SASE1 Status and SASE3 Readiness
|
Joint Operation and Readiness Logbook, Contact: T.Haas, A. Violante, G. Wellenreuther |
Not logged in |
|
|
Message ID: 72
Entry time: 10 Mar 2017, 16:56
|
Author: |
Tobias Haas |
Location: |
General |
Severity: |
Information |
Subject: |
Tunnel Commissioning Schedule for Week 11 |
|
|
Day |
Motion |
Vacuum |
EPS |
Other |
Monday |
Loop is up. AE continues tests on MC2 lib |
Loop up. AE investigates problem with ion pump controller |
Loop inactive |
|
Tuesday |
Loop is up. AE continues tests on MC2 lib |
Loop down. AE implements fix for ion pump controller |
Loop inactive |
|
Wednesday |
Loop down. AE adds ELMO and TECHNOSOFT |
Loop up for testing |
AE brings up loop |
|
Thursday |
Loop down. AE adds ELMO and TECHNOSOFT |
Loop up for testing |
AE brings up loop |
|
Friday |
Loop up for testing |
Loop up for testing |
Loop up for testing |
|
In addition it should be tried to have a so called "Happy Hour" every day from 0800 - 1000. During this time loops should be up if possible. Meaning that in the evening before leaving, developers bring loops back up. |