  519   27 Apr 2018, 10:21 Adriano ViolanteGeneralInformationLasing SASE3INFO

As reported by the PRC (J. Gruenert)
during the operation meeting this morning,
  
  62   07 Mar 2017, 11:09 Andreas KochXTD2InformationKarabo testing on WednesdayAs discussed with Wajid, I am availalbe
tomorrow Wednesday the whole day to continue
testing Karabo, motion loop. Wajid checked
  
  64   08 Mar 2017, 16:08 Andreas KochXTD2ProblemKarabo testingEnd switch testing: the in-position end
switch stopped devices working, also stopped
gateway connection. Stroke of motor is not
  
  65   08 Mar 2017, 16:18 Andreas KochXTD2InformationKarabo testingHere the link to the detailed list of issues:
https://docs.xfel.eu/share/page/site/xfelwp74/document-details?nodeRef=workspace://SpacesStore/1733b825-e62e-47af-abba-fdef1ff9485d
  
  310   03 Jul 2017, 20:53 Alessandro SilenziGeneralInformationKarabo for SASE1 topic restartedHere attached the main SASE1 panel  07.png 
  366   22 Aug 2017, 09:48 Hugo Silva SantosGeneralProblemKarabo down in tunnelDear All,

We have a issue on the control
servers and we are already working on it...
  
  367   22 Aug 2017, 10:24 Hugo Silva SantosGeneralProblemKarabo down in tunnelDear All,

We solved the incident and the
services are running normally. We are still
  
  502   09 Apr 2018, 14:37 Adriano ViolanteGeneralInformationKarabo deployment datesFYI

Below
the E-Mail from Hugo Santos with the Karabo
  
  23   24 Jan 2017, 08:21 Tobias HaasGeneralInformationKarabo Names in Vacuum component listPost on behalf of Harald Sinn:
 for
the non-vacuum part of WP73 we have the following
  
  320   07 Jul 2017, 08:24 Wolfgang FreundGeneralInformationKarabo K-Mono-scenesI am working this morning on following
projects:

SA1_KMONO_SYSTEM
  
  8   07 Nov 2016, 19:15 Alessandro SilenziXTD2InformationKarabo Installation back to normal Karabo to PLC communication has been
tested successfully in the SA1 Vacuum installation.
in attachment:
 OK.pnginterlocked.pngbackToNormal.pngafteron.png 
  66   08 Mar 2017, 18:26 Alessandro SilenziGeneralInformationKarabo Deployment Documentation linkUrl to the readthedocs documentation:
  
  537   25 Jun 2018, 09:45 Hugo Silva SantosGeneralInformationKarabo 2.2.4 released (mainly for ITDM, AE and DET) + Deployment datesDear All,

I would like to inform that we
released last Friday (22.06) the Karabo 2.2.4
  
  505   13 Apr 2018, 07:50 Adriano ViolanteGeneralInformationKarabo 2.2.3 installationHi all, for your information below a message
from Chris Youngman concerning Karabo 2.2.3
installations in SASE3.
  
  368   22 Aug 2017, 10:53 Hugo Silva SantosGeneralInformationKarabo 2.1.15 in Test Dear All,

I would like to report that we
started today to test (internally in CAS)
  
  149   18 Apr 2017, 13:21 Tobias HaasGeneralInformationKW16 Accelerator Plans    
  124   10 Apr 2017, 12:31 Alessandro SilenziGeneralInformationKARABO Update maintainanceThe karabo services will be down for an
upgrade for an hour.
The access will resume at 13:30.
  
  358   08 Aug 2017, 13:10 wajid ehsanGeneralInformationKARABO 2.1.13As previously announced we will deploy
KARABO 2.1.13 in tunnel under topic
SA1. The system will go down in 10 mins.
  
  359   08 Aug 2017, 15:25 wajid ehsanGeneralInformationKARABO 2.1.13The system is up and running.

Regards,

Wajid 
  
  324   10 Jul 2017, 14:35 Wolfgang FreundXTD2InformationK-Mono controlDuring the first K-Mono test with Karabo
on Friday the first goniometer THETA1 (Elmo
controller) moved beyond the CW limit switch
  