The upgrade of the switches is finished to the extend that it allows Advanced Electronic group to work on KMono (Nerea is informed)
However, during the upgrade of the network one switch got stuck and this is the switch in XTD2 tunnel. The IP network in the XTD2 tunnel is not reachable at the moment (Beckhoff loops are fine) and we are going top the tunnel soon.
|