ID |
Date |
Author |
Group |
Subject |
42
|
07 Apr 2025, 07:19 |
Harald Sinn | PRC | SA1 status | 7:15 SPB reports large background from non-lasing SASE3 bunches. BKR is informed.
7:50 BKR analysed situation. Everything concerning the orbits is OK, so the background is due to the standard spontaneous background (about < 1% level of FEL beam). With SASE3 running currently 255 lasing bunches and SASE1 single bunch the intensities will be on a similar level. Recommendation to SPB to close SRAs from 3 mm to maybe 1.5 mm to reduce background. |
41
|
06 Apr 2025, 06:33 |
Harald Sinn | PRC | SA2 status | 5:49 HED called and they have problems with the Laser Sync signal. A change of laser delay is not possibe. We supsect that it is similar to earlier this week at FXE, where a crash of a sync CPU caused a similar error. BRK is informed and tries to reach somebody from sync Group via email (at 6:35, no OCD phone number available) . If this does not work, we will work with the shifts starting at 7:00 on this (DOC and new BKR crew).
8:45 (see also DESY elog entries): After several attempts LBsync timing works, at least for now. One problem was that the crate was constantly rebooting by itself. Now it is stable, but error could happen again. In that case, BKR should activate expert via email.
Attachements: Location of LBsync server status in DOOCS and status of XFELcpuSYNCEXP1-3 for last light |
Attachment 1: LBsync1.jpg
|
|
Attachment 2: LBsync2.jpg
|
|
Attachment 3: LBsync3.jpg
|
|
Attachment 4: LBsync4.jpg
|
|
Attachment 5: LBsync5.jpg
|
|
40
|
03 Apr 2025, 07:34 |
Harald Sinn | PRC | SA1 status | 7:20 FXE reports a problem with laser synchronisation (yellow warning light and could not change delay). BKR informs the DESY laser sync group.
7:51 DESY sync group reported that there was a CPU failing about 6 am this morning which led to the yellow warning light. However, synchronisation was very likely all the time ok withing 5-10fs. The CPU was now reset and everything should be wokring now. |
39
|
27 Mar 2025, 22:57 |
Tokushi Sato | SPB | Shift end | **X-ray delivery:**
* 16 keV, ~upto 1 mJ, 160 pulses
**Optical Laser:**
* None
**Achievements / Observations:**
* Alignement
* Recorded first explosions |
38
|
17 Mar 2025, 06:51 |
Romain Letrun | SPB | Issue | The status of the FXE shutter in the Public status display DOOCS panel is incorrect. Here appears as opened, when it is actually closed. |
Attachment 1: Screenshot_from_2025-03-17_06-45-52.png
|
|
37
|
15 Mar 2025, 19:49 |
Harald Sinn | PRC | Status | MID called and reported issue with Dachs terminals at the user labs (probably no power). TS was informed. Because the lab are currently accessible (doors are locked open), TS will take care about it on Monday. |
36
|
12 Mar 2025, 23:14 |
Raphael de Wijn | SPB | Shift summary |
SPB/SFX shift summary user experiment 6933 (setup day)
X-ray delivery
-9.6-9.72 keV with Hirex monitoring, 1.4-1.8 mJ/pulse, 352 pulses/train at 1.1 MHz pulse repetition rate, short pulses
Optical laser delivery
-ns laser for illumination
Achievements/Observations
- Beamline aligned
- Energy scan with Zn done and energy set around 9.72 keV (120 eV offset compared to the accelerator value)
- Aligned and could see scattering from silver cubes
|
35
|
04 Mar 2025, 07:05 |
Tokushi Sato | SPB | Shift summary | X-ray delivery
up to 188/352 pulses per train (~1 mJ pulse energy)@13.4 keV, 0.5/1.1 MHz
Optical laser delivery
800 nm, less than 20 fs at sample position, no issue
Achievements/Observations
X-ray beam de-focused to a few um for data taking
PP laser aligned
Data collection for some samples |
34
|
03 Mar 2025, 07:05 |
Tokushi Sato | SPB | Shift summary | X-ray delivery
up to 188 pulses per train (~1 mJ pulse energy)@13.4 keV, 0.5 MHz
Optical laser delivery
800 nm, less than 20 fs at sample position, no issue
Achievements/Observations
X-ray beam de-focused to a few um for data taking
PP laser aligned
Data collection for some samples |
33
|
02 Mar 2025, 06:56 |
Tokushi Sato | SPB | Shift summary | X-ray delivery
up to 175 pulses per train (~1 mJ pulse energy)@13.4 keV, 0.5 MHz
Optical laser delivery
800 nm, less than 20 fs at sample position, no issue
Achievements/Observations
X-ray beam de-focused to a few um for data taking
PP laser aligned
Data collection for some samples
Issues
We could use 188 pulses, but last 13 pulses intensity was too weak, not used for measurement
|
32
|
01 Mar 2025, 11:53 |
Martin Dommach | PRC | Issue | Due to issues SCS has with pulses from SASE1 lasing in SASE3 and destroying, or at least modifying, their sample, it was decided to change the order in the RF configuration to have SASE3 pulses before SASE1. The change will be done at 12 pm, agreed with FXE.
The impact for SPB will be the loss a few pulses (5%), I contacted Richard to get confirmation that this is ok for SPB.
Best regards,
Martin (PRC week 9) |
31
|
01 Mar 2025, 06:56 |
Tokushi Sato | SPB | Shift summary | X-ray delivery
up to 202/352 pulses per train (~0.8 mJ pulse energy)@13.4 keV, 0.5/1.1 MHz
Optical laser delivery
800 nm, less than 20 fs at sample position, no issue
Achievements/Observations
X-ray beam de-focused to a few um for data taking
PP laser aligned
Data collection for some samples
|
30
|
28 Feb 2025, 06:57 |
Tokushi Sato | SPB | Shift summary | X-ray delivery
up to 202/352 pulses per train (~0.8 mJ pulse energy)@13.4 keV, 0.5/1.1 MHz
Optical laser delivery
800 nm, less than 20 fs at sample position, no issue
Achievements/Observations
X-ray beam de-focused to a few um for data taking
PP laser aligned
Data collection for some samples
Issues
No major issue today
|
29
|
27 Feb 2025, 07:02 |
Tokushi Sato | SPB | Shift summary | X-ray delivery
up to 202/352 pulses per train (~0.8 mJ pulse energy)@13.4 keV, 0.5/1.1 MHz
Optical laser delivery
800 nm, less than 20 fs at sample position, no issue
Achievements/Observations
X-ray beam de-focused to a few um for data taking
PP laser aligned
Fixed target measurement was finished |
28
|
25 Feb 2025, 02:41 |
Jayanath Koliyadu | SPB | Shift summary | X-ray delivery
-15 keV with Hirex monitoring, 0.5 mJ/pulse, 202 pulses/train at 0.56 MHz pulse repetition rate
Optical laser delivery
- 810 nm laser for illumination
-PP laser for excitation, 590 nm, 51 pulses, 141 kHz
Achievements/Observations
- Collected high resolution time resolved data
- Collected Tve_CPC500f and Tve_CPC1n data and completed Tve_CPC20p
|
27
|
21 Feb 2025, 23:21 |
Mohammad Vakili | SPB | Shift summary | SPB/SFX shift summary user experiment 8039
**X-ray delivery**
-15 keV with Hirex monitoring, 0.5 mJ/pulse, 202 pulses/train at 0.56 MHz pulse repetition rate
**Optical laser delivery**
-810 nm laser for illumination
**Achievements/Observations**
- Collected sample data for ca. 2h 15min using a DFFN
- XTD2 CRLs optimized and realigned
- Offset mirror M1/M2 optimized for 15 keV
- Repositioned the illumination fiber inside IRU chamber
- Germanium blades were installed for the IRU_Slit_4 (top and bottom)
**Issues**
- PP laser alignment could not be pursued as hexapod had to be repositioned first (interaction region was too close to exit cone)
|
26
|
20 Feb 2025, 23:29 |
Chan Kim | SPB | Shift summary | X-ray delivery
- 12.4 keV, 1.1mJ/pulse, 202 pulses/train at 0.56MHz
- Focused NKB beam was used
Optical laser delivery
- ns laser for jet visualization
Achievements/Observations
- Successfully finished all PCS beamtimes
- Stable jet with PEO sheath
Issues
- No beam in the morning
- Unstable jet with ethanol sheath
|
25
|
19 Feb 2025, 21:25 |
Chan Kim | SPB | Shift summary | X-ray delivery
-12.4 keV, 202 pulses, 0.5 MHz, 1mJ/pulse
Optical laser delivery
- ns laser (660 nm wavelength) for jet illumination
Achievements/Observations
- NKB focus optimized
- One PCS user program successfully finished
- Second PCS user program was just started
Issues
- Right before we could start with beam defocusing, the beam was gone around 8:45 pm. BKR called to let us know that there will be no beam today (cryo issues) |
24
|
17 Feb 2025, 06:57 |
Tokushi Sato | SPB | Shift summary | X-ray delivery
up to 202 pulses per train (~1.9 mJ pulse energy)@9.3 keV, 0.5 MHz
Optical laser delivery
800 nm, less than 20 fs at sample position, no issue
Achievements/Observations
X-ray beam de-focused to a few um for data taking
PP laser aligned and timed
runs for -1 ps - 1.5 ps
Very stable jet
PAM was installed |
23
|
16 Feb 2025, 06:46 |
Tokushi Sato | SPB | Shift summary | X-ray delivery
up to 202 pulses per train (~1.9 mJ pulse energy)@9.3 keV, 0.5 MHz
Optical laser delivery
800 nm, less than 20 fs at sample position, no issue
Achievements/Observations
X-ray beam de-focused to a few um for data taking
PP laser aligned and timed
runs for -1 ps - 1.5 ps
Very stable jet
Issues
No major issue
|
|