149
|
13 Aug 2024, 02:04 |
Wonhyuk Jo | MID | Shift summary | Found the interference fringe at Suna microscope
with Zyla cam from MID split-and-delay line.
The fringe patterns were recorded |
|
148
|
12 Aug 2024, 23:47 |
Raphael de Wijn | SPB | Shift summary |
X-ray
delivery
11.56 keV, 202 pulses @0.5 MHz, |
|
147
|
12 Aug 2024, 02:07 |
Wonhyuk Jo | MID | Shift summary | Found spatial overlap at Suna microscope
with Zyla cam.
The splitting ratio was obtained about |
|
146
|
11 Aug 2024, 23:07 |
Raphael de Wijn | SPB | Shift summary | X-ray delivery
11.56 keV 202 pulses @0.5 MHz,
~1.0 mJ |
|
145
|
11 Aug 2024, 14:33 |
Romain Letrun | SPB | Shift summary | Summary 06.08
- 10.08
X-ray |
|
144
|
11 Aug 2024, 02:15 |
Wonhyuk Jo | MID | Shift summary | Found the spatial overlap on the Suna microscope
with Zyla.
Found the SDL motor position giving |
|
143
|
11 Aug 2024, 00:13 |
Andreas Galler | PRC | Attention | EPS Interlock change for Mode30:
the 3 HIREX Interlock conditions had
been disabled |
|
142
|
10 Aug 2024, 07:19 |
Romain Letrun | SPB | Issue | The SASE1 HIREX interlock is not working
as expected.
At the position 'OUT' (step |
|
141
|
10 Aug 2024, 01:17 |
Jörg Hallmann | MID | Shift summary | Found the delay time from upper and lower
branches of SDL with a frosted-YAG.
The upper branch is -512.8 and the |
|
140
|
09 Aug 2024, 01:59 |
Jörg Hallmann | MID | Shift summary | optimized the SDL alignment
found timing of the upper (-520
ps) and lower branch (-514.5 ps) of the SDL |
|
139
|
08 Aug 2024, 00:18 |
Jörg Hallmann | MID | Shift summary | optimization of seeding (still not as good
as needed)
set position for the two color |
|
138
|
29 Jul 2024, 23:22 |
Romain Letrun | SPB | Shift summary | X-ray
delivery
11.0 keV, 1-351 pulses |
|
137
|
29 Jul 2024, 06:45 |
Giuseppe Mercurio | SCS | Shift summary | ## Shift summary night July 28th-29th
Achievements:
- we saw signal on both MCPs (with |
|
136
|
28 Jul 2024, 23:34 |
Romain Letrun | SPB | Shift summary | X-ray
delivery
11.0 keV, 1-352 pulses |
|
135
|
27 Jul 2024, 23:42 |
Romain Letrun | SPB | Shift summary | X-ray delivery
- 9.22 and 11.0 keV, 1-352 pulses
@ 1.1 MHz, 600-1400 uJ. |
|
134
|
27 Jul 2024, 09:10 |
Harald Sinn | PRC | Issue | SASE1: Solid attenuator att5 is in error.
When it is tried to move it out, the arm
lifts, but does not reach the final position |
|
133
|
24 Jul 2024, 15:22 |
Giuseppe Mercurio | SCS | Shift summary |
Shift
summary (Natalia, Giuseppe)
Achievements:
M1, M2 pitches adjusted
Grating |
|
132
|
24 Jul 2024, 11:35 |
Harald Sinn | PRC | Issue | The control rack of the soft mono at SASE3
has some failure. Leandro from EEE will enter
the XTD10 at 12:00. |
|
131
|
24 Jul 2024, 10:26 |
Harald Sinn | PRC | Issue | In SASE2 undualtor cell 10 has issues.
Suren K. will do a ZZ at 11:30 to fix it
(if possible). Estimated duration: 1-3 hours. |
|
130
|
23 Jul 2024, 17:17 |
Idoia | XRO | Shift summary |
ZZ
access at XTD10
The