ID |
Date |
Author |
Group |
Subject |
115
|
30 Mar 2023, 06:53 |
Tokushi Sato | SPB | Shift summary | X-ray delivery
- 1-202 pulses, 564, 282, 141 kHz, stable delivery
Optical laser delivery
- 800nm, 50 fs, 282 kHz, stable delivery
Achievements/Observations
- Alignment for Pump-probe experiment was finished
- Sample was tested
Issues
|
118
|
31 Mar 2023, 06:59 |
Tokushi Sato | SPB | Shift summary | X-ray delivery
- 1-202 pulses, 564, 282, 141 , 70.5 kHz, stable delivery
Optical laser delivery
- 800nm, 50 fs, 282 kHz, stable delivery
Achievements/Observations
- Resasnable amout of data was collected
- Sample was tested
Issues
|
119
|
01 Apr 2023, 06:51 |
Tokushi Sato | SPB | Shift summary | X-ray delivery
- 1-202 pulses, 564 kHz, stable delivery
- Beam was down from 06:08
Optical laser delivery
- 800nm, 50 fs, 282 kHz, stable delivery
Achievements/Observations
- Resasnable amout of data was collected
Issues
|
173
|
04 May 2023, 06:41 |
Tokushi Sato | SPB | Shift summary | X-ray delivery
- 12.4 keV 200 pulses / train, relatively stable intensity ~0.8 mJ / pulse
- took some time in changing X-ray energy (from 19.16 keV to 12.4 keV)
Optical laser delivery
- 420 nm PP laser
- ns laser for jet imaging
Achievements/Observations
- M1 & M2 offset mirror optimized
- NKB focus roughly optimized (we used defocused X-ray beam, about 2um)
- Collected several runs for inside nozzle pump excitation project (both adaptive gain and fixed MG modes)
- Nozzle damage with PP laser tested (before and after the night shift)
Issues
- AGIPD FPGA (2nd hemisphere) issue (requied a power cycle)
|
176
|
05 May 2023, 00:50 |
Tokushi Sato | SPB | Issue | Laser synchronization is gone, unlocked from 04.05.2023, 22.47. E-mail was sent to lbsync-expert@desy.de and c.c. to las-op@xfel.eu. |
Attachment 1: Screenshot_from_2023-05-05_00-31-48_1.png
|
|
178
|
05 May 2023, 06:44 |
Tokushi Sato | SPB | Shift summary | X-ray delivery
- 12.4 keV 200 pulses / train, relatively stable intensity ~0.8 mJ / pulse
Optical laser delivery
- 420 nm PP laser
- ns laser for jet imaging
Achievements/Observations
- M1 & M2 offset mirror optimized again (not really optimum but acceptable)
- NKB focus checked and defocused to have about 2um beam
- Collected a few dark runs and about 30 runs with PP laser in adaptive gain mode
Issues
- AGIPD Fixed MG mode issue
- PP-laser sync issue, but it was solved quickly, thanks to Lbsync team
- Beam pointing in the FEL Imager was quite off in the beginning of the shift
- Hit rate too low (~0.3%)
|
185
|
06 May 2023, 06:55 |
Tokushi Sato | SPB | Shift summary | X-ray delivery
- 12.4 keV 200 pulses / train, relatively stable intensity ~1.2 mJ / pulse
Optical laser delivery
- 420 nm PP laser
- ns laser for jet imaging
Achievements/Observations
- NKB focus checked and defocused to have about 3um(H) x 6um(V) beam
- Collected a few hours data with PP laser on both jet and nozzle excitations (AGIPD in adaptive gain mode)
Issues
- IRU Chamber LED was ON until 2:51am
- Nozzle damage found after ~1 hour measurement
- Hit rate seems too low still (less than 1%)
- Nozzle exploded close to the end of the shift
|
206
|
18 May 2023, 18:41 |
Tokushi Sato | SPB | Shift summary | X-ray delivery
- 9.3 keV, ~1 mJ, 1-30 pulses, stable delivery
Optical laser delivery
Achievements/Observations
- Direct beam trajectory alignment
- Alignemnt of IRD and microscopy screens
- rough alignment of XPD WFS
Issues
- beam down for sometime
- AGIPD slow data configuration issue, solved by DRC+Cal OCD
|
207
|
19 May 2023, 18:39 |
Tokushi Sato | SPB | Shift summary | X-ray delivery
- 9.3 keV, 800 uJ, 1-200 pulses, stable delivery
Optical laser delivery
Achievements/Observations
- CRL chamber alignment
- CRL lens stack alignment
- XPD WFS alignment with CRL focused beam
Issues
- Some of the CRL lens stacks needs realignment
|
208
|
21 May 2023, 18:38 |
Tokushi Sato | SPB | Shift summary | X-ray delivery
- 9.3 keV, 800 uJ, 1-200 pulses, stable delivery
Optical laser delivery
Achievements/Observations
- HWFS direct beam measured
- CRL focus measured with YAG screen and camera
- Setup for CRL heating measurement installed
Issues
- Difficulties with operation and syncrhonization of FLIR IR camera
|
210
|
25 May 2023, 06:35 |
Tokushi Sato | SPB | Shift summary | X-ray delivery
- 10.7 keV, 1.2 mJ, 1-200 pulses, stable delivery
Optical laser delivery
Achievements/Observations
- Crystal alignment for X-ray microscopy except one crystal
- Sample camera and Cu mesh were aligned to X-ray position
Issues
- We found strange strip on the beam in XTD0 screen
|
318
|
22 Aug 2023, 23:32 |
Tokushi Sato | SPB | Shift summary | X-ray delivery
- 9.3 keV, up to 178 pulses at 564 kHz, 3.7 mJ, stable delivery
- Beam delivery was started from 19:00
Optical laser delivery
- PP Laser, 800nm, 50 fs, up to 90 pulses @ 282 kHz
Achievements/Observations
- Alignment was completed within 3 hours including T0
- Some data collection with fixed target
Issues
- XTD9 safety shutter was closed
|
319
|
23 Aug 2023, 22:56 |
Tokushi Sato | SPB | Shift summary | X-ray delivery
- 9.3 keV, up to 185 pulses at 564 kHz, 3.7 mJ, beam intensity drop, missing last 10-20 pulses in train sometime
Optical laser delivery
- PP Laser, 800nm, 50 fs, up to 90 pulses @ 282 kHz
Achievements/Observations
- Alinment for TR-SFX and PAM
- Data collection for IHR
Issues
- Beam intensity was not that stable
- Strange scattering from amorphous sample and powder diffraction were appeared during data collection
|
320
|
24 Aug 2023, 22:51 |
Tokushi Sato | SPB | Shift summary | X-ray delivery
- 9.3 keV, up to 185 pulses at 564 kHz, 3.7 mJ, stable delivery
Optical laser delivery
- PP Laser, 800nm, 50 fs, up to 90 pulses @ 282 kHz
Achievements/Observations
- Alinment for TR-SFX
- Data collection in dark state and excited state at 203.5 ns
Issues
- MDL devices and macros on macrosever2 were dead around 19:30, took more than 2 hours for recovery.
- Dark calibration issue
|
323
|
25 Aug 2023, 23:03 |
Tokushi Sato | SPB | Shift summary | X-ray delivery
- 9.3 keV, up to 185 pulses at 564 kHz, 2.7 mJ, stable delivery
Optical laser delivery
- PP Laser, 800nm, 50 fs, up to 62 pulses @ 188 kHz
Achievements/Observations
- Alinment for TR-SFX and data collection
Issues
- AGIPD vacuum gauge was in error, unplug and plug in fixed this error
|
327
|
27 Aug 2023, 23:09 |
Tokushi Sato | SPB | Shift summary | X-ray delivery
- 9.3 keV, up to 185 pulses at 564 kHz, 2.4 mJ, stable delivery
Optical laser delivery
- PP Laser, 800nm, 50 fs, up to 62 pulses @ 188 kHz
Achievements/Observations
- Alinment for TR-SFX and data collection
Issues
- Nozzles were clogged a lot, crystals were formed on catcher cone.
|
329
|
28 Aug 2023, 23:03 |
Tokushi Sato | SPB | Shift summary | X-ray delivery
- 9.3 keV, up to 185 pulses at 564 kHz, 2.3 mJ, stable delivery
Optical laser delivery
- PP Laser, 800nm, 50 fs, up to 62 pulses @ 188 kHz
Achievements/Observations
- Alinment for TR-SFX and data collection
Issues
- Karabo did not work sometime, lost more than 1 hours
|
341
|
13 Sep 2023, 02:18 |
Tokushi Sato | SPB | Shift summary | X-ray delivery
- 0.5 mj, improved to 1.1 mj xray energy in the evening
Optical laser delivery
- 50 fs, 860 nm as fundamental wavelength, 188 kHz
- ns for illumination,
Achievements/Observations
- Aligned the instrument to 9.3 keV
- Aligned the PPL laser
- Time zero PPL
- Measured sample, dark runs, including testing different sample conditions (filtered vs not filtered or lower cutoff)
- Measured TR-SFX
Issues
- Low xray energy, BKR improved it afternoon, from 0.5 to 1.1 mj, hopefully we could still get better the following days
- PP-laser AMPHOS issues
- The focus at IRU in the evening had issues, we had to redo the alignment partially. We also had to ask BKR to improve the beam alignment at FEL imager.
|
342
|
14 Sep 2023, 00:05 |
Tokushi Sato | SPB | Shift summary | X-ray delivery
- 1.1 mj, 564 kHz, 93 pulses, stable delivery
Optical laser delivery
- 50 fs, 860 nm as fundamental wavelength, 188 kHz
- ns for illumination,
Achievements/Observations
- Lots of data collection for TR-SFX
- Tried many samples and optimazation
Issues
- Beam fluctuation aorund 23 : 00
- Low hit rate. tried to improve, better than before.
|
344
|
14 Sep 2023, 23:03 |
Tokushi Sato | SPB | Shift summary | X-ray delivery
- 1.1 mj, 564 kHz, 93 pulses, stable delivery
Optical laser delivery
- 50 fs, 860 nm as fundamental wavelength, 188 kHz
- ns for illumination,
Achievements/Observations
- Lots of data collection for TR-SFX
Issues
- Sample was accumulated on catcher and strong diffraction was observed, need to vent chamber and clean it, but it happned end of beamtime, we decided to finish experiment
|
|