Issue, posted by Romain Letrun on 27 Feb 2024, 09:56 8x 
 | 
The status of the XTD2 attenuators has been checked during the experiment last week and many were found to cause disturbances in the wavefront ranging 
from mild to severe.
 
 
Attachment 1: No attenuator | 
 
 
Shift summary, posted by Romain Letrun on 29 Feb 2024, 10:04 
 | 
X-ray delivery
 
 
 
	10 keV, up to 160 pulses at 1.1MHz, 1.8 mJ
 
 
 
Optical laser 
delivery | 
 
 
Shift summary, posted by Romain Letrun on 01 Mar 2024, 10:54 
 | 
X-ray delivery
 
 
 
	10 keV, up to 128 pulses with custom bunch pattern, 1.6-2.0 mJ
 
 
 
Optical laser delivery
 
 
 
	NA
 
 
 
Achievements/Observations | 
 
 
Shift summary, posted by Raphael de Wijn on 04 Mar 2024, 06:52 
 | 
 
X-ray delivery
 
 
 
	10 keV, up to 128 pulses with custom bunch pattern, 1.6-2.0 mJ
 
 
 
Optical laser delivery
 
 
 
	NA
 
 
 
Achievements/Observations | 
 
 
Issue, posted by Romain Letrun on 04 Mar 2024, 09:42  
 | 
The number of bunches during the last night shift kept being changed down to 24 by the device SA1_XTD2_WATCHDOG/MDL/ATT1_MONITOR020 acting on SA1_XTD2_BUNCHPATTERN/MDL/CONFIGURATOR. 
This was not the case during the previous shifts, even though the pulse energy was comparable. Looking at the history of SA1_XTD2_WATCHDOG/MDL/ATT1_MONITOR020, 
it looks like this device was started at 16:26:25 on Friday, 1st March. | 
 
 
Shift summary, posted by Marcin Sikorski on 05 Mar 2024, 07:41 
 | 
 
	10 keV beam
 
	Detector: JUNGFRAU in the burst mode (16 memory cells)
 
	Achievements:
 
	
 
		multiple sfx data sets (lysozyme) 
with 4 and 8 pulses (at 1.1MHz) per exposure taken
 
	
 
	
 
 | 
 
 
Status, posted by Romain Letrun on 13 Mar 2024, 10:09 7x 
 | 
We checked the XTD2 attenuators following the intervention from XRO (compar ewith elog:37, before the intervention).
 
 
The wavefront shows similar distortions with the 75 and 150 um as earlier, which is not too surprising since the cracks are vertical.
 
 
Attachments 1-5: Beam on SPB_XTD9_SCR with XTD2 attenuator CVDs | 
 
 
Shift summary, posted by Chan Kim on 13 Mar 2024, 23:41 
 | 
X-ray delivery
 
 
 
	6 keV, 2.6 mJ/pulse, stable delivery
 
 
 
Optical laser delivery
 
 
 
	800nm PP laser, stable delivery
 
 
 
Achievements/Observations | 
 
 
Shift summary, posted by Chan Kim on 15 Mar 2024, 00:16 
 | 
X-ray delivery
 
 
6 keV, 2.4 mJ/pulse, stable delivery
 
 
Optical laser delivery | 
 
 
Issue, posted by Romain Letrun on 15 Mar 2024, 07:08  
 | 
There are now two watchdogs for the XTD2 attenuator running at the same time
 
 
 
	SA1_XTD2_WATCHDOG/MDL/ATT1_MONITOR020
 
	SA1_XTD2_OPTICS_PROTECTION/MDL/ATT1
 
 
 
that are configured differently, 
which results in different pulse limits (see attachment). | 
 
 
Shift summary, posted by Chan Kim on 15 Mar 2024, 23:43 
 | 
**X-ray delivery**
 
 
- 6 keV, 3.2 mJ/pulse, stable delivery
 
 
**Optical laser delivery** | 
 
 
Shift summary, posted by Raphael de Wijn on 21 Mar 2024, 06:33 
 | 
X-ray delivery
 
- 9.3 keV, >3 mJ/pulse, stable delivery 
 
 
Optical laser delivery | 
 
 
Shift summary, posted by Raphael de Wijn on 22 Mar 2024, 06:35 
 | 
X-ray delivery
 
- 9.3 keV, >3 mJ/pulse, beam down around 30min
 
 
Optical laser delivery | 
 
 
Shift summary, posted by Chan Kim on 28 Mar 2024, 14:54 
 | 
X-ray delivery
 
 
 
	12.72 keV, 10 Hz, NOT stable delivery, pointing drastically changed in the afternoon, presumably due to the train-on-demand operation 
at SASE2
 
 
 
Optical laser delivery | 
 
 
Issue, posted by Chan Kim on 28 Mar 2024, 14:56  
 | 
| Pulse energy fluctuation observed after full train operation in SA2 starts. | 
 
 
Shift summary, posted by Chan Kim on 29 Mar 2024, 22:38 
 | 
X-ray delivery
 
- 12.72 keV, 10Hz, ~1.4 mJ/pulse, stable delivery 
 
 
Optical laser delivery | 
 
 
Issue, posted by Romain Letrun on 30 Mar 2024, 06:59  
 | 
DOOCS panels are again incorrectly reporting the FXE shutter as opened when it is in fact closed. This had been fixed after it was last reported in February 
(elog:24), but reappeared now. | 
 
 
Issue, posted by Chan Kim on 30 Mar 2024, 22:02   
 | 
Continuous pointing drift in horizontal direction.
 
 
It may trigger a vacuum spike at SPB OH (MKB_PSLIT section) at 21:07 pm.
 
 
  | 
 
 
Shift summary, posted by Chan Kim on 30 Mar 2024, 22:50 
 | 
X-ray delivery
 
 
- 12.72 keV, 10Hz, ~1.4 mJ/pulse, continuous beam drift in the horizontal direction observed
 
 
Optical laser delivery | 
 
 
Shift end, posted by Adam Round on 31 Mar 2024, 23:20 
 | 
X-ray delivery
 
 
 
	12.72 keV, 10Hz, ~1.4 mJ/pulse, some beam drift in the horizontal direction observed (probably mirror related)
 
 
 
Optical 
laser delivery |