Group Selection Page HELP Controls Group ITDM Vacuum WP78 SPB SQS XO ToBeMigrated2XWiki ToBeMigrated2GitlabPages ToBeMigratedByGroup Migrated2Zulip Archived2PDF not2MigrateOrArchive
SCS SXP Migrated2Zulip Photon Commissioning Team XRO DOC HED Migrated2Zulip WP74 MID PSPO_XO XO_Operation SQS Migrated2Zulip FXE Migrated2Zulip DET Sample Environment SPB Migrated2Zulip
OPERATION-2025 OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2025 logbook, Contact: F.Wolff-Fabris, A.Galler, H.Sinn, Page 1 of 5  Not logged in ELOG logo
ID Date Author Group Subjectdown Text Attachments
  9   01 Feb 2025, 15:40 Frederik Wolff-FabrisPRCStatusSaturday 01.Feb around 2AM machine went
down due to problems with cold magnet at
A20:
  
  37   15 Mar 2025, 19:49 Harald SinnPRCStatusMID called and reported issue with Dachs
terminals at the user labs (probably no power).
TS was informed. Because the lab are
  
  51   14 Apr 2025, 09:50 Jan GruenertXPDStatusBeam Downtime

During last night, apparently the
photon beam was down in all SASE beamlines
 JG_2025-04-14_um_09.43.03.png 
  69   14 May 2025, 09:39 Jan GruenertPRCStatusDelayed start of SA1 (and SA3) beam delivery

The
beam delivery to the North branch (SASE1
/ SASE3) was delayed by 24h compared to the
 JG_2025-05-14_um_09.37.38.png 
  80   12 Jun 2025, 07:35 Frederik Wolff-FabrisPRCStatusTHURSDAY 12..06:

At ~1:00AM on the night Wed-Thu the
cold compressors had an issue with their
  
  43   07 Apr 2025, 15:35 Jan GruenertPRCStability IssueSASE1 pulse energy drops slowly
three times

SASE1
XGM detects three times during the morning
 JG_2025-04-07_um_15.34.41.png 
  5   30 Jan 2025, 23:08 Chan KimSPBShift summaryX-ray delivery


11.0 keV, up to 178 pulses
at 564 kHz, 650 uJ.


Optical
  
  6   31 Jan 2025, 06:28 Jörg HallmannMIDShift summary
Alignment of KB mirrors: focused
beam H150-200nm x V300-350nm. Characterization
of focused beam with wire scan.
Installed
  
  8   31 Jan 2025, 21:24 Chan KimSPBShift summaryX-ray delivery


11.0 keV, up to 352 pulses
at 1.1 MHz, 900 uJ.


Optical
  
  10   05 Feb 2025, 23:42 Raphael de WijnSPBShift summaryX-ray delivery


up to 202 pulses per train
(~1 mJ pulse energy), 0.5 MHz.


Optical
  
  12   06 Feb 2025, 23:13 Raphael de WijnSPBShift summaryX-ray delivery


up to 202 pulses per train
(~1.4 mJ pulse energy), 0.5 MHz.


Optical
  
  14   07 Feb 2025, 05:56 Peter ZaldenFXEShift summaryPreparation for user expt #7944

X-ray delivery


since pulses (10 Hz) at
  
  15   08 Feb 2025, 00:00 Tokushi SatoSPBShift summarySPB/SFX 7955 Shift 1
**X-ray delivery**
* up to 202 pulses per train (~1.4
  
  16   08 Feb 2025, 06:25 Peter ZaldenFXEShift summaryPreparation for user expt #7944

X-ray delivery


Since pulses (10 Hz) at
  
  17   08 Feb 2025, 23:44 Raphael de WijnSPBShift summarySPB/SFX 7955 Day 2

**X-ray delivery**
* up to 202 pulses per train (~1.4
  
  18   09 Feb 2025, 06:35 Peter ZaldenFXEShift summaryPreparation for user expt #7944

X-ray delivery


Single pulses (10 Hz) at
  
  Draft   10 Feb 2025, 00:56 Raphael de WijnSPBShift summarySPB/SFX 7955 Day
3

X-ray
  
  20   11 Feb 2025, 01:41 Tomas PopelarSPBShift summarySPB/SFX 7955 Day 4

X-ray delivery



up to 202 pulses
  
  21   13 Feb 2025, 07:24 Tokushi SatoSPBShift summaryX-ray delivery

    up to 352 pulses
per train (~1.9 mJ pulse energy)@9.3 keV,
  
  22   15 Feb 2025, 06:52 Tokushi SatoSPBShift summaryX-ray delivery

    up to 202 pulses
per train (~1.9 mJ pulse energy)@9.3 keV,
  