ID Date Author Location Severity Subjectdown Text Attachments
  399   06 Oct 2017, 14:42 Janusz SzubaGeneralInformationOnline storage update on Monday 9th OctAfter today's discussion with WP75
group, we decided to postpone the update
of the online storage to the next Monday
  
  362   17 Aug 2017, 07:59 Krzysztof WronaXTD10InformationOffice network in XTD10Dear All,

In XTD10 there are now office network
ports available in each rack. These can be
  
  235   15 May 2017, 22:17 Thomas MichelatGeneralInformationOCD CAS Dear all,
The OCD number for tonight (15/05)
for the CAS group is 98053.
  
  231   12 May 2017, 15:37 NEREA JARDONGeneralInformationOCD AE GroupDear all,
The OCD numbers for this weekend
and today will be:
  
  234   15 May 2017, 11:32 NEREA JARDONGeneralInformationOCD AE GroupDear all,

The OCD AE numbers for the following
  
  248   18 May 2017, 15:30 NEREA JARDONGeneralInformationOCD AE GroupDear all,

The OCD AE numbers for the following
  
  161   21 Apr 2017, 15:22 NEREA JARDONGeneralInformationOCDDear all,
The service of On-call Duty will
be available from AE group during weekend
  
  348   28 Jul 2017, 11:10 Eric BoydXHEXPInformationNo Restricted Areas for Radiation CommissioningDesired parameters where reached for radiation
measurments of the SPB OPT and SPB EXP hutches.
Radiaiton could not be detected inside the
  
  353   03 Aug 2017, 10:52 Eric BoydXHEXPInformationNo Radiation Measurements in SASE 1 This weekDo to repairs that need to be made with
the cold compressor. We will be unable to
perform Radiation Hutch Commissioning for
  
  220   11 May 2017, 12:43 Alessandro SilenziGeneralInformationNew Deployment of Karabo for the SASE1 control machines.I will ramp down the system and bring it
back up during the lunch break after installing
the 
 download.sh 
  221   11 May 2017, 15:08 Alessandro SilenziGeneralInformationNew Deployment of Karabo for the SASE1 control machines.


   
        
            
  
  228   12 May 2017, 13:19 Alessandro SilenziGeneralInformationNew Deployment of Karabo for the SASE1 control machines.

    

       
            
  
  305   03 Jul 2017, 10:13 Krzysztof WronaXTD2InformationNetwork upgrade /information and problemThe upgrade of the switches is finished
to the extend that it allows Advanced Electronic
group to work on KMono (Nerea is informed)
  
  304   30 Jun 2017, 15:33 Janusz SzubaGeneralInformationNetwork and servers maintenanceAs discussed offline with NOC, Monday schedule
was already fixed and not movable to Tuesday.
Therefore, the network maintenance will take
  
  286   09 Jun 2017, 21:40 Gabriele GiovanettiXTD2ProblemMotor in errorCalled at 21.18 for SASE1_XTD2_IMGSR/MOTOR/Y
being in error.
Solved by pressing 'Reset' button
  
  86   23 Mar 2017, 10:06 NEREA JARDONGeneralInformationMotion upDear all, 
The Motion loop is up and running
again. 
  
  277   06 Jun 2017, 13:46 NEREA JARDONGeneralInformationMotion loop updateDear all,
We will start with the Motion loop
update. Will take us a little bit, around
  
  278   06 Jun 2017, 17:39 NEREA JARDONGeneralInformationMotion loop updateDear all,
The Motion loop is running again.
We have included today the Mc2motor devices
  
  280   07 Jun 2017, 12:00 NEREA JARDONGeneralInformationMotion loop updateDear all,
Due to some hardware changes needed
in Motion loop, we will last a little bit
  
  281   07 Jun 2017, 14:19 NEREA JARDONGeneralInformationMotion loop updateDear all,
Motion loop is up and running again,
now with all the PBLMs configured.
  