ID |
Date |
Author |
Location |
Severity |
Subject |
337
|
18 Jul 2017, 10:57 |
Gerd Wellenreuther | General | Information | Tunnel access schedule updated |
Dear all,
an updated TAS is provided: https://docs.xfel.eu/share/page/site/PSC/wiki-page?title=Tunnel_access_schedules
There is potential access to the XTDs on next Tuesday + Wednesday (25+26.7.), as well as on Monday - Wednesday (31.7.-2.8.). Access will be organized by M. Dommach, since H. Sinn will be on vacation - so please send Martin your access request in time.
Cheers, Gerd |
336
|
14 Jul 2017, 18:46 |
Nicola Coppola | General | Information | Information AE OCD July 14--17 (till Monday 8:00) |
AE on call service:
Contact person:
Nicola Coppola
Phone
9 - 8040 |
335
|
14 Jul 2017, 13:17 |
Tobias Haas | General | Information | Status and plans after SASE1/3 Readiness Meeting |
General
- From now on progress with the SASE3 tunnel will be monitored in this meeting
FXE (A. Galler)
- Work is going on to be ready for the start of instrument commissioning of Sunday
- Currently the LPD movement is being tested
- Today the firmware for the vacuum interlock system is being deployed
SPB (M. Messerschmidt)
- All inputs needed for the vacuum interlocks can now be read out
- Karabo was migrated to version 2.1.12. This appears to have some fixes for reading out cameras, but the GUI becomes unusable after ca. 10 min. Hence the version had to be rolled back to 2.1.11. This generated a lot of extra work
- The test of the emergency off system was done this week. In preparation the PLCs were shut down to avoid damage. Bringing the system back was a significant effort. This should be getting less as more and more parameters are migrated to the firmware
- A partial test of the MPOD power supplies was done in preparation for the AGIPD commissioning. Unfortunately some Wiener power supplies still have an older firmware that appears to produce voltage spikes when ramping up. This could damage the detector. Hence a firmware upgrade is needed. But no Windows PC was available on the controls network. The respective card was dismounted and taken to the lab for upgrading by K.-E. Ballack
Tunnel Installations SASE3 (M. Dommach)
- A lot of installation work was carried out during the service period last week
- All Day 1 devices are in place
- A lot of missing connections were made (water, pressurized air)
- Calbing was done for the imagers
- The Solid Attenuator was assembled
- There are still two vacuum leaks, one of them is on top of the dump. This may have to wait for the next service period in August
- Focus during the next service period in August:
- Install missing connection pieces and bellows in order to close the entire vacuum
- Start bringing up Beckhoff loops with support from AE
- Bring up as many components as possible
- For the comments made by WP74/J. Grünert, see the respective log book entry today
Laser
- After a number of fixes and adjustments the AC parameters (Humidity/Temperature) are now according to specs
LPD
- LPD is now fully installed in FXE
- Work on the DAQ system starts next week
- Next step for AGIPD in HERA-S is to get the DAQ system working. After this the detector will be brought to SPB
- K. Wrona would like to cross check the configuration in HERA-S before this happens
AE
- Work focussed this week on getting the remaining SPB loops up, in particular loops 12 and 5
- For loop 12 a number of modules had to be taken out, modified and brought back. This relates to the operation of so-called SMARAGD motors
- Originally it was planned to test the vacuum interlock system in SPB first. This requires inter-loop communication and there are still unused loops in SPB
- Due to the problems with loop 12, it was decided to do the tests in FXE.
- The firmware for the FXE interlock should be deplyed today
- A meeting was held with MPS to clarify the interface between XFEL and MPS sind the MPS system cannot distinguish between the branch beam lines. This can now be handled by logic inside the PLC
- AE is preparing for the support of SASE3 during the next service period
CAS
- For more details see the detailed slides presented by S. Brockhauser during the meeting
|
334
|
14 Jul 2017, 12:44 |
Martin Dommach | XTD9 | Problem | Fast Valves in XTD9 |
Dear all,
the fast valves in XTD9 were causing some trouble. From time to time they collect some electrical noise what triggers the valve. The pressure reading on the valve controller then shows oscillations of up to 10^-5 mbar, while the pressure around the fast valve gauges in the beamline is in the 10^-9 mbar range.
To operate the beamline in the meantime I have opened and disabled both fast valves.
This needs further investigation on the service day next wednesday.
Best regards,
Martin |
333
|
14 Jul 2017, 10:50 |
Gerd Wellenreuther | General | Information | TAS updated |
Dear all,
the Tunnel Access Schedule has been update - potential access has been shifted from Wednesday the 19.7. to Tuesday the 18.7. Should you need this access, please inform Harald Sinn!
https://docs.xfel.eu/share/page/site/PSC/wiki-page?title=Tunnel_access_schedules
Cheers, Gerd |
332
|
14 Jul 2017, 09:31 |
Jan Grünert | General | Information | WP74 SASE1/3 readiness status and outlook |
SASE1 / SASE3 readiness --- WP74
2017-07-14
SASE1:
- commissioning of Kmono started yesterday at 10h for some hours
- Kmono will be used for undulator commissioning as soon as Kmono is commissioned itself, and machine is ready for this
- Support to SASE tuning given to machine (ongoing)
- Maybe today: support during SASE gain studies
- During last week (service week) : GLT-Anbindung XTD2 established
SASE3:
- During last week shutdown :
- progress on DP installation, XGM cabling almost done, much imager and timing cabling done
- When XTD10 is closed (as now) we currently cannot do much because there is no PLC loop in SASE3.
- Non-Beckhoff technical commissioning started (e.g. some progress on MPOD HV-power supply)
- WP74 must do a lot of technical commissioning in XTD10. Our work is by far not done when all our vacuum screws are tightened. There are different WP74 components in XTD10 than in SASE1 (not just a simple copy). WP74 requires the Beckhoff loops for tech. commissioning.
- Alignment of DP „islands“ to be done in next shutdown.
- Planned for next shutdown: installation of PES in XTD10, finishing of cabling
|
331
|
13 Jul 2017, 18:15 |
Nicola Coppola | General | Information | Information AE OCD July 13 |
AE on call service:
Contact person:
Nicola Coppola
Phone
9 - 8040 |
330
|
13 Jul 2017, 15:45 |
Gerd Wellenreuther | General | Information | Tunnel access schedule updated |
Dear all,
I updated and extended the tunnel access schedule (TAS) until the 24th of July. According to Harald, there will be an opportunity to access XTD next Wednesday. Please keep him informed should you require access.
https://docs.xfel.eu/share/page/site/PSC/wiki-page?title=Tunnel_access_schedules&listViewLinkBack=true
Cheers, Gerd |
329
|
13 Jul 2017, 10:27 |
NEREA JARDON | XTD9 | Information | Vacuum Loop in XTD9 |
Dear all,
One power supply needs to be changed in SASE1 XTD9 rack 1.12 tomorrow and it's related to the Vacuum loop. Denis Finze will do this change tomorrow morning, but we have to make sure before that we have all the equipments after this rack 1.12 in safe state (most concerning part, XGM in XTD9). Please, could you make sure that everything it's ok tomorrow at 10am? However I will send an email now to the involved people.
Thank you and best regards, |
328
|
13 Jul 2017, 07:46 |
NEREA JARDON | General | Information | Motion loop update |
Motion loop is up and running again, as I have said, you will not have communicatin with equipments of Racks 1.18 till Denis finishes with hardware changes.
Thank you,
NEREA JARDON wrote: |
Dear all,
Tomorrow morning we will do an update in the Motion loop due to some hardware changes requested in Rack number 1.18. You might will not have communication with this rack during whole day, because they will be doing local test after changing the hardware..
Thank you and bests,
|
|
327
|
12 Jul 2017, 15:15 |
NEREA JARDON | General | Information | Motion loop update |
Dear all,
Tomorrow morning we will do an update in the Motion loop due to some hardware changes requested in Rack number 1.18. You might will not have communication with this rack during whole day, because they will be doing local test after changing the hardware..
Thank you and bests, |
326
|
12 Jul 2017, 10:45 |
Tobias Haas | General | Information | Status and Plans after 09:30 meeting |
XTDs
- Mechanical operation of KMONO is prepared. Work is now ongoing on optimizing the scenes in KARABO
- Data from the SR imager that is needed for scanning the undulator gaps needs to be available in DOOCS. This is prepared.
- Once the machine can provide beam, one hour for KMONO first commissioning has already been agreed
SPB
- Test of the Emergency Power Off should take place this afternoon. PLCs will be shut down and hence parameters have to be put badk
- N. Jardon will put as much information as she can into the firmware do reduce the work of putting back the parameters
- However, in FXE it was found that the Emergency Off buttons only act on the interlock and not on the electrical systems. The situation in SPB is probably similar
- Work is ongoing on technical commissioning but there are still key components physically missing (e.g. CSS and Sample Environment)
- Vacuum interlock is not yet implemented as it is still waiting for a number of components in loops 12 and 5
FXE
- JJ XRay worked last week and now the vacuum has to be re-established. Pump down should start soon but there was still one leak.
- Vacuum interlock definition is ready and it will be implemented by AE today
- LPD was installed. Currently 2 out of 4 super modules are installed. The other two should come early next week
DAQ
- Cabling and preparations are ongoing
- Tests should start early next week
AE
- Currently working on changes in loop 12 for SPB
CAS
- Currently working on bug fixes. Some of these bugs are probably responsible for the system not updating vacuum info for 30 minutes
- Deployment should happen this or next week
- There appears to be some confusion/communication issue as to what version of KARABO is installed where.
- It needs to be ensured that the startup of the next photon commissioning period goes smoothly
|
325
|
10 Jul 2017, 15:23 |
NEREA JARDON | General | Information | Motion loop update |
Dear all,
We will do an update of the Motion Loop in the next 15minutes in order to fix one analog signal related to the KMONO.
Thank you |
324
|
10 Jul 2017, 14:35 |
Wolfgang Freund | XTD2 | Information | K-Mono control |
During the first K-Mono test with Karabo on Friday the first goniometer THETA1 (Elmo controller) moved beyond the CW limit switch and stopped at the CCW switch. So the goniometer was trapped between both switches with a movement range of a few degrees. Movement of encoder and motor were opposite. This behaviour is not understood and under investigation.
Now the goniometer is back within the nominal range and movement of motor and encoder reading is consistent. CCW limit switch at 117.5° / CW limit switch at ~182°. |
323
|
10 Jul 2017, 10:31 |
Tobias Haas | General | Information | Status and Plans after 09:30 meeting |
General
- Interlock was set in the injector last Friday
- All shifts were cancelled for the weekend
- Startup today and interlocks set in XTD10
- It is still the aim to have photons by Wednesday (info from XFEL runn coor at 10:30)
- XTD9 remains open until Friday afternoon
- Tests of the emergency off buttons by TS (Thorsten Schön/TS) need to be performed in the instrument hutches. This is currently scheduled for Wednesday and should be done this week but requires careful coordination in order not to break equipment and disrupt commissioning
XTDs
- Progress on KMONO was unfortunately not reported as W. Freund was involved in tunnel search during the meeting. A. Koch shall ask W. Freund to put an update in the log book
- A lot of work was done on XTD10 installations last week, e. g. cooling water connections, gas attenuator installation
- Unfortunately, there is still a vacuum leak on top of the XSDU2 dump
- Work shall continue during the next break week in August and during individual service day if the opportunity is given
SPB
- Loops 5 & 12 are needed for the vacuum interlock. Hence cross-loop communication is needed. This requires additional testing
- Loop 5 is deployed but misses 2 modules that are being modified
- Loop 12 is not deployed and also requires that a few modules be modified
- The goal is to get the interlock up during this week
FXE
- The vacuum interlook will be deployed once the inter-loop communicationn has been tested in FXE
- JJ worked all of last week to
- Fix a leak in a bellow
- Exchange one pump controller
- Rewire motors to conform to XFEL standards
- Install diamond screens in the imagers
- LPD was installed
- There is still confusion about the CRL alignment: Are individual lenses misaligned or the whole stack? This information is needed to obtain the next security level clearance from D3
AE
- AE will not attend the next meeting on Wednesday since there is a parallel event with MPS on the details of the interlock connections, in particular how to deal with the fast valves in the instrument hutches
CAS/ITDM
- ITDM is currently working with highest priority on DAQ for LPD. Once this is integrated, DAQ for the tunnels will follow
- Work on LPD DAQ is done in a separate KARABO "Topic" in order not to disrupt other work
- There are ocnfusing statements of whether DAQ can deal with more than one topic per SASE in the long run...
Important topics for this week
- Perform emergency off tests
- Get LPD DAQ going
- Integrate vacuum interlocks
- Make KMONO available for SASE tuning
|
Draft
|
10 Jul 2017, 10:26 |
Tobias Haas | General | Information | Status and Plans after 09:30 meeting |
|
321
|
07 Jul 2017, 13:24 |
NEREA JARDON | General | Information | EPS loop |
Dear all,
We need to update EPS SASE1 loop in order to finish the interlock communication for the experiments. I will do the update around 14h.
Thank you! |
320
|
07 Jul 2017, 08:24 |
Wolfgang Freund | General | Information | Karabo K-Mono-scenes |
I am working this morning on following projects:
SA1_KMONO_SYSTEM
SA1_XTD2_KMONO
SA1_XTD2_IMGSR
SA1_XTD2_FLT
Please don't save these projects ! |
319
|
06 Jul 2017, 15:03 |
NEREA JARDON | General | Information | Vacuum Loop |
Vacuum Loop is running again.
Thank you!
NEREA JARDON wrote: |
Dear all,
Sorry for the short notice, but we have to do an update of the Vacuum loop in order to get the neecssary interlock for the experiments done. I will contact know WP74 and Vacuum group so they can be awared about their equipments.
Thank you,
|
|
318
|
06 Jul 2017, 12:49 |
NEREA JARDON | General | Information | Vacuum Loop |
Dear all,
Sorry for the short notice, but we have to do an update of the Vacuum loop in order to get the neecssary interlock for the experiments done. I will contact know WP74 and Vacuum group so they can be awared about their equipments.
Thank you, |