Technical integration and coordination SASE1 Status and SASE3 Readiness
  Joint Operation and Readiness Logbook, Contact: T.Haas, A. Violante, G. Wellenreuther, Page 1 of 30  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Location Severity Subjectdown Text Attachments
  51   24 Feb 2017, 15:14 Martin DommachXTD9Informationwork on FXE distribution mirror chamberDear all,
on Monday, 27th in the morning we
will start with preparation work for the
  
  52   24 Feb 2017, 15:15 Martin DommachXTD9Informationwork on FXE distribution mirror chamberDear all,
on Monday, 27th in the morning we
will start with preparation work for the
  
  126   10 Apr 2017, 19:19 Tobias FreyermuthGeneralInformationupdate of the EPS loopDear cllougues,
 


  
  4   03 Nov 2016, 17:00 Sabine CunisXTD2Informationoverview of required racksjust for reference ... here are pictures
and schematics of the racks which are involved
in the current commissioning.
 VCCT_Rack_1p06_b.jpgVCCT_Rack_1p07_b.jpg 
  13   02 Dec 2016, 11:43 Sabine CunisXTD2Informationnew components list please find the new (extended)
components list under the old link
given in the minutes  http://tinyurl.com/zn7otsa
  
  499   04 Apr 2018, 17:46 Janusz SzubaGeneralInformationmaintenance of the online storage systemOn Friday, 6.04, there will be a maintenance
of the online storage system. This will tackle
the issues we had just before the last user
  
  172   26 Apr 2017, 10:51 Jan GrünertXTD2ProblemkaraboGUI issues - during cycling of PLC loop (shutdown and restart) - effects on XGM XTD2 and XTD9
Problems described in detail below
(this entire procedure takes way too much
of our time, effectively still nearly 2 hours!):

Nerea/AE
 45.png49.png10.png 
  217   10 May 2017, 13:03 Jan GrünertXTD2Problemkarabo Beckhoff link not reestablished for SASE1 tunnel VAC loopCould somebody please re-establish the
karabo controls of the SASE1 tunnel VAC loop
(connection with Beckhoff server) ?
  
  218   10 May 2017, 13:07 Jan GrünertXTD2Problemkarabo Beckhoff link not reestablished for SASE1 tunnel VAC loop

    

       
            
  
  464   31 Jan 2018, 10:06 ITDM AdminGeneralInformationexflgateway migrationToday late in the evening (~22:00), the
exflgateway will be migrated to a new hardware.
All users will be logged out before migration
  
  239   16 May 2017, 22:54 Jan GrünertXTD2Informationcycling of SASE1 tunnel VAC loop (if needed)If the recycling of the VAC loop for XTD2+9
is required as I understand from AE, 
tomorrow would be a good time because
  
  309   03 Jul 2017, 18:22 Janusz SzubaGeneralInformationcontrol servers maintenanceAll control servers, brokers, dl and finally
gateway were updated and restarted.
  
  462   29 Jan 2018, 10:32 Martin DommachXTD10Informationclosing of XTD10 shifted to WednesdayDear all,

the closing of the XTD10 tunnel
is shifted to Wednesday (January 31st.) at
  
  106   05 Apr 2017, 16:24 Nicola CoppolaXTD9Informationalio monocromator teststest finshed.
both stages were moved.
voltage value and position read out
  
  61   07 Mar 2017, 10:21 NEREA JARDONXTD9InformationXTD9-DPSDear all,
Tomorrow morning, 08th of March at
09.30h. I will be in the tunnel doing interlock
  
  198   02 May 2017, 22:27 Jan GrünertXTD2ProblemXTD9 vacuum now ok, but not in XTD2: turbos on XGM@XTD2 still in ERRORWajid and Leonce from CAS have managed
to get us the karabo controls back.
We have now put the XGM@XTD9 back
  
  179   26 Apr 2017, 19:21 Raúl Villanueva-GuerreroXTD9FeedbackXTD9 Complete Gas Section (DPS-XGM-DPS) Isolation Interlock tested - SUCCESFUL Dear all,
Finally the tests were run with the
expected results: Pressure thresholds for
  
  168   25 Apr 2017, 13:49 Raúl Villanueva-GuerreroXTD9InformationXTD9 Complete Gas Section (DPS-XGM-DPS) Isolation Interlock tested - Not Working (yet) After some minor issues, the first
test has been done today and the interlock
wasn´t triggered despite the conditions
  
  75   15 Mar 2017, 08:13 Andreas KochXTD2InformationXTD2 ImagersXTD2, IMAG.2694.T9, Pop-In II-45: Acceptance
test of motor control under Karabo, done.
Camera device needs further explanations
  
  180   27 Apr 2017, 07:04 Raúl Villanueva-GuerreroXTD2ProblemXTD2 Differential Pumping completely OUT OF OPERATION! Dear all,
 
I just checked the Karabo Scene for
  