ID Date Authordown Group Subject Text Attachments
  50   15 Mar 2024, 00:07 Harald SinnPRCIssueSASE1 bunch number was reduced to 10 pulses
for no obvious reason. 

Traced it back to a malfunctioning
 watchdog_error.jpgcracks_in_SA.jpg 
  55   16 Mar 2024, 12:12 Harald SinnPRCIssue11:15 SASE1/SPB called that they observed
and issue with the SASE1 XGM/XTD2: about
every 35 seconds the power reading jumps
  
  77   10 Apr 2024, 11:55 Harald SinnPRCStatusYesterday two motors of the SASE2 seeding
mono were damaged. The mono was exchanged
in the afternoon and pumped down. Currently,
  
  131   24 Jul 2024, 10:26 Harald SinnPRCIssueIn SASE2 undualtor cell 10 has issues.
Suren K. will do a ZZ at 11:30 to fix it
(if possible). Estimated duration: 1-3 hours. 
  
  132   24 Jul 2024, 11:35 Harald SinnPRCIssueThe control rack of the soft mono at SASE3
has some failure. Leandro from EEE will enter
the XTD10 at 12:00. 
  
  134   27 Jul 2024, 09:10 Harald SinnPRCIssueSASE1: Solid attenuator att5 is in error.
When it is tried to move it out, the arm
lifts, but does not reach the final position
  
  14   06 Feb 2024, 07:17 Giuseppe MercurioSCSShift summary
  
  15   08 Feb 2024, 07:00 Giuseppe MercurioSCSShift summaryLate shift
07.02.24
Laurent, Martin
  
  17   09 Feb 2024, 07:15 Giuseppe MercurioSCSShift summary
night
shift summary

achievements:
  
  20   11 Feb 2024, 06:28 Giuseppe MercurioSCSShift summaryNight
shift summary
Andreas, Giuseppe
  
  23   13 Feb 2024, 06:38 Giuseppe MercurioSCSShift summaryshift
summary
Andreas, Giuseppe
  
  57   20 Mar 2024, 23:03 Giuseppe MercurioSCSShift summary
Late
shift summary


coarse timing
installed
laser shutter on the laser breadboard and
  
  118   07 Jun 2024, 15:19 Giuseppe MercurioSCSShift summary
Morning
Shift Summary for 07.06.2024 (Teguh, Natalia)

Achievements:


Aligned the beamline to
  
  122   09 Jun 2024, 22:21 Giuseppe MercurioSCSShift summaryLate Shift summary

Achievements:
- recovered the beam overlap
  
  133   24 Jul 2024, 15:22 Giuseppe MercurioSCSShift summary
Shift
summary (Natalia, Giuseppe)

Achievements:


M1, M2 pitches adjusted
Grating
  
  137   29 Jul 2024, 06:45 Giuseppe MercurioSCSShift summary## Shift summary night July 28th-29th

Achievements:
- we saw signal on both MCPs (with
  
  4   31 Jan 2024, 11:24 Frederik Wolff-FabrisPRCSA1 statusA ZZ is taking place today, 31.01 at
11:30, in XTD9 to verify and fix the M3 Pop-in
screen which is currently blocking the
  
  56   20 Mar 2024, 12:41 Frederik Wolff-FabrisPRCIssueBKR called PRC around 06:10AM to inform
on vacuum issues at SA1 beamline leading
to a lost beam permission for the North Branch.
  
  89   25 Apr 2024, 21:11 Frederik Wolff-FabrisPRCStatusV0 valve for SA2 closed as the pump P22090I
at HED branch enters in wrong state. This
closed nearby vacuum valves for HED branch and
 Screenshot_2024-04-25_211325.png 
  198   04 Nov 2024, 15:07 Frederik Wolff-FabrisXOSA2 statusDear MID colleagues, Svitozar (PRC), Bolko
and Shan (RCs),
This morning we faced the situation
  