Shift summary, posted by Raphael de Wijn on 22 Aug 2024, 23:15
|
X-ray delivery
12.40 - 12.82 keV, ~1.1 mJ
Optical laser delivery |
Shift summary, posted by Peter Zalden on 23 Aug 2024, 08:48
|
Used 9.4 keV with 94 kHz wed and thu nights. Received approx. 0.9 mJ with large fluctuations in pulse energy, however acceptable for the tasks below.
Achievements:
X-ray optics and goniometer aligned for next user experiment 5725
Transmission through Mono #2 recovered and calibrated to |
Shift summary, posted by Chan Kim on 24 Aug 2024, 23:09
|
X-ray delivery
-12.40 - 12.82 keV, XDT9 XGM ~0.81 mJ@ end of shift
Optical laser delivery |
Shift summary, posted by Tokushi Sato on 25 Aug 2024, 22:37
|
X-ray delivery
-12.40 - 12.82 keV, XDT9 XGM ~0.85 mJ, 3 hours interruption by vacuum issue on XTD9
Optical laser delivery |
Shift summary, posted by Tokushi Sato on 26 Aug 2024, 23:05
|
X-ray delivery
-12.40 - 12.82 keV, ~1.3 mJ
Optical laser delivery |
Shift summary, posted by Chan Kim on 27 Aug 2024, 12:17
|
X-ray delivery
12.78 keV, ~1.3 mJ
Optical laser delivery
800 nm laser for jet visualization
Achievements/Observations |
Shift summary, posted by Tokushi Sato on 08 Sep 2024, 06:44
|
X-ray delivery
12.8 keV, ~0.8 mJ
Achievements/Observations |
Shift summary, posted by Romain Letrun on 09 Sep 2024, 06:52
|
X-ray delivery
12.8 keV, 1 pulse, ~0.7 mJ
Achievements/Observations
Except for some downtime due to beam down, majority of the time was for data collection
6 windows of a chip collected, with |
Shift summary, posted by Romain Letrun on 10 Sep 2024, 07:26
|
X-ray delivery
12.8 keV, 1-20 pulses at 47 kHz, 500-700 uJ.
Pulse energy constantly decaying since ~3:00.
Achievements/Observations
Continuous SFX data collection since 00:10.
Issues |
Shift summary, posted by Wonhyuk Jo on 13 Sep 2024, 02:16
|
- DAQ was crashed after taking darks of AGIPD. It was solved by DOC and OCD.
- Laser could not switched from optical to RF lock. Solved by OCD (using doocs).
- Energy scan was attempted, which was not successful. |
Shift summary, posted by Wonhyuk Jo on 14 Sep 2024, 02:23
|
- The seeding optimization result: Total 450 uJ (Seeding of 150 uJ + SASE of 300 uJ). BKR will be able to start optimization on Saturday
around noon if necessary.
- The pump-probe (PP laser and PuMa pulse) experiment data on the substrate peak was collected. |
Shift summary, posted by Raphael de Wijn on 14 Sep 2024, 23:13
|
X-ray delivery
8.951 keV, 1.2 mJ up to 30pulses at 113 kHz
Achievements/Observations |
Shift summary, posted by Wonhyuk Jo on 15 Sep 2024, 02:16
|
- The seeding optimization is ongoing, which was not successful. Now we have a total of 170 uJ including SASE and seeding.
- The option to switch to SASE is relatively not complex and can be done with the support of BKR without a seeding expert. BKR expects to
provide about (more than) 1 mJ. To be discussed with user later. |
Shift summary, posted by Raphael de Wijn on 15 Sep 2024, 23:12
|
X-ray delivery
8.951 keV, 1.6 mJ up to 16 pulses at 113 kHz
Achievements/Observations |
Shift summary, posted by Wonhyuk Jo on 16 Sep 2024, 02:21
|
- Pump-probe experiments are being conducted using PuMa and PP laser.
- The user program is ongoing over the night.
Tomorrow, |
Shift summary, posted by Chan Kim on 25 Sep 2024, 23:36
|
X-ray delivery
6 keV, ~2.8 mJ, stable delivery
Optical laser delivery
ns laser for particle visualization
Achievements/Observations |
Shift summary, posted by Jörg Hallmann on 26 Sep 2024, 01:46
|
Started the day with vacuum & detector issues
real start of the experiments only at about 6 p.m.
measurement of a selection of samples (urea, ludox) using the levitation device |
Shift summary, posted by Chan Kim on 26 Sep 2024, 23:12
|
X-ray delivery
6 keV, ~2.7 mJ, stable delivery
Optical laser delivery
ns laser for particle visualization
Achievements/Observations |
Shift summary, posted by Jörg Hallmann on 27 Sep 2024, 01:51
|
started initial alignment for the ptycho experiment
Continued with XPCS measurement using the levitation device
issues: contribution of the 2nd harmonic of 8 keV at 16 keV visible on the Jungfrau detector - surpressing via mirror alignment not successful |
Shift summary, posted by Chan Kim on 27 Sep 2024, 23:13
|
X-ray delivery
6 keV, ~3.0 mJ, stable delivery
Optical laser delivery
ns laser for particle visualization
Achievements/Observations |