Group Selection Page
HELP
DOC
Controls Group
Data Analysis Group
ITDM
WP76
DET
Vacuum
EEE
WP78
WP74
FXE
SCS
SPB
MID
HED
SQS
SXP
Sample Environment
Operation
PSPO
XO
TS
Migrated2Zulip
OPERATION-2025
OPERATION-2024
OPERATION-2023
OPERATION-2022
OPERATION-2021
OPERATION-2020
OPERATION-2019
SASE1-2018
SASE1-2017
Experiment data
OPERATION-2025 logbook, Contact: F.Wolff-Fabris, A.Galler, H.Sinn
Not logged in
List
|
Message ID:
6
Entry time:
31 Jan 2025, 06:28
Author:
Jörg Hallmann
Group:
MID
Subject:
Shift summary
Alignment of KB mirrors: focused beam H150-200nm x V300-350nm. Characterization of focused beam with wire scan.
Installed ePIX table and ePIX. Thorlabs server is not running, needs to be fixed by controls during the morning shift
Aligned rotation center of SSRY and put the beam into it. Moved alignment pin down by 10mm and put protecting cover on it.
Aligned DES spectrometer crystal (using YAG) to 9keV.
Checked CRL2 focusing with 9keV. Smallest is 9um (with bender adjust).
Alexey played with Mono further, second reflection not found. Problem found with actuator.
Tested FF data. Seems to be good.