Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Joint Operation and Readiness Logbook, Contact: T.Haas, A. Violante, G. Wellenreuther, Page 11 of 30  Not logged in ELOG logo
ID Date Author Locationdown Severity Subject Text Attachments
  119   07 Apr 2017, 17:54 Tobias FreyermuthGeneralFeedbackHotfix for all loops (VAC, MOV, EPS) deployed

    

       
            
  
  121   10 Apr 2017, 09:36 NEREA JARDONGeneralInformationVacuum LoopDear all,
I will update the Vacuum loop in
order to add the XGM XTD9 into it. It will
  
  122   10 Apr 2017, 10:09 NEREA JARDONGeneralInformationVacuum LoopDear all,
The Vacuum loop is running again,
now with XGM XTD9 included. We will be testing
  
  123   10 Apr 2017, 10:47 Tobias HaasGeneralInformationSchedule after 09:30 MeetingTunnel
Open.
  
  124   10 Apr 2017, 12:31 Alessandro SilenziGeneralInformationKARABO Update maintainanceThe karabo services will be down for an
upgrade for an hour.
The access will resume at 13:30.
  
  125   10 Apr 2017, 18:13 NEREA JARDONGeneralInformationVacuum LoopDear all,
Right now both XGMs are into the
loop and would be running. The loop must
  
  126   10 Apr 2017, 19:19 Tobias FreyermuthGeneralInformationupdate of the EPS loopDear cllougues,
 


  
  127   10 Apr 2017, 20:05 NEREA JARDONGeneralInformationEPS & MotionDear all,
EPS and Motion loop have been updated
to the last framework version with the last
  
  128   11 Apr 2017, 11:48 NEREA JARDONGeneralInformationVacuum LoopDear all,
Vacuum loop is up and running, we
would wait till Raul check the interlock
  
  129   11 Apr 2017, 12:51 Tobias HaasGeneralInformationStatus after 0930 meetingTunnel   
  130   11 Apr 2017, 13:24 NEREA JARDONGeneralInformationMotion LoopDear all,
Motion loop is running again with
the last update (names for PSLIT and LVDT
  
  131   11 Apr 2017, 13:32 NEREA JARDONGeneralInformationMotion loopDear all,
Sorry for disturbing again, I will
do a small update to put one missing coupler
  
  132   11 Apr 2017, 13:48 Alessandro SilenziGeneralInformationScript to install the latest karaboPlease find in attachment the dowload bash
script for the latest Karabo.
if your system has a "karabo"
 download.sh 
  134   11 Apr 2017, 15:38 NEREA JARDONGeneralInformationEPS loopDear all,
The EPS loop would be stopped, in
order to correct some issues with the hardware
  
  139   12 Apr 2017, 09:16 Andreas KochGeneralInformationImager status







Normal
0
  
  140   12 Apr 2017, 12:52 Tobias HaasGeneralInformationStatus and plans after 09:30 meeting Tunnel
Closed.
  
  141   13 Apr 2017, 10:15 Alessandro SilenziGeneralProblemEtherCAT loop broken for Vacuum loopThe EtherCAT loop for the vacuum PLC is
interrupted at crate 1.6 (XTD2).
This triggered all Beckhoff Terminals 
  
  142   13 Apr 2017, 12:07 Tobias HaasGeneralInformationStatus and Plans after 09:30 meeting Tunnel
Closed until approx 1300, Open over the Easter
  
  143   13 Apr 2017, 13:19 Tobias HaasGeneralInformationStatus Interlock Tests TodayRadiation Interlock Tests are finished.
Tunnels XTD9 and XTD10 up to the fence at
the dump can be accessed right now. Magnet
  
  144   13 Apr 2017, 14:09 Tobias HaasGeneralInformationInterlock tests are finished in Northern FanAll northern tunnels XTD2/4/9/10 are fully
accessible again! 
  
ELOG V3.1.4-7c3fd00