Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Joint Operation and Readiness Logbook, Contact: T.Haas, A. Violante, G. Wellenreuther, Page 1 of 30  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Locationdown Severity Subject Text Attachments
  32   02 Feb 2017, 14:29 Richard BeanXTD9InformationSPB/SFX updates to component tableTable updated with status of SPB/SFX devices
at end of XTD9 in preparation for SASE1 readiness
meeting on 03.02.17
 Components-XTD2-9.xlsx 
  51   24 Feb 2017, 15:14 Martin DommachXTD9Informationwork on FXE distribution mirror chamberDear all,
on Monday, 27th in the morning we
will start with preparation work for the
  
  52   24 Feb 2017, 15:15 Martin DommachXTD9Informationwork on FXE distribution mirror chamberDear all,
on Monday, 27th in the morning we
will start with preparation work for the
  
  61   07 Mar 2017, 10:21 NEREA JARDONXTD9InformationXTD9-DPSDear all,
Tomorrow morning, 08th of March at
09.30h. I will be in the tunnel doing interlock
  
  63   08 Mar 2017, 13:11 NEREA JARDONXTD9InformationInterlock tests DPSThe interlock test in XTD9-DPS has been
done. The Vacuum PLC is again available for
Karaboo.
  
  104   05 Apr 2017, 14:14 Andreas KochXTD9FeedbackPlease inform on rack status 1.18The rack 1.18 in XTD9 is not operational
at the moment because Nicola is working on
it. Nerea, Tobias or others let me know when
  
  106   05 Apr 2017, 16:24 Nicola CoppolaXTD9Informationalio monocromator teststest finshed.
both stages were moved.
voltage value and position read out
  
  151   19 Apr 2017, 11:47 NEREA JARDONXTD9InformationMotion loopDear all,
Today from 13:30h  Mahadi and
Natalia will be doing local tests in the
  
  156   21 Apr 2017, 12:28 Raśl Villanueva-GuerreroXTD9ProblemFAILED - Interlock test of the whole gas section in XTD9 - NOT SUCCESSFUL Due to problems and lack of support
of CAS for accessing the devices in XTD9
tunnel through KARABO we couldn´t run
  
  157   21 Apr 2017, 13:23 Raśl Villanueva-GuerreroXTD9ProblemFAILED - Interlock test of the whole gas section in XTD9 - NOT SUCCESSFUL

    

       
            
  
  158   21 Apr 2017, 13:35 Raśl Villanueva-GuerreroXTD9ProblemFAILED - Interlock test of the whole gas section in XTD9 - NOT SUCCESSFUL


   
        
            
  
  160   21 Apr 2017, 14:36 Tobias FreyermuthXTD9InformationSASE EPS RACK 1.14 disconnectWe have to disconnect the EPS crate in
RACK 1.14 in order to check the interface
to the MPS.
  
  163   21 Apr 2017, 15:30 Tobias FreyermuthXTD9FeedbackSASE EPS RACK 1.14 connected




The
EPS-loop is now complete again.
  
  168   25 Apr 2017, 13:49 Raśl Villanueva-GuerreroXTD9InformationXTD9 Complete Gas Section (DPS-XGM-DPS) Isolation Interlock tested - Not Working (yet) After some minor issues, the first
test has been done today and the interlock
wasn´t triggered despite the conditions
  
  178   26 Apr 2017, 18:34 Jan GrünertXTD9ProblemSA1-VAC loop down (only XTD9) and later restartedSince around 17h30 all XTD9 VAC loop is
in error. It came back in karabo around 17h50.
XTD2 not affected.
  
  179   26 Apr 2017, 19:21 Raśl Villanueva-GuerreroXTD9FeedbackXTD9 Complete Gas Section (DPS-XGM-DPS) Isolation Interlock tested - SUCCESFUL Dear all,
Finally the tests were run with the
expected results: Pressure thresholds for
  
  194   02 May 2017, 10:05 Tobias FreyermuthXTD9InformationPBLM Motor drivers in PreOPHi all,
 
due to ongoing tests with the PBLM
  
  195   02 May 2017, 10:56 Harald SinnXTD9InformationStatus of Vacuum System XTD2: All gate valves are now OK (not interlocked)
after re-instantiating and re-setting the
XGM_DP_OK. 
  
  200   03 May 2017, 11:15 Raśl Villanueva-GuerreroXTD9InformationCorrection to plans for Vacuum (e-log message n3. 199) in XTD9 Dear all,
it seems that this morning was somehow
a misunderstanding. The XTD9 Gas Section
  
  204   03 May 2017, 14:38 Raśl Villanueva-GuerreroXTD9FeedbackGas Section Interlock on XTD9 - Shut off valve also operative Dear all,
during the test run today by our
colleagues of WP74, the interlock condition
 45.png 
ELOG V3.1.4-7c3fd00