldn't reach the expected 80 um beam size for the users lenses (arms 6 and 7 unusable, arm 4 hole feature in beam)
  • user lenses aligned
  • User beamstop installed to block 1st order line in horizontal direction
  • Collected several speckle tracking data scans without our CRLs - to give initial estimates for focus
  • Jungfrau timing confirmed - signal observed

Issues

  • Could not see signal with the thin sample and the CRLs inserted
  • clear aberations from our CRLs
  • CRL arm 4 motors were not moving. To recover it, we connected the motor and encoder cables from the pinhole arm.
  457   23 Nov 2023, 23:12 Adam RoundSPBShift end

Staff: AR, MS, DM, KK, RL, RdW

X-ray delivery

  • 16.9 keV, up to 30 pulses and 1.1 MHz for alignment, 1 pulse for data collection
  • 900 uJ
  • Beam down around 1h

Optical laser delivery

  • None

Achievements/Observations

  • XTD2 lenses were realigned
  • Crystal diffraction data from lysozyme and MOF collected with detector close up

Issues

  • Beam down around 1h
  • Once again we lost connection to JF4M module 01 requiering reset of receivers.