Group Selection Page HELP Controls Group Data Analysis Group ITDM WP76 DET Vacuum EEE WP78 FXE SPB MID HED SQS SXP Sample Environment Operation PSPO XO TS Migrated2Zulip
OPERATION-2025 OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2025 logbook, Contact: F.Wolff-Fabris, A.Galler, H.Sinn, Page 2 of 5  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Authordown Group Subject
  48   11 Apr 2025, 23:14 Tokushi SatoSPBShift summary

X-ray delivery:

20 keV, ~ 400 uJ, 246 pulses, stable delivery

Optical Laser:

1030 nm, 850 fs, stable delivery

Achievements / Observations:

Spatial and temporal alignment of optical laser setup
Data collection

  49   12 Apr 2025, 23:15 Tokushi SatoSPBShift summary

X-ray delivery:

20 keV, ~ 500 uJ, 246 pulses, stable delivery

Optical Laser:

1030 nm, 850 fs, stable delivery

Achievements / Observations:

Lots of data collection

Issues:

Shimadzu camera for Schlieren imaging had issue with shutter, mechanically broken.

  50   13 Apr 2025, 22:55 Tokushi SatoSPBShift summary

Staff: PV, TS, JK, FK, + users

X-ray delivery:

20 keV, ~ 300-400 uJ, 250 pulses, stable delivery 

Optical Laser:

1030 nm, 850 fs, stable delivery


Achievements / Observations:

Lots of data collection

Issues:

No major issue today

  52   14 Apr 2025, 23:08 Tokushi SatoSPBShift summary

X-ray delivery:

20 keV,  250-400 uJ, 250 pulses, stable delivery

Optical Laser:

1030 nm, 850 fs, stable delivery

Achievements / Observations:

Lots of data collection

Issues:

No major issue today

  56   25 Apr 2025, 06:48 Tokushi SatoSPBShift summary

X-ray delivery:

10 keV, ~ 850 uJ, 128 pulses, tuning was needed for 1 hour 

Optical Laser:

No PP-laser for this week


Achievements / Observations:

Finalized alignment of crystals

Issues:

No major issue today.

  57   26 Apr 2025, 06:55 Tokushi SatoSPBShift summary

Staff: PV, TS, JK + external collaborators 

X-ray delivery:

10 keV, ~ 800 uJ, 128 pulses, tuning was needed for 10 min. 

Optical Laser:

No PP-laser for this week


Achievements / Observations:

Finalized alignment of X-ray setup

Issues:

No major issue today.

  60   01 May 2025, 23:35 Tokushi SatoSPBShift summary

X-ray delivery

  • 8.3 / 9.3 keV, 1400 uJ pulse energy, 1 hour down time

Optical laser delivery

  • NS illumination
  • 355 nm pump laser

Achievements/Observations

  • PCS finished
  • Preparation for the next experiment; mainly 355 nm.
  62   03 May 2025, 06:47 Tokushi SatoSPBShift summary

**X-ray delivery**
- 8.3 , 1600 uJ pulse energy

**Optical laser delivery**
- NS illumination
- 355 nm pump laser

**Achievements/Observations**
- Measured/tested various samples and different pump laser delays and illumination delays

**Issues**
- There was some sample that caused clogging in the morning

  63   03 May 2025, 23:13 Tokushi SatoSPBShift summary

X-ray delivery

  • 8.0 keV, 1600 uJ pulse energy

Optical laser delivery

  • NS illumination
  • 355 nm pump laser

Achievements/Observations

  • Once again measured a lot of runs worth of data today

Issues

  • No issues
  64   04 May 2025, 23:14 Tokushi SatoSPBShift summary

X-ray delivery

  • 8.0 keV, 1300 uJ pulse energy by the end, it lowered during the day

Optical laser delivery

  • NS illumination
  • 355 nm pump laser

Achievements/Observations

  • Once again measured a lot of runs worth of data today

Issues

  • No major issue today
  65   05 May 2025, 22:41 Tokushi SatoSPBShift summary

X-ray delivery

  • 8.0 keV, 1300-1600 uJ pulse energy by the end

Optical laser delivery

  • NS illumination
  • 355 nm pump laser

Achievements/Observations

  • Once again measured a lot of runs worth of data today

Issues

  • No major issue today
  38   17 Mar 2025, 06:51 Romain LetrunSPBIssue

The status of the FXE shutter in the Public status display DOOCS panel is incorrect. Here appears as opened, when it is actually closed.

Attachment 1: Screenshot_from_2025-03-17_06-45-52.png
Screenshot_from_2025-03-17_06-45-52.png
  58   30 Apr 2025, 22:46 Romain LetrunSPBShift summary

X-ray delivery

  • 9.3 keV, 1800 uJ pulse energy
  • 1 - 202 pulses at 564 kHz

  • Poor beam stability overall. Lots of intensity fluctuations and rather long time to recover after change of number of pulses in any beamline.

Optical laser delivery

  • 800 nm, 113 pulses, 564 kHz stable delivery

  • Illumination laser aligned

Achievements/Observations

  • Aligned instrument

  • Prepared illumination laser
  • Shot PCS sample for a few minutes

Issues

  • PCS sample clogged (at filter not nozzle) after a few crystal shots

  • A few clogs with nozzle with lyzo, when X-ray were on, even far from the nozzle somehow the splash from the explosion grew on the tip

  59   01 May 2025, 07:25 Romain LetrunSPBIssue

SPB pop-in monitor was not dricing to the switch when we retracted it to the "out " position with the MDL this morning. This prevented us to use more than two pulses. We have moved the motor one step of 300 um up, which activated the switch and relased the interlock. This should however be fixed so that the "out" position in the MDL works as expected and the motor operates reliably.

Attachment 1: Screenshot_from_2025-05-01_07-21-57.png
Screenshot_from_2025-05-01_07-21-57.png
  10   05 Feb 2025, 23:42 Raphael de WijnSPBShift summary

X-ray delivery

  • up to 202 pulses per train (~1 mJ pulse energy), 0.5 MHz.

Optical laser delivery

  • PP laser aligned to the interaction point

Achievements/Observations
Preparation for user beamtime

  • x-ray beam aligned and focused
  • gotthard II ready
  • PP laser aligned and ready
  • ns laser aligned and ready
  • inline mic aligned
     
  12   06 Feb 2025, 23:13 Raphael de WijnSPBShift summary

X-ray delivery

  • up to 202 pulses per train (~1.4 mJ pulse energy), 0.5 MHz.

Optical laser delivery

  • OPO issue in the late shift
  • PP laser aligned and timed both at the interaction point and in PAM

Achievements/Observations

  • gotthard II used and working
  • PP laser aligned and timed
  • PAM aligned and timed

Issues

  • issue with the OPO when we wanted to collect data

To do for next shift

  • collect lysozyme for geometry and start user program
  13   06 Feb 2025, 23:24 Raphael de WijnSPBIssue

Damage on FEL imager was also seen by our morning shift around 7:50am.

Attachment 1: Screenshot_from_2025-02-06_07-48-20.png
Screenshot_from_2025-02-06_07-48-20.png
  17   08 Feb 2025, 23:44 Raphael de WijnSPBShift summary

SPB/SFX 7955 Day 2

**X-ray delivery**
* up to 202 pulses per train (~1.4 mJ pulse energy), 0.5 MHz.
* A few beam downs toward the end of the shift

**Optical laser delivery**
* 420nm used for sample excitation. timed to 1ps with water jet interaction

**Achievements/Observations**
* x-ray beam de-focused to a few um for data taking
* PP laser aligned and timed
* runs for 1ps pumped data set
* good peak distribution at 11% transmission (100 CVD/ 200 CVD / None / 3200 CVD)
* hit rate better than previous day

**Issues**
* a lot of nozzle exchange
* sample most likely accumulating on the catcher entrance window
* DAMNIT issue with too many queued jobs, fixed by Oleksii (OCD)

**To do for next shift**
* finish power titration and continue with other time points

  Draft   10 Feb 2025, 00:56 Raphael de WijnSPBShift summary

SPB/SFX 7955 Day 3

X-ray delivery

  • up to 202 pulses per train (~1.4 mJ pulse energy), 0.5 MHz.

  • One longer down toward the end of the shift

Optical laser delivery

  • 420nm used for sample excitation. timed to 1ps with water jet interaction

Achievements/Observations

  • x-ray beam de-focused to a few um for data taking

  • PP laser aligned and timed

  • runs for 1ps, 100ps and 100ns pumped data sets

  • hit rate much better (even > 10%) than previous day with small crystals

Issues

  • a lot of nozzle exchange in the morning

  • DAMNIT issue with too many queued jobs – some of the earlier jobs timed out

  36   12 Mar 2025, 23:14 Raphael de WijnSPBShift summary

SPB/SFX shift summary user experiment 6933 (setup day)

X-ray delivery
-9.6-9.72 keV with Hirex monitoring, 1.4-1.8 mJ/pulse, 352 pulses/train at 1.1 MHz pulse repetition rate, short pulses

Optical laser delivery
-ns laser for illumination

Achievements/Observations

  • Beamline aligned
  • Energy scan with Zn done and energy set around 9.72 keV (120 eV offset compared to the accelerator value)
  • Aligned and could see scattering from silver cubes
ELOG V3.1.4-7c3fd00