Group Selection Page HELP Controls Group Data Analysis Group ITDM WP76 DET Vacuum EEE WP78 FXE SPB MID HED SQS SXP Sample Environment Operation PSPO XO TS Migrated2Zulip
OPERATION-2025 OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2025 logbook, Contact: F.Wolff-Fabris, A.Galler, H.Sinn  Not logged in ELOG logo
Message ID: 76     Entry time: 30 May 2025, 07:16
Author: Yoonhee Kim 
Group: SPB 
Subject: Shift summary 

X-ray delivery

  • 9.3 keV, 2000 uJ pulse energy. Beam was unstable at the beginning.

Optical laser delivery

  • ns laser for particle illumination inside the chamber,
  • another ns laser to visualize the tip of capillary on top of the chamber

Achievements/Observations

  • Measured GV for ~ 2 hours

Issues

  • PSI from the first reservoir was leaking
  • Concentration of PSI seems low (judged by seeing camera for liquid jet delivery).
  • We could not see any diffraction from PSI by both AGIPD preview and OnDA (same setting with GV used)

Instrument status

  • AGIPD HV off.
  • AGIPD gate valve closed and pinned.
  • Attenuators set to thickest diamond.
  • Vacuum valves closed.
  • AGIPD breaks enguaged
  • ns Lasers off
ELOG V3.1.4-7c3fd00