268
|
20 Jul 2023, 18:23 |
Kelin Tasca | XRO | FXE beam alignment 9 keV 2 mrad |
|
Attachment 1: 2023-07-20_17-34-11_SA1_FXE_alignment.png
|
|
Attachment 2: 2023-07-20_17-10-45_SRA.png
|
|
267
|
20 Jul 2023, 20:21 |
Kelin Tasca | XRO | Shift summary of SASE1 alignment |
Beam aligned to SPB Pop-In https://in.xfel.eu/elog/XRO+Beam+Commissioning/185
Beam aligned to FXE Pop-In https://in.xfel.eu/elog/XRO+Beam+Commissioning/187
Vibration tests: https://in.xfel.eu/elog/XRO+Beam+Commissioning/188
Camera of M2 may not be working. Please check.
|
271
|
21 Jul 2023, 17:22 |
Kelin Tasca | XRO | Summary of SA1 shift for XO and instruments |
PBLM checked: https://in.xfel.eu/elog/XRO+Beam+Commissioning/203
Solid attenuators checked: https://in.xfel.eu/elog/XRO+Beam+Commissioning/194 |
21
|
09 Feb 2023, 01:11 |
Jörg Hallmann | | Shift summary Feb 8th |
stable beam at 9kev (about 1.1 mJ)
checks of the sample environment required for the upcoming user experiment
test data aquisition of SiO2 samples (data analysis still ongoing)
commissioning of Jungfrau detectors & XTD6_ATT (closed loop operation)
test of operation with two different AGIPD triggers - normal one and an early one (leaving out the first 71 cells of AGIPD)
issues:
spectrometer motor XTAL_RX still not usable
first arm of XTD1_CRL is interlocked and cannot be used
|
24
|
11 Feb 2023, 01:09 |
Jörg Hallmann | MID | Shift summary |
sucessfull data taking for user samples
beam loss for ~15 min and a small issue with scannerX of the FSSS (could be fixed without support) but otherwise smooth operation
contact with ITDM since the data collection speed could be too high for the transfer speed from SDD to HDD - should be kept under investigation....
|
27
|
12 Feb 2023, 01:56 |
Jörg Hallmann | | Shift summary Feb 11th |
intense data taking on various samples
2 main issues:
- data collection using the optimize macro is too fast for the system and calibration and the data transfer from SDD to HDD is slower than collecting new data
- FSSS axis scannerY gives frequent errors since this night which is stopping the macro - check by morning shift & DOC is required |
112
|
29 Mar 2023, 01:31 |
Jörg Hallmann | MID | Shift summary March 28th |
Seeding at 9 keV with 800 - 1000uJ intensity
1. alignment of the lower branch of the SDL
2. focussing with CRL2 and check of the beam size using wire scans (slightly more than 10 um)
3. calibration of the EPIX2 position using calibrant LaB6 and optimizing its position
4. measuring scattering of the sample (not a conclusive behaviour yet) |
113
|
30 Mar 2023, 02:37 |
Jörg Hallmann | MID | shift summary March 29th |
achievments: alignment of the SDL (both branches)
measuring of samples & calibrants
issues:
- broken laser interlock - cannot be set - PRC is informed and contacted SRP - repair expected in the morning
- ScannerX broken - morning shift might contact DOC or expert
- EPIXs do not send data after rearrangement of the modules - expert consulation might be necessary |
116
|
31 Mar 2023, 01:51 |
Jörg Hallmann | MID | shift summary March 30th |
- seeding at ~800 uJ
- repaired the laser interlock of A.08
- EPIX back in operation
- timing difference of both branches of the SDL measured with the optical laser (~4ps)
- measurement of samples with single & both branches (damage threshold, crystallization studies & studies on reversible changes)
|
209
|
25 May 2023, 01:59 |
Jörg Hallmann | MID | Shift summary |
optimization of seeding ongoing
tasks achieved during alignment:
- polarizer aligned
- analyzer aligned
- detectors + ADQ412 in operation
- check on the energy (up to know, the energy is fine)
|
294
|
09 Aug 2023, 01:42 |
Jörg Hallmann | MID | Shift summary |
- after alignment of the beam, the main topic of the day were flatfields for the AGIPD with various settings
- corresponding darks have been taken in addition
-
- it was challenging to generate proper flatfield intensities on the detector (1photon peak equally high as the 0photon peak) due to the low intensity (750uJ)
- shift crew received a warning of the machine that using the required 352 pulses for longer time could lead to an overheating of components in the machine -> flatfields were generated by using 172 pulses and sticking them together by shifting the delay
|
295
|
10 Aug 2023, 01:31 |
Jörg Hallmann | MID | Shift summary |
- finalized the flatfields of the AGIPD at 0.5 MHz
- optimized the performance of the beam (now 850 - 950 uJ)
- measured flatfield and darks for the Jungfrau detector
- optimized the instrument alignment of FEL beam and ALAS to the center of rotation
|
298
|
11 Aug 2023, 01:44 |
Jörg Hallmann | MID | Shift summary |
alignment checks of the CRL2 device as well as the Mono - continuation of both devices together planned for tomorrow
flatfelds for EPIX & AGIPD (needed to be redone because of too low intensity during the previous measurements)
installation of the levitation device and first test measurements
|
300
|
12 Aug 2023, 01:32 |
Jörg Hallmann | MID | Shift summary |
measured various sample using the levitation device
issues:
during the change of the sample detector distance, the AGIPD chiller "Julabo" switch itself off and went into error - on & off procedure solved the problem and need further investigation
|
456
|
23 Nov 2023, 22:15 |
Jörg Hallmann | MID | Shift summary |
progress with the Damnit - XPCS analysis test with various samples (SiO2, Ludox etc.)
tested some external samples P3HT, SOD1 but it looks like conventional XPCS is not working (signal too low - increasing transmission leads to radiation damage in both cases)
checked the diamond attenuators in the tunnel & optics hutch - all thicknesses indicated in the scenes seem to be correct
issue: AGIPD HV switched off by itself - ramping up again was possible
|
306
|
17 Aug 2023, 11:04 |
Justine Schlappa, Le Phuong | SCS | Late Shift Summary on 15.08.2023 |
Achievements:
- Set up PP laser, find spatial and temporal overlap between FEL and PP laser
- Optimize MCP and HAMP settings for good XAS signal
- Find time zero from XAS on sample and optimize for XAS delay scans at 40 deg incidence angle
- Take a fluence series on XAS delay scan from about 0.1 mJ/cm2 up to 2.5 mJ/cm2
Problems:
Nothing of note |
334
|
07 Sep 2023, 07:24 |
Justine Schlappa, Guiseppe Mercurio | SCS | Shift summary, September 7 after nightshift |
Achievements:
- Optimized hRIXS settings for OK edge at 145 deg scattering angle, resolution of about 50 meV
- Transferred the user sample
- Prepared for delay scans on fluorescence signal from YBCO
Problems:
- There was no internet connection at XFEL and DESY for some time
- hRIXS camera goes frequently into error
- XRD motors (STY) go frequently into error
Next steps:
- Find time zero on fluoresce signal from YBCO, test the same for the samples
- Test PP laser damage threshold |
311
|
17 Aug 2023, 23:54 |
Justine Schlappa | SCS | Afternoon Shift Summary on 17.08.2023 |
Achievements:
1. Finalized tr-RIXS series at 1.74 mJ/cm2
2. Checked FEL alignment
3. Started fluence series for tr-RIXS on peak C, completed: 1, 1.5 and 2 mJ/cm2
Problems:
1. We noticed that calculator for PP laser fluence was not giving a correct value. The formula was corrected and the older logbook entries need to be checked. We start to use the "new values" from now on.
2. XAS processor get stuck and was restarted
3. left PC (pcx30525) got stuck and had to be restarted
4. hRIXS camera scene got stuck, so that it would not operate the PP laser delay stage. Help from DOC.
--> Solution: shutdown and reinstatiate device: SCS_HRIXS_DET/MDL/CAMERA_SHUTTER
Shift Plan:
Continue fluence series for: 0.5, 2.5, 3 mJ/cm2. Decide about further data points. |
74
|
05 Mar 2023, 23:13 |
Juncheng E | SPB | Shift summary |
X-ray delivery
- 9.3 keV, 202 pulses, 564 kHz, intensity slope was fine
Optical laser delivery
- 800 nm, 68 pulses, 188 kHz. stable delivery
- ns laser for illumination
Achievements/Observations
- Continue nanofocusing setup with pump-probe experiment
- Continue Collecting TR-SFX data
|
81
|
15 Mar 2023, 01:50 |
Johannes Moeller | | shift summary |
- HXRSS delivery, 600 - 700 uJ, 1 bunch, 8.991 keV. Pedestal visibly in HIREX, not checked with MID spectrometer yet.
- beamline aligned and beam brought to popin imager
- struggle with jet pumping, to be continued
- beam brought into experimental hutch, first rough alignment of reference samples and cameras
- Epix flight path leaked and window re-glued
|