Group Selection Page HELP Controls Group Data Analysis Group ITDM WP76 DET Vacuum EEE WP78 FXE SPB MID HED SQS SXP Sample Environment Operation PSPO XO TS Migrated2Zulip
OPERATION-2025 OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2025 logbook, Contact: F.Wolff-Fabris, A.Galler, H.Sinn, Page 1 of 5  Not logged in ELOG logo
ID Datedown Author Group Subject
  82   17 Jun 2025, 07:08 Lena WorbsSPBExperiment summary

SPB/SFX shift summary inhouse experiment 9456, shift 16./17.06.2025

**X-ray delivery**
- 6.51 keV, 1.4 mJ, 352 pulses/train at 1.1MHz rep rate

**Optical laser delivery**
- none

**Achievements/Observations**
- collected data on Ag cubes with two x-ray beam profiles
- tunnel CRL (Arm 1) increased intensity in focus by 30-40% (max intensity in NKB_focusing scene)
- collected data on gold spheres and encapsulin together from the double flow nozzle 

**Issues**
- beam trip due to vacuum spike in OH (PSLIT section)

  81   16 Jun 2025, 07:14 Lena WorbsSPBShift summary

SPB/SFX shift summary inhouse experiment 9456, shift 15./16.06.2025

**X-ray delivery**
- 6.51 keV, 1.3-1.4 mJ 352 pulses/train at 1.1MHz rep rate

**Optical laser delivery**
- none

**Achievements/Observations**
- collected data on gold spheres from the double flow nozzle 
- collected data on gold spheres and encapsulin together from the double flow nozzle 

**Issues**
- low hit rates

  80   12 Jun 2025, 07:35 Frederik Wolff-FabrisPRCStatus

THURSDAY 12..06:

At ~1:00AM on the night Wed-Thu the cold compressors had an issue with their operation and they shut down. It takes time to fill the He-levels and to get the whole system stable again. Operation and beam delivery is currently not possible.

*Status 07:30: The best case scenario is that the cryo plant may be back in operation at ~1 pm. That would mean photon delivery not before ~3 pm. Further accessment and update will be made after lunch time.

*Status 08:45: Parts were exchanged at the cold compressor this morning and only by 15:00 we will be able to know if cryo system gets stable allowing for operation. 

*Status 16:00: Cryo team still works to recover the cold compressor and will update RC and PRC when reliable information is available. There will be no beam delivery to instruments for the afternoon shift (15:00-23:00).

*Status 17:30: Unfortunately the attempt to restart the cold compressor failed and the Cryo colleagues are going to exchange one motor; This means we have no beam delivery tonight and tomorrow morning. The earliest we could have photons is on Friday 14:00 or later. The more exact situation for the Friday afternoon will be known and communicated during Friday morning; Also note that BKR operator's shifts will restart on Friday 7AM.

  79   02 Jun 2025, 07:59 Yoonhee KimSPBShift summary

X-ray delivery

  • 9.3 keV, 1600-1700 uJ photon flux, beam down once due to Big Brother intervention. But the signal on HIREX was less than 10 counts.

Optical laser delivery

  • ns laser for particle illumination inside the chamber
  • another ns laser to visualize the tip of capillary on top of the chamber

Achievements/Observations

  • Measured granulovirus

  • Hit rate of defocused beam was similar or less than with focused beam, Q range is smaller than with focused beam.

  • Without dryer, hit rate is more than twice.

Issues

  • BIG BROTHER is intervened due to HIREX and beam was down due to that. But the count on HIREX with Al1.2 was less than 100 count.

Instrument status

  • AGIPD HV off.
  • AGIPD gate valve closed and pinned.
  • Attenuators set to thickest diamond.
  • Vacuum valves closed.
  • AGIPD breaks enguaged
  • ns Lasers off
  • HIREX is out
  78   01 Jun 2025, 08:48 Yoonhee KimSPBShift summary

X-ray delivery

  • 9.3 keV, 1400 uJ photon flux

Optical laser delivery

  • ns laser for particle illumination inside the chamber
  • another ns laser to visualize the tip of capillary on top of the chamber

Achievements/Observations

  • Measured GV for ~2 hours, hit rate is ~0.0003 (from Karabo TST/SFX/MONITOR/sfx, 1 = 100 %)
  • Measured PSI with different condition as below :
    1) without dryer : as we observed sample deposited on the tube connected to the inlet of dryer yesterday. Black tube is coated to avoid any deposition of particle on the wall)
    2) without both lasers : to avoid any heat effect if laser produces heat
    3) without EtOH : EtOH can disolve PSI crystals

Issues

  • PSI sample is not delivered well to the interaction region.
  • When adjust the skimmer at first, I did not run liquid flow. After the skimmer distance is adjusted to the reference pressure on Pressure at injector position, we started run sample and it increased pressures not only on pressure next to the skimmer and injector inlet, but also the pressure of IRU chamber. So it triggered the valve at upstream of IRU chamber (SPB_IRU_VAC/VALVE/VALVE_INLINE_1) to close. It is solved by adjusting skimmer gap again while the liquid flow is running.

Instrument status

  • AGIPD HV off.
  • AGIPD gate valve closed and pinned.
  • Attenuators set to thickest diamond.
  • Vacuum valves closed.
  • AGIPD breaks enguaged
  • ns Lasers off
  • HIREX is out
  77   31 May 2025, 07:30 Yoonhee KimSPBShift summary

X-ray delivery

  • 9.3 keV, 2000 uJ at the beginning, 1600 uJ after 2AM. There was downtime around 15 minutes due to gun issue.
  • FXE used the beam until 23:30.

Optical laser delivery

  • ns laser for particle illumination inside the chamber,
  • another ns laser to visualize the tip of capillary on top of the chamber

Achievements/Observations

  • Measured PSI
  • Hit rate is extremely low. We could see some peaks from AGIPD preview, but it was difficult to see it from the hit finder.

Issues

  • Sample capillary line was clogged twice.
  • From the images of capillary tip and particle scattering (rayleigh / mie scattering), it seems it works fine. But hit rate is too low.

Instrument status

  • AGIPD HV off.
  • AGIPD gate valve closed and pinned.
  • Attenuators set to thickest diamond.
  • Vacuum valves closed.
  • AGIPD breaks enguaged
  • ns Lasers off
  • HIREX is out
  76   30 May 2025, 07:16 Yoonhee KimSPBShift summary

X-ray delivery

  • 9.3 keV, 2000 uJ pulse energy. Beam was unstable at the beginning.

Optical laser delivery

  • ns laser for particle illumination inside the chamber,
  • another ns laser to visualize the tip of capillary on top of the chamber

Achievements/Observations

  • Measured GV for ~ 2 hours

Issues

  • PSI from the first reservoir was leaking
  • Concentration of PSI seems low (judged by seeing camera for liquid jet delivery).
  • We could not see any diffraction from PSI by both AGIPD preview and OnDA (same setting with GV used)

Instrument status

  • AGIPD HV off.
  • AGIPD gate valve closed and pinned.
  • Attenuators set to thickest diamond.
  • Vacuum valves closed.
  • AGIPD breaks enguaged
  • ns Lasers off
  75   29 May 2025, 07:07 Yoonhee KimSPBShift summary

X-ray delivery

  • 9.3 keV, 1400-1600 uJ pulse energy, ~1000 uJ for 10 minutes

Optical laser delivery

  • ns laser for particle illumination inside the chamber,
  • another ns laser to visualize the tip of capillary on top of the chamber

Achievements/Observations

  • Installed new YAG and powder capillary
  • Measured GV from defocused beam for 5 runs (run 6-10) and focused beam for the rest of the beamtime (run 11-24, 28-42). In total 34 runs (170 minutes)
  • Hit rate with focused beam and high sample flow rate (15 sample, 15~20 EtOH) : ~0.02~0.03 %$
  • Hit rate with 3ul/min sample + 3ul/min EtOH : ~0.08 % with this sample

Issues

  • After take new darks for HIREX, the intensity was too high so BIG BROTHER was intervened. Solved by change filter from Al_1.1 to Al_1.2.
  74   25 May 2025, 23:57 Konstantin KharitonovSPBShift summary

**X-ray delivery**
- 9.34 keV, 1200-1400 uJ pulse energy

**Optical laser delivery**
- illumination laser

**Achievements/Observations**
-  Measuired multiple runs data with synchronization and high hit rate
- We have at least two devices tested and ready for tomorrow
 

  73   24 May 2025, 23:06 Konstantin KharitonovSPBShift summary

Staff: @**Katerina Doerner**  @**Elizabeth Galtry** @**Raphael de Wijn** @**Mohammad Vakili** @**Chan Kim** @**Diogo Melo** @**Konstantin Kharitonov** 

**X-ray delivery**
- 9.34 keV, 1200-1400 uJ pulse energy

**Optical laser delivery**
- illumination laser

**Achievements/Observations**
-  Managed to synchronize droplets for some runs, resulting in high hit, averaging rate ~ 8-10% and spiking up to 20%.

**Issues**
-  Synchronization and stable delivery  are challenging 
- Beam was down several times

**Instrument status**
- AGIPD HV off.
- AGIPD gate valve closed and pinned.
- Attenuators set to thickest diamond.
- Vacuum valves closed.
- AGIPD breaks engadged
- ns Lasers off
- HIREX  is handled by FXE, but maybe better to check in the morning
- PAM interlock on and shutter open
- Left the gas at 5 for 0 flow (and no noise) from GP13 flowmeter D, during the night it was at 0, and in the morning it was filled with air... Tonight we leave it this way and in the morning let us know if it worked or not.

  72   23 May 2025, 23:34 Chan KimSPBShift summary

**X-ray delivery**
- 9.34 keV, 1400-1600 uJ pulse energy

**Optical laser delivery**
- illumination laser

**Achievements/Observations**
-  Got crystal hits with a device, bypassing the valve, and most importantly the filter. We checked a drop before and after filter and there were no crystals after the filter.
- Managed to control the droplet formation for some periods - but with crystals being blocked by the filter. Did not manage to synchronize the droplets to the X-ray though.

  71   22 May 2025, 23:29 Raphael de WijnSPBShift summary

Staff: @**Katerina Doerner**  @**Elizabeth Galtry** @**Raphael de Wijn** @**Mohammad Vakili** @**Chan Kim** @**Diogo Melo** 

**X-ray delivery**
- 9.34 keV, 1400-1600 uJ pulse energy

**Optical laser delivery**
- illumination laser

**Achievements/Observations**
-  Collected some NQO1 data
- Had some hours to play around with HV with the old device. We observed a few things:
     - Without HV we could get close to 10 hz, but with jitter of +/-3hz
     - With HV at 1.2V, we clearly saw a strong effect on the droplet hz, could go from 10 Hz to 20 Hz, but the problem of the jitter remains, this looks like the main issue have the droplets frequency under control
     - We observed that with water the diode signal was one single peak, whereas with sample there were a few peaks for the whole droplet width, we tested and it indeed seems that the crystals in the droplets either refracted away or absorbed a portion of the beam to yield that diode laser peak profile...

  70   21 May 2025, 22:41 Konstantin KharitonovSPBShift summary

Staff: @**Katerina Doerner**  @**Elizabeth Galtry** @**Raphael de Wijn** @**Mohammad Vakili** @**Chan Kim** @**Konstantin Kharitonov** 

**X-ray delivery**
- 9.3 keV, 1400-1600 uJ pulse energy

**Optical laser delivery**
- No

**Achievements/Observations**
-  Found working nozzle, started injection, observed droplets, performed two parameter scans for HV 
- We could not reach the  stable droplet  frequency around 10 Hz  and were ~  fluctuating 9-17 Hz
- We  prepaired  3 more capillaries  with powder for distance calibration and left them in D12

**Issues**
- Some nozzles were leaking


**Instrument status**
- AGIPD HV off.
- AGIPD gate valve closed and pinned.
- Attenuators set to thickest diamond.
- Vacuum valves closed.
- AGIPD breaks engadged
- ns Lasers off
- HIREX  is handled by FXE, but maybe better to check in the morning

- AGIPD IS REMOVED FROM DAQ  TO MEASURE DROPLET TRAINS DON'T FORGET TO PUT IT BACK

  69   14 May 2025, 09:39 Jan GruenertPRCStatus

Delayed start of SA1 (and SA3) beam delivery

The beam delivery to the North branch (SASE1 / SASE3) was delayed by 24h compared to the plan due to a malfunction of the smoke detection system in XTD4 and the subsequent investigation and repair.
A ZZ-access to XTD4 on tuesday 13.5.2025 morning to resolve this issue (and scheduled for 7h-9h) turned into a full day access until after 18h, thus the first day of the XFELO study couldn't happen.

SASE1 beam then started at 18h46 with immediately 4.5 mJ at 6.95 keV (0.18 nm). For the night program, at 22h the photon energy was changed to 9.6 keV (0.129 nm).
The planned daytime SASE1 activity (XFELO study) started finally on wednesday at 9h20 when SASE1 was switched back to 6.95 keV.

Throughout all this time the South branch was unaffected and the blue week program in SASE2 happened as scheduled. SASE3 beam delivery was started only on wednesday morning.

Attachment 1: JG_2025-05-14_um_09.37.38.png
JG_2025-05-14_um_09.37.38.png
  68   13 May 2025, 07:00 Raphael de WijnSPBExperiment summary

End of in-house beamtime

X-ray delivery

  • 9.3 keV, 2.2-2.5 mJ pulse energy, up to 202 pulses at 0.5MHz, stable over the week

Optical laser delivery

  • PP laser used but several issues with experiment master switch

Achievements/Observations

  • Collected SFX data from deoxymyoglobin crystals mixed with an oxygen cage compound before illumination with the PP laser to release oxygen
  67   09 May 2025, 06:59 Raphael de WijnSPBShift summary

Shift summary in-house night 2

X-ray delivery

  • 9.3 keV, 2.2-2.5 mJ pulse energy, up to 202 pulses at 0.5MHz, high slope across the train

Optical laser delivery

  • NS illumination
  • PP laser not used

Achievements/Observations

  • Collected deoxymyoglobin

Issues

  • Issues with our mixers, need to be solved during the day,
  66   08 May 2025, 04:56 Raphael de WijnSPBShift summary

Shift summary in-house beamtime night 1

X-ray delivery

  • 9.3 keV, 1.7-2.2 mJ pulse energy, up to 202 pulses at 0.5MHz

Optical laser delivery

  • NS illumination
  • PP laser not available as we could not change master experiment

Achievements/Observations

  • Collected SFX lysozyme data at two different detector distances
  • Collected SFX metmyoglobin as positive control

Issues

  • None
  65   05 May 2025, 22:41 Tokushi SatoSPBShift summary

X-ray delivery

  • 8.0 keV, 1300-1600 uJ pulse energy by the end

Optical laser delivery

  • NS illumination
  • 355 nm pump laser

Achievements/Observations

  • Once again measured a lot of runs worth of data today

Issues

  • No major issue today
  64   04 May 2025, 23:14 Tokushi SatoSPBShift summary

X-ray delivery

  • 8.0 keV, 1300 uJ pulse energy by the end, it lowered during the day

Optical laser delivery

  • NS illumination
  • 355 nm pump laser

Achievements/Observations

  • Once again measured a lot of runs worth of data today

Issues

  • No major issue today
  63   03 May 2025, 23:13 Tokushi SatoSPBShift summary

X-ray delivery

  • 8.0 keV, 1600 uJ pulse energy

Optical laser delivery

  • NS illumination
  • 355 nm pump laser

Achievements/Observations

  • Once again measured a lot of runs worth of data today

Issues

  • No issues
ELOG V3.1.4-7c3fd00