Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Joint Operation and Readiness Logbook, Contact: T.Haas, A. Violante, G. Wellenreuther, Page 5 of 30  Not logged in ELOG logo
ID Date Author Location Severitydown Subject
  59   03 Mar 2017, 16:46 Tobias HaasGeneralInformationMinutes of weekly SASE1 Readiness Meeting

 Here is the link to the minutes Minutes

  60   06 Mar 2017, 18:14 Andreas KochXTD2InformationPop-In II-45 Karabo test

6.3.2017, Karabo tests in XTD2 with Wajid, Andreas

1. Karabo all devices, all scenes working, with restrictions.

2. Power supply, motor, LED working.

3. Scenes tested: Motor scene and camera scene need additional parameters. AK will edit a list of suggestions, improvements and bugs.

4. Bugs, observations, details in improvement list.:

- Homing not working, tried also old parameter set from prototype crate.

- Encoder position not correct, dragging behind.

- Parameter for braking switch missing “ALowSpeed”.

  61   07 Mar 2017, 10:21 NEREA JARDONXTD9InformationXTD9-DPS

Dear all,

Tomorrow morning, 08th of March at 09.30h. I will be in the tunnel doing interlock tests in the DPS-XTD9 with Raúl.

Therefore I will need the connection of the TCP_Client in the Vacuum loop (just to let know Karaboo people).

I will post again when the PLC is available for Karaboo.

Thank you!

  62   07 Mar 2017, 11:09 Andreas KochXTD2InformationKarabo testing on Wednesday

As discussed with Wajid, I am availalbe tomorrow Wednesday the whole day to continue testing Karabo, motion loop. Wajid checked with Narea. I understand that there may be interruptions and that I have not first priority. Thanks, Andreas

  63   08 Mar 2017, 13:11 NEREA JARDONXTD9InformationInterlock tests DPS

The interlock test in XTD9-DPS has been done. The Vacuum PLC is again available for Karaboo.

  65   08 Mar 2017, 16:18 Andreas KochXTD2InformationKarabo testing

Here the link to the detailed list of issues: https://docs.xfel.eu/share/page/site/xfelwp74/document-details?nodeRef=workspace://SpacesStore/1733b825-e62e-47af-abba-fdef1ff9485d

  66   08 Mar 2017, 18:26 Alessandro SilenziGeneralInformationKarabo Deployment Documentation link

Url to the readthedocs documentation:

https://goo.gl/vsz9hu

  67   10 Mar 2017, 11:15 Tobias HaasGeneralInformationUpdate of Tunnel Component Priority List after SASE1 Readiness Meeting
Attachment 1: Components-Priority-list.xlsx
  68   10 Mar 2017, 11:18 Tobias HaasXHEXPInformationInstrument Component Priority List update after SASE1 Readiness Meeting
Attachment 1: 170310_Instrument_Components-Priority-list.xlsx
  69   10 Mar 2017, 11:34 Alessandro SilenziGeneralInformationLink to the redmin list of Tasks.

https://in.xfel.eu/redmine/projects/control-support/issues

Short Instructions:

- Add your task

- Select your work package

- Do NOT set the assignee

- Do NOT set the priority

 

  70   10 Mar 2017, 12:53 Tobias HaasGeneralInformationUpdate of Tunnel Component Priority List after SASE1 Readiness Meeting

Note that due to a bug in the elog the name appeared wrongly in my previous message. In general: Avoid underscores in the file names! 

Attachment 1: 170310-Tunnel-Components-Priority-list.xlsx
  71   10 Mar 2017, 14:56 Lewis BatchelorXTD2InformationCRL

The XTD2 CRL is now aligned and cabled.

Motor cabling is complete and ready for local testing. Encoder and PT100 cabling at rack to be completed by the middle of week 11.

  72   10 Mar 2017, 16:56 Tobias HaasGeneralInformationTunnel Commissioning Schedule for Week 11
Day Motion Vacuum EPS Other 
Monday Loop is up. AE continues tests on MC2 lib Loop up. AE investigates problem with ion pump controller Loop inactive  
Tuesday Loop is up. AE continues tests on MC2 lib Loop down. AE implements fix for ion pump controller Loop inactive  
Wednesday Loop down. AE adds ELMO and TECHNOSOFT Loop up for testing AE brings up loop  
Thursday Loop down. AE adds ELMO and TECHNOSOFT Loop up for testing AE brings up loop  
Friday Loop up for testing Loop up for testing Loop up for testing  

 

In addition it should be tried to have a so called "Happy Hour" every day from 0800 - 1000. During this time loops should be up if possible. Meaning that in the evening before leaving, developers bring loops back up.

  73   13 Mar 2017, 15:47 NEREA JARDONGeneralInformationVacuum and Motion down

Tomorrow, 14th of March, Vacuum and Motion loop will be down at least during morning due to technical reasons .

I will notify you when the works are finished.

  74   14 Mar 2017, 13:55 NEREA JARDONGeneralInformationVacuum and Motion down

Dear all,

Finally today the Vacuum and Motion will still running the hole day and I would have to stop them tomorrow morning. Before doing this operation, I will post an entry in the ELOG.

  75   15 Mar 2017, 08:13 Andreas KochXTD2InformationXTD2 Imagers

XTD2, IMAG.2694.T9, Pop-In II-45: Acceptance test of motor control under Karabo, done. Camera device needs further explanations and testing.

  76   15 Mar 2017, 11:31 NEREA JARDONGeneralInformationVacuum and Motion

Today Denis has to make some changes in the Vacuum and Motion hardware loop, therefore they would be down some time.

At least, we would try to keep the Vacuum loop up again for 3pm, therefore Valerii and Raul could use it with Karaboo.

  77   15 Mar 2017, 17:00 NEREA JARDONGeneralInformationVacuum and Motion

Vacumm and Motion are running again after the hardware changes.

  79   16 Mar 2017, 16:54 NEREA JARDONGeneralInformationFuses replacement

Dear all,

Tomorrow in the morning is needed to add some fuses in the PLCs crate, therefore Vacuum and Motion would be down for more or less one hour from 9am. I will notify you when the PLCs are available to work again.

Thank you,

  80   17 Mar 2017, 10:49 NEREA JARDONGeneralInformationLoops up

Dear all, Vacuum and Motion loops are running again.

Thank you,

ELOG V3.1.4-7c3fd00