ID |
Date |
Author |
Group |
Subject |
Text |
|
93
|
02 May 2024, 23:19 |
Juncheng E | SPB | Shift summary | X-ray delivery
9.3 keV, 3.3 mJ, 190 pulses/train
Optical
later delivery |
|
92
|
01 May 2024, 23:31 |
Juncheng E | SPB | Shift summary | X-ray delivery
9.3 keV, 3.3 mJ, 190 pulses/train
Optical
later delivery |
|
91
|
01 May 2024, 16:39 |
Andreas Galler | PRC | Issue | 840 pulses not possible at SXP due to big
brother settings for the EPS Power Limit
rule. The minimum pulse energy was assumed |
|
90
|
27 Apr 2024, 02:11 |
Jörg Hallmann | MID | Shift summary |
optimized
the FEL energy on the absorption edge of
Iridium
measurements on the SDW |
|
89
|
25 Apr 2024, 21:11 |
Frederik Wolff-Fabris | PRC | Status | V0 valve for SA2 closed as the pump P22090I
at HED branch enters in wrong state. This
closed nearby vacuum valves for HED branch and |
|
88
|
25 Apr 2024, 01:50 |
Jörg Hallmann | MID | Shift summary | instrument alignment including NaFos, DES
spectrometer, diamond detector, PUMA &
test samples |
|
87
|
22 Apr 2024, 23:26 |
Raphael de Wijn | SPB | Shift summary | End of User beamtime 5157
X-ray
delivery: |
|
86
|
22 Apr 2024, 00:06 |
Raphael de Wijn | SPB | Shift summary |
User
beamtime 5157 day 5
X-ray delivery: |
|
85
|
20 Apr 2024, 23:58 |
Jan Gruenert | PRC | SA2 status | 20.4.2024 / 22h51:
DOC informed PRC that the SASE2 topic
broker had to be restarted. |
|
84
|
20 Apr 2024, 23:37 |
Juncheng E | SPB | Shift summary | Staff: JK, SB, JE, AS, RW, FK
**X-ray delivery:**
- 21 keV, ~500 uJ |
|
83
|
18 Apr 2024, 19:31 |
Jan Gruenert | PRC | Status | The intra-bunchtrain feedback (IBFB) was
not active until today afternoon.
Although not strictly required or |
|
82
|
13 Apr 2024, 23:03 |
Peter Zalden | FXE | Shift summary | Measurements to check the impact of bunch
compression on FXE mono transmission were
successful. We could change the peak current |
|
81
|
11 Apr 2024, 21:54 |
Antje Trapp | XRO | SASE1 MIRROR MOTORS CALIBRATED | Dear all,
we calibrated the mirror vertical
motors to their geometrically neutral. |
|
80
|
10 Apr 2024, 17:03 |
Kelin Tasca | XRO | M3 calibration | - M3 TX moved to 0 in steps of 1 mm and
beam on FXE Pop-In corrected with M3 RY (+)
and M2 RY |
|
79
|
10 Apr 2024, 16:35 |
Antje Trapp | XRO | start of shift - status | Starting shift with mirror motor calibration:
- beam is centered on FEL imager
- pblm in XTD9 is inserted |
|
78
|
10 Apr 2024, 16:35 |
Antje Trapp | XRO | start of shift - status | Starting shift with mirror motor calibration:
- found solid attenuator 0.5mm
silicon inserted |
|
77
|
10 Apr 2024, 11:55 |
Harald Sinn | PRC | Status | Yesterday two motors of the SASE2 seeding
mono were damaged. The mono was exchanged
in the afternoon and pumped down. Currently, |
|
76
|
08 Apr 2024, 06:37 |
Marcin Sikorski | SPB | Shift end | In-house/commissioning beam time summary
night 5
X-ray delivery: |
|
75
|
07 Apr 2024, 07:04 |
Raphael de Wijn | SPB | Shift summary | In-house/commissioning beam time summary
night 4
X-ray delivery: |
|
74
|
06 Apr 2024, 07:06 |
Raphael de Wijn | SPB | Shift summary | Staff: MS, RB, PS, RdW
In-house/commissioning beam time
summary night 3 |
|
|