Group Selection Page HELP Controls Group Data Analysis Group ITDM WP76 DET Vacuum EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Operation PSPO XO TS Migrated2Zulip
OPERATION-2025 OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2023 logbook, Contact: F.Wolff-Fabris, A.Galler, L.Samoylova, H.Sinn, Page 15 of 24  Not logged in ELOG logo
Entry   Shift end, posted by Jayanath Koliyadu on 21 Mar 2023, 23:36 
Staff: JB, PV, TS, RL, RdW, JK, AR

X-ray delivery


1-165 pulses, 1.1 MHz, upto 400  uJ @ 50 pC


Optical laser delivery
Entry   Shift end, posted by Adam Round on 22 Mar 2023, 21:49 
X-ray delivery


9 keV 1 to 165 pulses ~ 300 mj per pulse - stable delivery during the day


Optical laser delivery


ns lasers for illumination only


Achievements/Observations
Entry   Shift end, posted by Jayanath Koliyadu on 23 Mar 2023, 23:24 
X-ray delivery


1-165 pulses, 1.1 MHz - 28.2 kHz, upto 400  uJ @ 50 pC


Optical laser delivery


ns laser for imaging


Achievements/Observations
Entry   Shift end, posted by Jayanath Koliyadu on 24 Mar 2023, 23:14 
X-ray delivery


1-165 pulses, 1.1 MHz - 28.2 kHz, upto 350  uJ @ 50 pC


Optical laser delivery


ns laser for imaging


Achievements/Observations
Entry   Shift end, posted by Jayanath Koliyadu on 25 Mar 2023, 23:18 
X-ray delivery


1-165 pulses, 1.1 MHz - 56.4 kHz, upto 350  uJ @ 50 pC


Optical laser delivery


ns laser for imaging


Achievements/Observations
Entry   Shift end, posted by Jayanath Koliyadu on 26 Mar 2023, 23:27 
X-ray delivery


1-165 pulses, 1.1 MHz - 56.4 kHz, upto 350  uJ @ 50 pC


Optical laser delivery


ns laser for imaging


Achievements/Observations
Entry   Shift end, posted by Jan Gruenert on 13 Apr 2023, 15:57 
End of Diamond Sensor Study

We leave the SASE2 beamline in the following safe state:


Pre-Abs inserted
Solid ATT with T=0.001
All CRLs OUT
All imagers OUT
Entry   Shift end, posted by Adam Round on 18 Jun 2023, 07:31 
posting for 17th June

Staff: AR, AS, FK, HH, JB, KK, DZ, MK

X-ray delivery
Entry   Shift end, posted by Adam Round on 29 Jul 2023, 23:46 
X-ray delivery


12.4 keV, up tp 352 pulses but the intensity drop across the train was too dramatic to use. reasonably stable delivery with 202 pulses.


Optical
laser delivery
Entry   Shift end, posted by Jayanath Koliyadu on 08 Aug 2023, 22:57 
X-ray delivery


9.3 keV, ~ 2 mJ, stable delivery except for the intensity slope along the train (fixed later on)


Optical laser
delivery
Entry   Shift end, posted by Jayanath Koliyadu on 12 Aug 2023, 22:50 
X-ray delivery


9.3 keV, up to 181 pulses at 564 kHz, 1.8 - 1.9 mJ


Optical laser delivery


PP Laser, 800nm, 50 fs, up to 181 pulses @ 564 kHz and 91 pulses at 282 kHz, stable delivery


Achievements/Observations
Entry   Shift end, posted by Jayanath Koliyadu on 13 Aug 2023, 21:33 
X-ray delivery


9.3 keV, up to 181 pulses at 564 kHz, 8 - 1.3 mJ
Issue with pulse energy stability along the pulse train in the morning but
optimzed later on in the day


Optical laser delivery
Entry   Shift end, posted by Jayanath Koliyadu on 20 Sep 2023, 02:09 
X-ray delivery


7 keV, 2.1 mJ, stable delivery


Optical laser delivery


None


Achievements/Observations
Entry   Shift end, posted by Adam Round on 23 Sep 2023, 07:04 
Staff:JK, RDW, AR

X-ray delivery


7 keV 202 pulses 1.7mJ stabel across train and throughout the shift


Optical laser delivery
Entry   Shift end, posted by Harald Sinn on 03 Oct 2023, 22:58 
End of Euler shift: all 3 SASE2 mirrors are now working with the Euler MDL.

We left the beamline aligned to HED, with M1,M2 on Pt for upcoming HED experiment at 18 keV.

Pre-absorber closed, CRL1 out, Solid attenuater with some diamonds.
Entry   Shift end, posted by Jayanath Koliyadu on 19 Oct 2023, 23:30 
X-ray delivery


13.6 keV, ~1.7 mJ and up to 352 pulses at 1.1 MHz


Optical laser delivery


PP laser, 1 to 202 pulses, stable delivery except for the down time of ~1h


Achievements/Observations
Entry   Shift end, posted by Jayanath Koliyadu on 15 Nov 2023, 07:10 
X-ray delivery


1.3-1.7 mJ, 1-30 pulses, stable delivery


Optical laser delivery


None


Achievements/Observations
Entry   Shift end, posted by Jayanath Koliyadu on 20 Nov 2023, 07:12 
X-ray delivery


1.3-1.7 mJ, 10.7 keV, 1-100 pulses, stable delivery


Optical laser delivery


None


Achievements/Observations
Entry   Shift end, posted by Adam Round on 21 Nov 2023, 23:29 
Staff: AR, MS, DM, RL, RdW

X-ray delivery


16.9 keV, up to 30 pulses and 1.1 MHz for alignment, 1 pulse for data collection
stable delivery


Optical
Entry   Shift end, posted by Adam Round on 23 Nov 2023, 23:12 
Staff: AR, MS, DM, KK, RL, RdW

X-ray delivery


16.9 keV, up to 30 pulses and 1.1 MHz for alignment, 1 pulse for data collection
900 uJ
Beam down around 1h


Optical
ELOG V3.1.4-7c3fd00