  OPERATION-2023 logbook, Contact: F.Wolff-Fabris, A.Galler, L.Samoylova, H.Sinn, Page 14 of 24  Not logged in ELOG logo
Entry   Late shift summary 21.10.2023, posted by Sergii, Giacomo on 21 Oct 2023, 23:34 
Achievements:
-Collecting TR-RIXS data for different fluencies and delay range
Problems
Entry   night shift summary, 22.10.2023, posted by Laurent, Phuong on 22 Oct 2023, 07:34 

Night shift summary 22.10.2023

Laurent, Phuong
Achievement:
-Collecting static RIXS data at different FEL repitition rates
Entry   Shift summary, posted by Benjamin van Kuiken on 22 Oct 2023, 13:21 
Morning shift Summary 22.10.2023

Achievements


Checked beam alignment and overlap

confirmed sample integrity with static rixs on other sample locations
Problems
Entry   Late shift summary 22.10.2023, posted by Sergii , Giacomo on 23 Oct 2023, 01:38 
Achievements
-Check XAS and static RIXS after the beam was back
-Do the warm up cycle to remove ice from the sample surface
Entry   Night shift summary, 23.10.2023, posted by Laurent Mercadier on 23 Oct 2023, 06:46 
 

Entry   Morning Shift Summary, 24.10.2023, posted by Sergii, Teguh on 25 Oct 2023, 15:10 

Morning Shift Summary, 24.10.2023

Achievements:


Re-aligned the beamline after maintenance
Found time zero using SiN at 300 K
Change the He dewar and cooled down
back to 20 K
Adjusted the AFS laser parameters to recover the proper experiment settings
Started taking tr-RIXS with several time
Entry   Morning Shift Summary, 25.10.2023, posted by Sergii, Teguh on 25 Oct 2023, 15:18 

Morning Shift Summary, 25.10.2023

Achievements:


Re-aligned FEL beam pointing and beamline mirrors after XGM intensity drop due to slow beam pointing drift over night.
Continued
taking momentum-dependent tr-REXS data.


Problems:
Entry   night shift summary, posted by Andreas Scherz / Eugenio Paris on 26 Oct 2023, 07:13 
Night shift summary

Achievements:
- Recovered time0 on SiN (time0 moved >20ps after FEL beam loss in the evening)
Entry   Morning shift summary, 26.10.2023, posted by Sergii, Teguh on 26 Oct 2023, 15:03 

Morning shift summary, 26.10.2023

Achievements:


Continued measuring tr-RIXS at different laser fluences


Problems:


The max-jhub notebook server was very slow this morning around 9-10 h. DOC was informed, but the slowness has improved without any action
Entry   Late shift summary, 26.10.2023, posted by Robert Carley on 26 Oct 2023, 23:25 

Achievements:


Continued with tr-RIXS


No problems
Entry   Night shift summary, posted by Benjamin van Kuiken on 12 Nov 2023, 07:24 p6696-r59.png
# Shift Summary

Achievements
 - Found RIXS signal from CuO as well as off-resonant elastic line signals from NiO and CoO
Entry   shift summary, posted by Loic Le Guyader on 13 Nov 2023, 07:16 
# Shift Summary

Achievements
 - Measured elastic line with 3000 l/mm and 1000 l/mm grating on NiO sample
Entry   Issue, posted by Jan Gruenert on 16 Jan 2023, 19:50 JG_2023-01-16_um_16.30.12.pngJG_2023-01-16_um_16.30.50.png
Problem: Beam operation in SASE2 is prohibited by SEPS / MPS
Origin of problem: HED-CRL3
(this was already an issue during the past weekend)
Entry   Issue, posted by Jan Gruenert on 17 Jan 2023, 10:25 JG_SASE3_no_beam_permission_2023-01-17_09-13-31.png
SASE3 peration issue - SOLVED

 

Controls issue, the machine cannot make beam in SASE3.

From
BKR / DOOCS the problem description is: Big Brother is blocking SASE3 beam due to an EPS power limit of 0 Watt.


Looking into the SASE3 karabo topic, many devices are not instantiated, ATT #1.

The state of the PREABS  preabsorber is not known
Entry   Issue, posted by Jan Gruenert on 22 Jan 2023, 18:40 JG_2023-01-22_um_17.43.36.pngJG_2023-01-22_um_18.17.31.pngJG_2023-01-22_um_18.23.20.pngJG_2023-01-22_um_18_1.37.21.png
SASE1 blocked to 1 bunch/train by EPS interlock (sic, not 2 but 1) --- PARTIALLY RESOLVED

Several issues:

1) MODEM device is broken, in state UNKNOWN, see ATT#1 and ATT#2. Fixed with deinstatiating and then using BECKHOFF_ASSISTANT to re-instantiate.
Entry   Status, posted by Jan Gruenert on 23 Jan 2023, 10:43 JG_2023-01-23_um_10.04.56.png
Status of machine SASE tuning (just before switching off for monday maintenance):




11.5 GeV operation
SASE1
SASE2
SASE3


Photon
energy
7 keV
7 keV
700 eV


Max. obtained average pulse energy
3.25 mJ
1.35
Entry   All SASE's - SEPS Interlock Test - Results, Status & Upcoming Schedule, posted by Raśl Villanueva-Guerrero on 25 Jan 2023, 08:40 
Dear all,

please find here a summary of the status on this critical topic provided yesterday evening (around 19:15) by Zunaira Ansari (extract from her
e-mail).
Entry   ZZ Access on 24th January (19:30h) - Replacement of Motor on SASE2 Undulator - Cell 17 Phase Shifter, posted by Raśl Villanueva-Guerrero on 25 Jan 2023, 08:44 
Dear all,

last evening Suren Karabekyan and myself did a short notice ZZ access to XTD1. The reason is that machine operators detected the lack of response
on the Cell 17 Phase Shifter. The intervention was successful and around 20:30 we left the tunnel.
Entry   Issue, posted by Harald Sinn on 05 Feb 2023, 15:18 
15:15  SCS called and reported an issue with one of the motors of the SCS exit slit. DOC already looked at the problem and could not make the motor
move. XRO (Maurizio) is now informed and looks at the problem

17:10 ZZ access to XTD by Maurzio and Mikako
Entry   Status, posted by Andreas Galler on 11 Feb 2023, 13:55 
Gun Modulator Problems

Gun Trip at 11:23 and since then the Modulator trips after each restart.
Accelerator Shift Crews and On Call personnel working on fixing the issue.