Group Selection Page HELP Controls Group ITDM Vacuum WP78 SPB SQS XO ToBeMigrated2XWiki ToBeMigrated2GitlabPages ToBeMigratedByGroup Migrated2Zulip Archived2PDF not2MigrateOrArchive
SCS SXP Migrated2Zulip Photon Commissioning Team XRO DOC HED Migrated2Zulip WP74 MID PSPO_XO XO_Operation SQS Migrated2Zulip FXE Migrated2Zulip DET Sample Environment SPB Migrated2Zulip
OPERATION-2025 OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2025 logbook, Contact: F.Wolff-Fabris, A.Galler, H.Sinn  Not logged in ELOG logo
Message ID: 4     Entry time: 30 Jan 2025, 13:59
Author: Frederik Wolff-Fabris 
Group: PRC 
Subject: SA3 status 

On 29.01 evening the SA3 pre-absorber was interlocked due to M5 mirror.

With the help of Maurizio V., it was found the M5 RY motor has to be driven to 400um position to release the interlock condition and permit beam to SXP and SQS. This relates to a limit switch which was in a undesired location and about 1mm out of position.

ELOG V3.1.4-7c3fd00