ID |
Date |
Author |
Group |
Subject |
151
|
22 Aug 2024, 23:15 |
Raphael de Wijn | SPB | Shift summary |
X-ray delivery
12.40 - 12.82 keV, ~1.1 mJ
Optical laser delivery
ns laser for jet visualization
ns laser for pumping ready but not used
Achievements/Observations
- Focus IRD
- ns time and spatial overlap
- Collected lyzo data
- Collected dark rhodopsin data
- New opaque foil installed on cube X-ray exit side
Issues
- Roadrunner motor issues solved after manual intervention and computer restart
|
152
|
23 Aug 2024, 08:48 |
Peter Zalden | FXE | Shift summary |
Used 9.4 keV with 94 kHz wed and thu nights. Received approx. 0.9 mJ with large fluctuations in pulse energy, however acceptable for the tasks below.
Achievements:
- X-ray optics and goniometer aligned for next user experiment 5725
- Transmission through Mono #2 recovered and calibrated to match Mono #1
- Understood uneven beam profile of FXE PI originating from the thick XTD2 ATT CVDs. Without them, the beam looks nice.
- Observed that overbending M2 gives better beam profile than underbending under the present conditions
Issues encountered:
- Major issue: M3 RY piezo actuator not working any more. This means beam feedback cannot run and beam keeps drifting off on the instrument apertures. This cannot be compensated by M2 piezo due to the small aperture of M3. The issue was reported wednesday night to PRC, XRO and FXE group and is being worked on by XRO
- One limit switch was found swapped; fixed by FXE engineers
- Some motors moved in the opposite direction as compared to previous commissioning, even though parameters were saved and restored. Not understood, but was easy to work around.
|
153
|
24 Aug 2024, 23:09 |
Chan Kim | SPB | Shift summary |
X-ray delivery
-12.40 - 12.82 keV, XDT9 XGM ~0.81 mJ@ end of shift
Optical laser delivery
-800 nm laser for jet visualization
-487 nm ns laser for pumping
Achievements/Observations
-Focus IRD
-Collected 10 ns SFX data
Issues
-AGIPD chiller was down |
154
|
25 Aug 2024, 22:37 |
Tokushi Sato | SPB | Shift summary |
X-ray delivery
-12.40 - 12.82 keV, XDT9 XGM ~0.85 mJ, 3 hours interruption by vacuum issue on XTD9
Optical laser delivery
-800 nm laser for jet visualization
-487 nm ns laser for pumping
Achievements/Observations
-Focus IRD
-Collected SFX data
Issues
-AGIPD chiller was down
-Issue with tunnel vacuum valves, at around 7 pm, ended shift early |
155
|
26 Aug 2024, 23:05 |
Tokushi Sato | SPB | Shift summary |
X-ray delivery
-12.40 - 12.82 keV, ~1.3 mJ
Optical laser delivery
-800 nm laser for jet visualization
-525 nm ns laser for pumping
Achievements/Observations
-Focus IRD
-Collected SFX data
Issues
-SPB_EHC_VAC/DCTRL/GAUGE_FR_1_Value triggered interlock, we could not open gate valve : SPB_IRU_VAC/VALVE/VALVE_INLINE_3 |
156
|
27 Aug 2024, 12:17 |
Chan Kim | SPB | Shift summary |
X-ray delivery
Optical laser delivery
- 800 nm laser for jet visualization
Achievements/Observations
- Collected SFX data
- Calibration date for HIREX measured (at different X-ray energy)
|
158
|
08 Sep 2024, 06:44 |
Tokushi Sato | SPB | Shift summary |
X-ray delivery
12.8 keV, ~0.8 mJ
Achievements/Observations
- Data collection with fixed target
Issues
- M1 and M2 position on SPB/SFX Setpoint J was far from optimal
- Beam position in X was drifting to minus direction all time |
160
|
09 Sep 2024, 06:52 |
Romain Letrun | SPB | Shift summary |
X-ray delivery
- 12.8 keV, 1 pulse, ~0.7 mJ
Achievements/Observations
- Except for some downtime due to beam down, majority of the time was for data collection
- 6 windows of a chip collected, with variations in shots spacing (30 um and 60 um) and rotation
Issues
- Something is still causing beam drift constantly, even though we can correct it with the feedback.
|
162
|
10 Sep 2024, 07:26 |
Romain Letrun | SPB | Shift summary |
X-ray delivery
- 12.8 keV, 1-20 pulses at 47 kHz, 500-700 uJ.
- Pulse energy constantly decaying since ~3:00.
Achievements/Observations
- Continuous SFX data collection since 00:10.
Issues
- Apparent mechanical issue with one motor. To be investigated before the restart of beam delivery.
- Beam horizontal drift still present, but not as pronounced as earlier this week.
|
164
|
13 Sep 2024, 02:16 |
Wonhyuk Jo | MID | Shift summary |
- DAQ was crashed after taking darks of AGIPD. It was solved by DOC and OCD.
- Laser could not switched from optical to RF lock. Solved by OCD (using doocs).
- Energy scan was attempted, which was not successful.
- Seeding optimization was ongoing. It will continue tomorrow morning. Still there is intensity loss during the energy scan.
- We might see second (maybe higher) photon energy component on the beam. (https://mylog.connect.xfel.eu/#narrow/stream/201-MID_6877_UrsStaub/topic/.E2.9C.94.20Troubleshooting/near/72056)
- The beam was focused with CRL 2 arm 4 and 5. A precise beam size measurement would be useful.
- The timing of XFEL and PP laser has been found from a frosted-YAG on the X-ray eye. T0 = 1374.94.
- The air gap between the MPC and DES are closed.
- The first user sample is mounted and delivered in the PUMA setup.
- The spatial overlap of XFEL and PP laser has been found at the sample position with YAG crystal.
- The substrate peak (th = 20.7, tth = 41.4) was found on the fluorescent screen.
- The SDL diamond detector was aligned on the beam, and now move it out.
Tomorrow
- Continuing of optimization of seeding and improving the energy scan.
- Cool down the sample and search the film peak on AGIPD.
|
167
|
14 Sep 2024, 02:23 |
Wonhyuk Jo | MID | Shift summary |
- The seeding optimization result: Total 450 uJ (Seeding of 150 uJ + SASE of 300 uJ). BKR will be able to start optimization on Saturday around noon if necessary.
- The pump-probe (PP laser and PuMa pulse) experiment data on the substrate peak was collected.
- Found the film peak on the AGIPD. Intensity optimization was not successful. We keep losing diffraction peak intensity over the measurement time and number of pulses. We assume the X-ray-induced heating can affect the diffraction intensity.
- Rotating Phi angle by moving the manipulator Z direction helped to bring the peak out of the detector gap.
|
168
|
14 Sep 2024, 23:13 |
Raphael de Wijn | SPB | Shift summary |
X-ray delivery
8.951 keV, 1.2 mJ up to 30pulses at 113 kHz
Achievements/Observations
Beam trajectory at 8.951 keV
IRDa slits left/right blades connected
Sweeped pulses could be observed on fluorescent paper in front of the Downstream screen
Mirror synchronisation parameters could be found
Jungfrau halves were closed and the downstream cone installed
Background was minimised using the IRDa slits |
169
|
15 Sep 2024, 02:16 |
Wonhyuk Jo | MID | Shift summary |
- The seeding optimization is ongoing, which was not successful. Now we have a total of 170 uJ including SASE and seeding.
- The option to switch to SASE is relatively not complex and can be done with the support of BKR without a seeding expert. BKR expects to provide about (more than) 1 mJ. To be discussed with user later.
- An investigation of the asymmetric film peak is ongoing to optimize the measurement conditions, such as diffraction angle, sample temperature dependence, and pump laser effect. Still, the PP laser effect on the diffraction peak on the asymmetric peak is unclear. The higher sample temperature suppresses the diffraction intensity. Unclear intensity changes over time have been observed.
- The AGIPD moved closer to the sample to cover the more solid angle.
- The MDL of the coupled motion of the hexapod and puma manipulator is not working reliably.
- The delay time between the X-ray and the PP laser was cross-checked to ensure its correctness. No timing drift was confirmed.
- Laser pump and X-ray probe experiment is being conducted at the vicinity of subtract peak. After optimizing the spatial overlap by scanning, the pump laser effect was clearly achieved.
- The user program will be ongoing over the night.
|
170
|
15 Sep 2024, 23:12 |
Raphael de Wijn | SPB | Shift summary |
X-ray delivery
8.951 keV, 1.6 mJ up to 16 pulses at 113 kHz
Achievements/Observations
More than 1h of beam sweeping with lysozyme crystals
Several runs of vitamin C beam sweeping data
Issues:
Several synchronization methods were tested for the mirrors but without improving it
|
171
|
16 Sep 2024, 02:21 |
Wonhyuk Jo | MID | Shift summary |
- Pump-probe experiments are being conducted using PuMa and PP laser.
- The user program is ongoing over the night.
Tomorrow,
- Rotating the sample phi angle. The sample holder will be retracted from the MPC.
- Search the asymmetric film peak and conduct the PuMa and PP laser experiment. |
176
|
25 Sep 2024, 23:36 |
Chan Kim | SPB | Shift summary |
X-ray delivery
- 6 keV, ~2.8 mJ, stable delivery
Optical laser delivery
- ns laser for particle visualization
Achievements/Observations
- NKB focus optimized
- particle injection tested with gold nanoparticles
- ns laser roughly aligned with particle beam
- Julabo chiller (AGIPD) is still on target (-32 degree)
Issues
- XTD2_ATT Arm4 (600um thick CVD) is damaged (most probably last week)
|
177
|
26 Sep 2024, 01:46 |
Jörg Hallmann | MID | Shift summary |
Started the day with vacuum & detector issues
real start of the experiments only at about 6 p.m.
measurement of a selection of samples (urea, ludox) using the levitation device
issues: vacuum (behind AGIPD), motor (bend2 of the DES was in error - used for the beamstop) |
178
|
26 Sep 2024, 23:12 |
Chan Kim | SPB | Shift summary |
X-ray delivery
- 6 keV, ~2.7 mJ, stable delivery
Optical laser delivery
- ns laser for particle visualization
Achievements/Observations
- NKB focus optimized
- ns laser aligned with particle beam
- particle injector position optimized
- measured 3 samples: roughly 2 hours per each sample
- one sample was measured with and without He gas
- Julabo chiller (AGIPD) is still on target (-32 degree)
Issues
- Beam drift in vertical direction: Rz has to be corrected during the measurement and moved by 0.2 mm in total in whole day (~18 hours)
|
179
|
27 Sep 2024, 01:51 |
Jörg Hallmann | MID | Shift summary |
started initial alignment for the ptycho experiment
Continued with XPCS measurement using the levitation device
issues: contribution of the 2nd harmonic of 8 keV at 16 keV visible on the Jungfrau detector - surpressing via mirror alignment not successful |
181
|
27 Sep 2024, 23:13 |
Chan Kim | SPB | Shift summary |
X-ray delivery
- 6 keV, ~3.0 mJ, stable delivery
Optical laser delivery
- ns laser for particle visualization
Achievements/Observations
- measured 1 sample roughly for 9 hours (hit rate went down in the afternoon)
- Julabo chiller (AGIPD) is still on target (-32 degree)
Issues
- NKB mirror drifted in vertical direction: it was optimized again at around 9pm
- extremely low hit rate even with sucrose (extremely few particles were observed in sidemic, 1 particle within a few seconds): maybe the aerodynamic lens should be cleaned
|