Shift summary, posted by Chan Kim on 27 Aug 2024, 12:17
|
X-ray delivery
12.78 keV, ~1.3 mJ
Optical laser delivery
800 nm laser for jet visualization
Achievements/Observations |
Shift summary, posted by Tokushi Sato on 08 Sep 2024, 06:44
|
X-ray delivery
12.8 keV, ~0.8 mJ
Achievements/Observations |
Shift summary, posted by Romain Letrun on 09 Sep 2024, 06:52
|
X-ray delivery
12.8 keV, 1 pulse, ~0.7 mJ
Achievements/Observations
Except for some downtime due to beam down, majority of the time was for data collection
6 windows of a chip collected, with |
Shift summary, posted by Romain Letrun on 10 Sep 2024, 07:26
|
X-ray delivery
12.8 keV, 1-20 pulses at 47 kHz, 500-700 uJ.
Pulse energy constantly decaying since ~3:00.
Achievements/Observations
Continuous SFX data collection since 00:10.
Issues |
Shift summary, posted by Wonhyuk Jo on 13 Sep 2024, 02:16
|
- DAQ was crashed after taking darks of AGIPD. It was solved by DOC and OCD.
- Laser could not switched from optical to RF lock. Solved by OCD (using doocs).
- Energy scan was attempted, which was not successful. |
Shift summary, posted by Wonhyuk Jo on 14 Sep 2024, 02:23
|
- The seeding optimization result: Total 450 uJ (Seeding of 150 uJ + SASE of 300 uJ). BKR will be able to start optimization on Saturday
around noon if necessary.
- The pump-probe (PP laser and PuMa pulse) experiment data on the substrate peak was collected. |
Shift summary, posted by Raphael de Wijn on 14 Sep 2024, 23:13
|
X-ray delivery
8.951 keV, 1.2 mJ up to 30pulses at 113 kHz
Achievements/Observations |
Shift summary, posted by Wonhyuk Jo on 15 Sep 2024, 02:16
|
- The seeding optimization is ongoing, which was not successful. Now we have a total of 170 uJ including SASE and seeding.
- The option to switch to SASE is relatively not complex and can be done with the support of BKR without a seeding expert. BKR expects to
provide about (more than) 1 mJ. To be discussed with user later. |
Shift summary, posted by Raphael de Wijn on 15 Sep 2024, 23:12
|
X-ray delivery
8.951 keV, 1.6 mJ up to 16 pulses at 113 kHz
Achievements/Observations |
Shift summary, posted by Wonhyuk Jo on 16 Sep 2024, 02:21
|
- Pump-probe experiments are being conducted using PuMa and PP laser.
- The user program is ongoing over the night.
Tomorrow, |
Shift summary, posted by Chan Kim on 25 Sep 2024, 23:36
|
X-ray delivery
6 keV, ~2.8 mJ, stable delivery
Optical laser delivery
ns laser for particle visualization
Achievements/Observations |
Shift summary, posted by Jörg Hallmann on 26 Sep 2024, 01:46
|
Started the day with vacuum & detector issues
real start of the experiments only at about 6 p.m.
measurement of a selection of samples (urea, ludox) using the levitation device |
Shift summary, posted by Chan Kim on 26 Sep 2024, 23:12
|
X-ray delivery
6 keV, ~2.7 mJ, stable delivery
Optical laser delivery
ns laser for particle visualization
Achievements/Observations |
Shift summary, posted by Jörg Hallmann on 27 Sep 2024, 01:51
|
started initial alignment for the ptycho experiment
Continued with XPCS measurement using the levitation device
issues: contribution of the 2nd harmonic of 8 keV at 16 keV visible on the Jungfrau detector - surpressing via mirror alignment not successful |
Shift summary, posted by Chan Kim on 27 Sep 2024, 23:13
|
X-ray delivery
6 keV, ~3.0 mJ, stable delivery
Optical laser delivery
ns laser for particle visualization
Achievements/Observations |
Shift summary, posted by Jörg Hallmann on 28 Sep 2024, 01:31
|
started with data acquisition for the ptycho experiment with different geometries
started with XPCS measurements of capillaries using the FSSS |
Shift summary, posted by Jörg Hallmann on 28 Sep 2024, 23:42
|
continued with the evaluation of the XPCS analysis packages
investigated the effect of alignment optimizations and forced misalignments on the contrast directly with the online XPCS tool
checked additional standard samples |
Shift summary, posted by Chan Kim on 29 Sep 2024, 00:07
|
**X-ray delivery**
- 6 keV, ~2.8 mJ, stable delivery
**Optical laser delivery** |
Shift summary, posted by Chan Kim on 30 Sep 2024, 01:13
|
**X-ray delivery**
- 6 keV, ~2.8 mJ, continuous beam drift in vertical direction (both XTD2 & XTD9 XGMs)
**Optical laser delivery** |
Shift summary, posted by Jörg Hallmann on 30 Sep 2024, 01:50
|
01:49
Worked on the XPCS analysis packages |