Group Selection Page HELP Controls Group Data Analysis Group ITDM WP76 DET Vacuum EEE WP78 FXE SPB MID HED SQS SXP Sample Environment Operation PSPO XO TS Migrated2Zulip
OPERATION-2025 OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2025 logbook, Contact: F.Wolff-Fabris, A.Galler, H.Sinn, Page 4 of 4  Not logged in ELOG logo
ID Date Author Group Subject Text Attachments
  Draft   10 Feb 2025, 00:56 Raphael de WijnSPBShift summarySPB/SFX 7955 Day
3

X-ray
  
  18   09 Feb 2025, 06:35 Peter ZaldenFXEShift summaryPreparation for user expt #7944

X-ray delivery


Single pulses (10 Hz) at
  
  17   08 Feb 2025, 23:44 Raphael de WijnSPBShift summarySPB/SFX 7955 Day 2

**X-ray delivery**
* up to 202 pulses per train (~1.4
  
  16   08 Feb 2025, 06:25 Peter ZaldenFXEShift summaryPreparation for user expt #7944

X-ray delivery


Since pulses (10 Hz) at
  
  15   08 Feb 2025, 00:00 Tokushi SatoSPBShift summarySPB/SFX 7955 Shift 1
**X-ray delivery**
* up to 202 pulses per train (~1.4
  
  14   07 Feb 2025, 05:56 Peter ZaldenFXEShift summaryPreparation for user expt #7944

X-ray delivery


since pulses (10 Hz) at
  
  13   06 Feb 2025, 23:24 Raphael de WijnSPBIssueDamage on FEL imager was also seen by our
morning shift around 7:50am.
 Screenshot_from_2025-02-06_07-48-20.png 
  12   06 Feb 2025, 23:13 Raphael de WijnSPBShift summaryX-ray delivery


up to 202 pulses per train
(~1.4 mJ pulse energy), 0.5 MHz.


Optical
  
  11   06 Feb 2025, 23:02 Peter ZaldenFXEIssueWe observed a damage spot on the SA1 FEL
imager. It moves with the target holder,
but not sure if its damage on the optical
 2025-02-06-230215_634787810_exflqr51474.png 
  10   05 Feb 2025, 23:42 Raphael de WijnSPBShift summaryX-ray delivery


up to 202 pulses per train
(~1 mJ pulse energy), 0.5 MHz.


Optical
  
  9   01 Feb 2025, 15:40 Frederik Wolff-FabrisPRCStatusSaturday 01.Feb around 2AM machine went
down due to problems with cold magnet at
A20:
  
  8   31 Jan 2025, 21:24 Chan KimSPBShift summaryX-ray delivery


11.0 keV, up to 352 pulses
at 1.1 MHz, 900 uJ.


Optical
  
  7   31 Jan 2025, 12:43 Frederik Wolff-FabrisPRCSA3 statusA ZZ is organized to happen now, 31.01
at ~12:40, in order to reset a cabinet belonging
to one of the Apple-X undulators.
  
  6   31 Jan 2025, 06:28 Jörg HallmannMIDShift summary
Alignment of KB mirrors: focused
beam H150-200nm x V300-350nm. Characterization
of focused beam with wire scan.
Installed
  
  5   30 Jan 2025, 23:08 Chan KimSPBShift summaryX-ray delivery


11.0 keV, up to 178 pulses
at 564 kHz, 650 uJ.


Optical
  
  4   30 Jan 2025, 13:59 Frederik Wolff-FabrisPRCSA3 statusOn 29.01 evening the SA3 pre-absorber was
interlocked due to M5 mirror.

With the help of Maurizio V., it
  
  3   29 Jan 2025, 09:08 Andreas KochXPDSA3 statusThe SA3 FEL imager is now protected via
the Big Brother server, which creates a beam
limit on the bunch pattern server if necessary.
  
  2   19 Jan 2025, 11:46 Jan GruenertPRCIssue1) BKR calls SUN11h20 and informs
about issues with the SA1 SRA. Motors in
ERROR.
 JG_2025-01-20_um_10.24.01.png 
  1   14 Jan 2025, 07:38 Andreas KochXPDSA3 statusThe image intensifier in the SQS Exit Slit
imager had been exchanged on request of SQS,
Thomas Baumann.
  
ELOG V3.1.4-7c3fd00