ID |
Date |
Author |
Group |
Subject |
260
|
18 Jun 2023, 07:31 |
Adam Round | SPB | Shift end | posting for 17th June
Staff: AR, AS, FK, HH, JB, KK, DZ, MK
X-ray delivery
Optical laser delivery
- 532 nm, ns-laser for sample pumping
Achievements/Observations
- Continued to collect data many hours of data collection
Issues
- coupling with SASE2 limited feedbacks to control slope across train, this led to dificulties in alignment and lost time to correct for poor visualisation of the beam.
- After discussion SASE2 kindly gave permission to BKR to corect the slope to facilitate our alignment
- we also with the help of PRC arranged for the same arrangment for alignment for sunday
|
280
|
29 Jul 2023, 23:46 |
Adam Round | SPB | Shift end | X-ray delivery
- 12.4 keV, up tp 352 pulses but the intensity drop across the train was too dramatic to use. reasonably stable delivery with 202 pulses.
Optical laser delivery
Achievements/Observations
- reestablished direct beam trajectory and verified instrument alignment
- collected flat field calibration for AGIPD-1M for all high priority scenarios and some additional settings (see table copied in SPB commissioning or original AGIPD log)
|
355
|
23 Sep 2023, 07:04 |
Adam Round | SPB | Shift end | Staff:JK, RDW, AR
X-ray delivery
- 7 keV 202 pulses 1.7mJ stabel across train and throughout the shift
Optical laser delivery
Achievements/Observations
- faster changover and alignment
- almost 6 hours of data aquisition - many good hits observed
- strong diffraction in Hits required transmission to be reduced to 34%
Issues
- maintaining synchronnisation for droplet overlap proved difficult effective hit rate of 0.3% observed
- hits observed in beats as timing passed though overlap quite often - some periods where we could see hits in nearly every train but this could not be maintained.
|
452
|
21 Nov 2023, 23:29 |
Adam Round | SPB | Shift end | Staff: AR, MS, DM, RL, RdW
X-ray delivery
- 16.9 keV, up to 30 pulses and 1.1 MHz for alignment, 1 pulse for data collection
- stable delivery
Optical laser delivery
Achievements/Observations
- Beam aligned down to zyla cam 3
- CRLs were inserted but created too much speckles on Jungfrau and we couldn't reach the expected 80 um beam size for the users lenses (arms 6 and 7 unusable, arm 4 hole feature in beam)
- user lenses aligned
- User beamstop installed to block 1st order line in horizontal direction
- Collected several speckle tracking data scans without our CRLs - to give initial estimates for focus
- Jungfrau timing confirmed - signal observed
Issues
- Could not see signal with the thin sample and the CRLs inserted
- clear aberations from our CRLs
- CRL arm 4 motors were not moving. To recover it, we connected the motor and encoder cables from the pinhole arm.
|
457
|
23 Nov 2023, 23:12 |
Adam Round | SPB | Shift end | Staff: AR, MS, DM, KK, RL, RdW
X-ray delivery
- 16.9 keV, up to 30 pulses and 1.1 MHz for alignment, 1 pulse for data collection
- 900 uJ
- Beam down around 1h
Optical laser delivery
Achievements/Observations
- XTD2 lenses were realigned
- Crystal diffraction data from lysozyme and MOF collected with detector close up
Issues
- Beam down around 1h
- Once again we lost connection to JF4M module 01 requiering reset of receivers.
|
463
|
26 Nov 2023, 23:26 |
Adam Round | SPB | Shift summary | X-ray delivery
- 16.9 keV, up to 30 pulses and 1.1 MHz for alignment, 1 pulse for data collection
- 800 uJ
- Beam pointing and corrected with M2 Ry piezo stepping optimizing scatering intensity seen on JF4M
Optical laser delivery
Achievements/Observations
- Crystal diffraction data from user samples
Issues
- pointing stability was again an issue but adjusting with M2 Ry piezo stepping optimizing scattering intensity seen on JF4M enabled online correction
|
251
|
13 Jun 2023, 06:49 |
Abhisakh Sarma | | Taking the beam | BKR changed the beam energy from 15 keV to 12.4 keV
Energy 12.4 keV
Repeatation rate 1.1 MHz
Average pulse energy 1.8 mJ
|
Attachment 1: Screenshot_from_2023-06-13_06-57-01.png
|
|
257
|
16 Jun 2023, 11:42 |
Abhisakh Sarma | SPB | Status | Beam is back at around 11:30 pm
We lost 1 hr 30 min of beam time.(it was promised to get back at around 10:00 am)
If we want to change the pulse number then we need to call BKR. |
Attachment 1: Screenshot_from_2023-06-16_11-41-39.png
|
|
384
|
11 Oct 2023, 06:22 |
Abhisakh Sarma | SPB | Shift summary | X-ray delivery
- 7.8 keV, up to 30 pulses at 94 kHz, 3 mJ
Optical laser delivery
Achievements/Observations
Issues
- AGIPD's asics interlocked several times. Marcin was informed and he tried to solve the issue remotely but did not work.
- Marcin observed that the AGIPD's chiller temperature was increasing since afternoon and not going down below -16 degree. Probablly the chiller is no longer at proper state. Macrin was onsite and tried to solve the issue without success. Informed to detector group
- Difficulties with alignment of direct beam path until NKB
|
|