66
|
08 May 2025, 04:56 |
Raphael de Wijn | SPB | Shift summary | Shift summary in-house beamtime night 1
X-ray delivery
- 9.3 keV, 1.7-2.2 mJ pulse energy, up to 202 pulses at 0.5MHz
Optical laser delivery
- NS illumination
- PP laser not available as we could not change master experiment
Achievements/Observations
- Collected SFX lysozyme data at two different detector distances
- Collected SFX metmyoglobin as positive control
Issues
|
67
|
09 May 2025, 06:59 |
Raphael de Wijn | SPB | Shift summary |
Shift summary in-house night 2
X-ray delivery
- 9.3 keV, 2.2-2.5 mJ pulse energy, up to 202 pulses at 0.5MHz, high slope across the train
Optical laser delivery
- NS illumination
- PP laser not used
Achievements/Observations
Issues
- Issues with our mixers, need to be solved during the day,
|
68
|
13 May 2025, 07:00 |
Raphael de Wijn | SPB | Experiment summary | End of in-house beamtime
X-ray delivery
- 9.3 keV, 2.2-2.5 mJ pulse energy, up to 202 pulses at 0.5MHz, stable over the week
Optical laser delivery
- PP laser used but several issues with experiment master switch
Achievements/Observations
- Collected SFX data from deoxymyoglobin crystals mixed with an oxygen cage compound before illumination with the PP laser to release oxygen
|
71
|
22 May 2025, 23:29 |
Raphael de Wijn | SPB | Shift summary | Staff: @**Katerina Doerner** @**Elizabeth Galtry** @**Raphael de Wijn** @**Mohammad Vakili** @**Chan Kim** @**Diogo Melo**
**X-ray delivery**
- 9.34 keV, 1400-1600 uJ pulse energy
**Optical laser delivery**
- illumination laser
**Achievements/Observations**
- Collected some NQO1 data
- Had some hours to play around with HV with the old device. We observed a few things:
- Without HV we could get close to 10 hz, but with jitter of +/-3hz
- With HV at 1.2V, we clearly saw a strong effect on the droplet hz, could go from 10 Hz to 20 Hz, but the problem of the jitter remains, this looks like the main issue have the droplets frequency under control
- We observed that with water the diode signal was one single peak, whereas with sample there were a few peaks for the whole droplet width, we tested and it indeed seems that the crystals in the droplets either refracted away or absorbed a portion of the beam to yield that diode laser peak profile... |
11
|
06 Feb 2025, 23:02 |
Peter Zalden | FXE | Issue | We observed a damage spot on the SA1 FEL imager. It moves with the target holder, but not sure if its damage on the optical mirror or on the target itself.
This issue is not critical, but can become problematic in case one wants to determine beam size or state of optics (ATT or CRLs) upstream. |
Attachment 1: 2025-02-06-230215_634787810_exflqr51474.png
|
|
14
|
07 Feb 2025, 05:56 |
Peter Zalden | FXE | Shift summary | Preparation for user expt #7944
X-ray delivery
- since pulses (10 Hz) at 9.3 keV, 3 mJ
- Pointing stability 55 um RMS in the horizontal plane on FXE PI, which is lower as compared to earlier values
Achievements/Observations
- Aligned xrays into FXE vacuum/cryo setup
- Performed ice depositions in-situ and characterized by Xray
Handover
- Beam transport to SPB and 11 keV recovered
- We left Hirex inserted during FXE operation, but closed the GH2 shutter. It is still closed.
Issues
- XTD2 crl lens3x motor moving in wrong direction and already past all limits. Created ticket with EEE (no DOC available) #216784. Lens3x is not needed for the ongoing experiment, but the situation is potentially dangerous.
|
16
|
08 Feb 2025, 06:25 |
Peter Zalden | FXE | Shift summary | Preparation for user expt #7944
X-ray delivery
- Since pulses (10 Hz) at 9.3 keV, 2.2 mJ
- Again similar low pointing noise
Achievements/Observations
- Confirmed amorphous ice deposition and -removal
- Optimized scattering geometry
- Calibrated detector position
Handover
- Beam transport to SPB and 11 keV recovered by BKR
|
18
|
09 Feb 2025, 06:35 |
Peter Zalden | FXE | Shift summary | Preparation for user expt #7944
X-ray delivery
- Single pulses (10 Hz) at 9.3 keV, 2.3 mJ
- Again similar low pointing noise
Achievements/Observations
- Tested different substrates for deposition of ice
- Optimized ice deposition conditions
- Recorded example data to prepare analysis scripts
Handover
- Beam transport to SPB and 11 keV requested from BKR at 6:30h
|
27
|
21 Feb 2025, 23:21 |
Mohammad Vakili | SPB | Shift summary | SPB/SFX shift summary user experiment 8039
**X-ray delivery**
-15 keV with Hirex monitoring, 0.5 mJ/pulse, 202 pulses/train at 0.56 MHz pulse repetition rate
**Optical laser delivery**
-810 nm laser for illumination
**Achievements/Observations**
- Collected sample data for ca. 2h 15min using a DFFN
- XTD2 CRLs optimized and realigned
- Offset mirror M1/M2 optimized for 15 keV
- Repositioned the illumination fiber inside IRU chamber
- Germanium blades were installed for the IRU_Slit_4 (top and bottom)
**Issues**
- PP laser alignment could not be pursued as hexapod had to be repositioned first (interaction region was too close to exit cone)
|
32
|
01 Mar 2025, 11:53 |
Martin Dommach | PRC | Issue | Due to issues SCS has with pulses from SASE1 lasing in SASE3 and destroying, or at least modifying, their sample, it was decided to change the order in the RF configuration to have SASE3 pulses before SASE1. The change will be done at 12 pm, agreed with FXE.
The impact for SPB will be the loss a few pulses (5%), I contacted Richard to get confirmation that this is ok for SPB.
Best regards,
Martin (PRC week 9) |
81
|
16 Jun 2025, 07:14 |
Lena Worbs | SPB | Shift summary | SPB/SFX shift summary inhouse experiment 9456, shift 15./16.06.2025
**X-ray delivery**
- 6.51 keV, 1.3-1.4 mJ 352 pulses/train at 1.1MHz rep rate
**Optical laser delivery**
- none
**Achievements/Observations**
- collected data on gold spheres from the double flow nozzle
- collected data on gold spheres and encapsulin together from the double flow nozzle
**Issues**
- low hit rates |
82
|
17 Jun 2025, 07:08 |
Lena Worbs | SPB | Experiment summary | SPB/SFX shift summary inhouse experiment 9456, shift 16./17.06.2025
**X-ray delivery**
- 6.51 keV, 1.4 mJ, 352 pulses/train at 1.1MHz rep rate
**Optical laser delivery**
- none
**Achievements/Observations**
- collected data on Ag cubes with two x-ray beam profiles
- tunnel CRL (Arm 1) increased intensity in focus by 30-40% (max intensity in NKB_focusing scene)
- collected data on gold spheres and encapsulin together from the double flow nozzle
**Issues**
- beam trip due to vacuum spike in OH (PSLIT section) |
70
|
21 May 2025, 22:41 |
Konstantin Kharitonov | SPB | Shift summary | Staff: @**Katerina Doerner** @**Elizabeth Galtry** @**Raphael de Wijn** @**Mohammad Vakili** @**Chan Kim** @**Konstantin Kharitonov**
**X-ray delivery**
- 9.3 keV, 1400-1600 uJ pulse energy
**Optical laser delivery**
- No
**Achievements/Observations**
- Found working nozzle, started injection, observed droplets, performed two parameter scans for HV
- We could not reach the stable droplet frequency around 10 Hz and were ~ fluctuating 9-17 Hz
- We prepaired 3 more capillaries with powder for distance calibration and left them in D12
**Issues**
- Some nozzles were leaking
**Instrument status**
- AGIPD HV off.
- AGIPD gate valve closed and pinned.
- Attenuators set to thickest diamond.
- Vacuum valves closed.
- AGIPD breaks engadged
- ns Lasers off
- HIREX is handled by FXE, but maybe better to check in the morning
- AGIPD IS REMOVED FROM DAQ TO MEASURE DROPLET TRAINS DON'T FORGET TO PUT IT BACK |
73
|
24 May 2025, 23:06 |
Konstantin Kharitonov | SPB | Shift summary | Staff: @**Katerina Doerner** @**Elizabeth Galtry** @**Raphael de Wijn** @**Mohammad Vakili** @**Chan Kim** @**Diogo Melo** @**Konstantin Kharitonov**
**X-ray delivery**
- 9.34 keV, 1200-1400 uJ pulse energy
**Optical laser delivery**
- illumination laser
**Achievements/Observations**
- Managed to synchronize droplets for some runs, resulting in high hit, averaging rate ~ 8-10% and spiking up to 20%.
**Issues**
- Synchronization and stable delivery are challenging
- Beam was down several times
**Instrument status**
- AGIPD HV off.
- AGIPD gate valve closed and pinned.
- Attenuators set to thickest diamond.
- Vacuum valves closed.
- AGIPD breaks engadged
- ns Lasers off
- HIREX is handled by FXE, but maybe better to check in the morning
- PAM interlock on and shutter open
- Left the gas at 5 for 0 flow (and no noise) from GP13 flowmeter D, during the night it was at 0, and in the morning it was filled with air... Tonight we leave it this way and in the morning let us know if it worked or not. |
74
|
25 May 2025, 23:57 |
Konstantin Kharitonov | SPB | Shift summary | **X-ray delivery**
- 9.34 keV, 1200-1400 uJ pulse energy
**Optical laser delivery**
- illumination laser
**Achievements/Observations**
- Measuired multiple runs data with synchronization and high hit rate
- We have at least two devices tested and ready for tomorrow
|
55
|
24 Apr 2025, 08:42 |
Konopkova Zuzana | HED | Issue | self-seeding level in SA2 is currently very low (~100 uJ, about 50% in the pedestal), need more information on how to proceed - is there any chance to improve the seeding, or should we consider going to sase operation. |
6
|
31 Jan 2025, 06:28 |
Jörg Hallmann | MID | Shift summary |
- Alignment of KB mirrors: focused beam H150-200nm x V300-350nm. Characterization of focused beam with wire scan.
- Installed ePIX table and ePIX. Thorlabs server is not running, needs to be fixed by controls during the morning shift
- Aligned rotation center of SSRY and put the beam into it. Moved alignment pin down by 10mm and put protecting cover on it.
- Aligned DES spectrometer crystal (using YAG) to 9keV.
- Checked CRL2 focusing with 9keV. Smallest is 9um (with bender adjust).
- Alexey played with Mono further, second reflection not found. Problem found with actuator.
- Tested FF data. Seems to be good.
-
|
28
|
25 Feb 2025, 02:41 |
Jayanath Koliyadu | SPB | Shift summary | X-ray delivery
-15 keV with Hirex monitoring, 0.5 mJ/pulse, 202 pulses/train at 0.56 MHz pulse repetition rate
Optical laser delivery
- 810 nm laser for illumination
-PP laser for excitation, 590 nm, 51 pulses, 141 kHz
Achievements/Observations
- Collected high resolution time resolved data
- Collected Tve_CPC500f and Tve_CPC1n data and completed Tve_CPC20p
|
54
|
24 Apr 2025, 06:56 |
Jayanath Koliyadu | SPB | Shift summary | X-ray delivery:
10 keV, ~ 900 uJ, 128 pulses, tuning was needed for few hours
Achievements / Observations:
Alignment of crystals
Issues:
X-ray beam intensity was weak at 12.7 keV (100 uJ), so we decided to use 10 keV |
2
|
19 Jan 2025, 11:46 |
Jan Gruenert | PRC | Issue | 1) BKR calls SUN11h20 and informs about issues with the SA1 SRA. Motors in ERROR.
2) Additionally, there was this morning a fire alarm, where in one rack (SASE1 rack 1.1 in XTD2) the gas extinguishing system was triggered, see also https://ttfinfo.desy.de/XFELelog/show.jsp?dir=/2025/03/19.01_M&pos=2025-01-19T10:22:14
PRC investigating.
BEAM STATUS: SA1 is still lasing at 1100 uJ at 9 keV, IMGFEL is inserted and beam visible. XGM and imagers operational.
- All SA1-SRA MOTORS (SA1_XTD2_PSLIT/MOTOR/) in sa1_beckhoff_mov are in ERROR and cannot be reset.
- Same for SA1_XTD2_FLT/MOTOR/TARGET (in ERROR and cannot be reset)
- SA1_XTD2_SRA_SLIT/MDL/MAIN in ERROR
- Same for SA1_XTD9_IMGPII45/MOTOR/NAVITAR_FOCUS and _ZOOM, but these karabo devices can be RESET, however Hardware State remains ERROR. Hardware interlocked.
- Same for SA1_XTD2_PES/SWITCH/G1_OK and G2_OK, but these karabo devices can be RESET, and the Hardware State here is then OFF. Hardware REGION is normal.
- SA1_XTD2_PES/SERIAL/V101256D and SA1_XTD2_PES/VALVE/V101256D in ERROR, can be reset. the STATE = NORMAL.
- Also found in ERROR: SA1_XTD2_WATCHDOG/MDL/STOP2_BKG_IMGFEL (but can be reset, is stopped).
- BeckhoffPlcMonitor SA1_BR_SYS/PLC/MOV_PLCMON in ERROR, can be reset, Hardware state NORMAL.
- SA1_XTD9_MIRR/ACTRL/RZ in ERROR (not the other related motors)
- SA1_XTD2_PSLIT/LVDT/BLADE... all in ERROR, can be reset, then hardware state ON. Hardware error description: "PLC Error: Terminal is not operational"
- SA1_XTD9_MIRR/ASESN/RY and RZ in ERROR, can be reset, then hardware state ON. Hardware error description: "0xc009"
- SA1_BR_SYS/PLC/XFELO_PLCMON in ERROR, can be reset, Hardware state NORMAL.
- SA1_XTD2_DOOCS/CAM/OTRC_2615_T9 (DOOCS-to-karabo bridge for transmissive imager) not instantiated. I instantiate it, there are no issues, works fine.
- Everything OK with SA1 vacuum devices.
Actions for BKR to continue SASE tuning:
- The IMGFEL image is oversaturated. Changing to BN. The beam is at (13.5mm / 4mm), while the handover cross is at (12.75, 5.22mm). Beam is clipping at the top SRA blade.
- inserting transmissive imager (YAG). Beam is fully visible and centered at X=1045,Y=1140. Instruction to BKR to use this imager to shift the beam center, and then continue on IMGFEL.
Further actions:
- Information to DRC (Bruno)
- He will inform EEE-OCD to look into the issue and see what they might be able to fix without an access.
- If they find out an access is required to fix hardware in XTD2, we will request an access (probably not today but MON or TUE).
- A redmine ticket of DOC will collect the infos from DRC and EEE-OCD.
A similar issue at SA1 XTD2 rack 1.1 had occurred in November 2024, see https://in.xfel.eu/elog/OPERATION-2024/205
Updates MON morning:
- EEE made the access request and it was scheduled for MON 10am: #215916 - Suspected blown fuse replacement in Rack 1.1
|
Attachment 1: JG_2025-01-20_um_10.24.01.png
|
|
|