  Joint Operation and Readiness Logbook, Contact: T.Haas, A. Violante, G. Wellenreuther, Page 9 of 30  Not logged in ELOG logo
ID Date Author Locationdown Severity Subject
  70   10 Mar 2017, 12:53 Tobias HaasGeneralInformationUpdate of Tunnel Component Priority List after SASE1 Readiness Meeting

Note that due to a bug in the elog the name appeared wrongly in my previous message. In general: Avoid underscores in the file names! 

Attachment 1: 170310-Tunnel-Components-Priority-list.xlsx
  72   10 Mar 2017, 16:56 Tobias HaasGeneralInformationTunnel Commissioning Schedule for Week 11
Day Motion Vacuum EPS Other 
Monday Loop is up. AE continues tests on MC2 lib Loop up. AE investigates problem with ion pump controller Loop inactive  
Tuesday Loop is up. AE continues tests on MC2 lib Loop down. AE implements fix for ion pump controller Loop inactive  
Wednesday Loop down. AE adds ELMO and TECHNOSOFT Loop up for testing AE brings up loop  
Thursday Loop down. AE adds ELMO and TECHNOSOFT Loop up for testing AE brings up loop  
Friday Loop up for testing Loop up for testing Loop up for testing  

 

In addition it should be tried to have a so called "Happy Hour" every day from 0800 - 1000. During this time loops should be up if possible. Meaning that in the evening before leaving, developers bring loops back up.

  73   13 Mar 2017, 15:47 NEREA JARDONGeneralInformationVacuum and Motion down

Tomorrow, 14th of March, Vacuum and Motion loop will be down at least during morning due to technical reasons .

I will notify you when the works are finished.

  74   14 Mar 2017, 13:55 NEREA JARDONGeneralInformationVacuum and Motion down

Dear all,

Finally today the Vacuum and Motion will still running the hole day and I would have to stop them tomorrow morning. Before doing this operation, I will post an entry in the ELOG.

  76   15 Mar 2017, 11:31 NEREA JARDONGeneralInformationVacuum and Motion

Today Denis has to make some changes in the Vacuum and Motion hardware loop, therefore they would be down some time.

At least, we would try to keep the Vacuum loop up again for 3pm, therefore Valerii and Raul could use it with Karaboo.

  77   15 Mar 2017, 17:00 NEREA JARDONGeneralInformationVacuum and Motion

Vacumm and Motion are running again after the hardware changes.

  78   16 Mar 2017, 13:34 Torben FalkGeneralFeedbackWiring status

Wiring status SASE 1:

Wiring progress:

  • Internal wiring of the XGM in XTD 9 is done.
  • Vacuum part wiring of the XGM in XTD 9 is done (ready for local Beckhoff test).
  • Gas Panel wiring of the XGM in XTD 9 is done.
  • Crate wiring (ADAM & Femto crate) of the XGM in XTD 9 is done.

Upcoming work XTD 2:

  • Serial connection from Beckhoff to TCP 350.
  • Change cold plug cables into halogenfree cables.

Upcoming work XTD 9:

  • INHIBIT connection Iseg HV crate.
  • Serial connection from MTCA to RVC 300.

Upcoming work XTD 10:

  • Vacuum part wiring of XGM.
  • Gas Panel wiring of XGM.
  • Internal wiring of XGM.
  • Installing ADAM & Femto crate.
  • Measure cable lengths for Imager and prepare cables.
  79   16 Mar 2017, 16:54 NEREA JARDONGeneralInformationFuses replacement

Dear all,

Tomorrow in the morning is needed to add some fuses in the PLCs crate, therefore Vacuum and Motion would be down for more or less one hour from 9am. I will notify you when the PLCs are available to work again.

Thank you,

  80   17 Mar 2017, 10:49 NEREA JARDONGeneralInformationLoops up

Dear all, Vacuum and Motion loops are running again.

Thank you,

  81   17 Mar 2017, 12:11 Thomas TschentscherGeneralInformationUpdated Tunnel component status list
Updated list of tunnel high priority components after SASE1 Readiness mtg this morning. The list has also been sent for comments/clarifications to the involved Groups/People.
Attachment 1: 170317-Tunnel-Components-Priority-list.xlsx
  82   17 Mar 2017, 15:21 Adriano ViolanteGeneralInformationLoop status schedule for KW12

Dear all,

find here the foreseen loop status for KW12. The schedule could change. All changes will be notified by entries in the logbook.

 

Day Motion Vacuum EPS Other 
Monday Loop is up.  Loop up.  Loop up  
Tuesday Loop is up.  Loop down. AE updates loop (maybe short ) Loop up  
Wednesday Loop down. AE updates loop Loop up  Loop up  
Thursday Loop up Loop up  Loop up  
Friday Loop up  Loop up  Loop up  

 

 

  83   22 Mar 2017, 15:05 NEREA JARDONGeneralInformationMotion Loop

FYI. The Motion loop is again up and running.

  84   22 Mar 2017, 16:28 NEREA JARDONGeneralInformationMotion loop

Dear all,

tomorrow morning at 10h am, we will need the Motion PLC for roughly half hour to do some tests. During this time the PLC will be stop.

 

  86   23 Mar 2017, 10:06 NEREA JARDONGeneralInformationMotion up

Dear all,

The Motion loop is up and running again.

Thank you!

  87   24 Mar 2017, 13:21 Tobias HaasGeneralInformationSchedule for PLC and Karabo Week 13

 

Day Motion Loop Vacuum Loop EPS Loop SPB Tunnel Loop Karabo
Monday Loop up.  Loop up.  Loop up  Loop inactive Version update by CAS 12:00 - 18:00
Tuesday Loop up.  Loop up.  Loop up  Loop inactive Running and no change
Wednesday Loop up.  Loop up  Loop up  AE brings up loop Running and no change
Thursday Loop up Loop up  Loop up  AE brings up loop Running and no change
Friday Loop up  Loop up  Loop up  Loop up Running and no change

 

 
  88   24 Mar 2017, 15:24 Tobias HaasGeneralInformationUpdate of component priority list after weekly meeting
Attachment 1: 170324-Tunnel-Components-Priority-list.xlsx
  89   31 Mar 2017, 07:24 Liubov SamoylovaGeneralInformationWeb cameras in SASE1 tunnels
Attachment 1: TmpPhCom_CR_2017-03-31-1.pptx
  90   31 Mar 2017, 15:00 Tobias HaasGeneralInformationUpdate of component list after weekly meeting
Attachment 1: 170331-Tunnel-Components-Priority-list.xlsx
  91   31 Mar 2017, 15:03 Frederike WittmaackGeneralInformationMeeting Minutes 31 March 2017
http://tinyurl.com/lttzrtm
  92   31 Mar 2017, 16:02 NEREA JARDONGeneralInformationSASE1 EPS

Dear all,

EPS loop is running with the latest hardware updates. Today, when I was trying to update the loop, I have found that someone has powered off the EPS crate in XTD2 Rack 1.5. Please, if you have to do some work in any part of SASE 1, let us know about it.

Thank you!